State | NSW |
---|
Date of Visit | 15/10/2020 |
---|
Technician's Name | Shane Preston |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50947 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | tweed_heads |
---|
|
|
---|
Location Name | Tweed Heads & Warehouse 1 |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DBA |
CB8 |
Y |
- |
- |
P |
|
|
|
CB10 |
Y |
.009 |
.018 |
P |
|
|
|
CB12 |
Y |
0.032 |
0.198 |
P |
|
|
|
CB14 |
Y |
- |
- |
P |
|
|
|
CB16 |
Y |
.009 |
.015 |
P |
|
|
|
CB18 |
Y |
- |
- |
P |
|
|
|
CB19 |
Y |
- |
- |
P |
|
|
|
CB20 |
Y |
.019 |
.028 |
P |
|
|
|
CB22 |
Y |
- |
- |
P |
|
|
|
CB24 |
Y |
.017 |
.029 |
P |
|
|
|
CB26 |
Y |
.043 |
.033 |
P |
|
|
|
CB28 |
Y |
- |
- |
P |
|
|
|
CB32 |
Y |
- |
- |
P |
|
|
|
CB35 |
Y |
- |
- |
P |
|
|
|
CB36 |
Y |
.016 |
.025 |
P |
|
|
DBB |
CB1 |
Y |
.008 |
.018 |
P |
|
|
|
CB2 |
Y |
.010 |
.020 |
P |
|
|
|
CB3 |
Y |
.009 |
.019 |
P |
|
|
|
CB4 |
Y |
.015 |
.024 |
P |
|
|
|
CB5 |
Y |
.010 |
.020 |
P |
|
|
|
CB6 |
Y |
.008 |
.010 |
P |
|
|
|
CB7 |
Y |
- |
- |
P |
|
|
|
CB8 |
Y |
- |
- |
P |
|
|
|
CB9 |
Y |
- |
- |
P |
|
|
|
CB10 |
Y |
.009 |
.018 |
P |
|
|
|
CB11 |
Y |
.009 |
.017 |
P |
|
|
|
CB12 |
Y |
.026 |
.018 |
P |
|
|
|
CB13 |
Y |
.010 |
.020 |
P |
|
|
|
CB14 |
Y |
.010 |
.019 |
P |
|
|
|
CB15 |
Y |
.009 |
.019 |
P |
|
|
|
CB16 |
Y |
.009 |
.018 |
P |
|
|
|
CB17 |
Y |
.009 |
.019 |
P |
|
|
|
CB18 |
Y |
.010 |
.018 |
P |
|
|
|
CB19 |
Y |
.009 |
.019 |
P |
|
|
|
CB20 |
Y |
.008 |
.018 |
P |
|
|
|
CB21 |
Y |
- |
- |
P |
|
|
|
CB22 |
Y |
.011 |
.011 |
P |
|
|
|
CB23 |
Y |
.013 |
.022 |
P |
|
|
|
CB24 |
Y |
.009 |
.019 |
P |
|
|
|
CB25 |
Y |
- |
- |
P |
|
|
|
CB26 |
Y |
.009 |
.018 |
P |
|
|
|
CB27 |
Y |
0.010 |
0.020 |
P |
|
|
|
CB28 |
Y |
- |
- |
P |
|
|
|
CB29 |
Y |
- |
- |
P |
|
|
|
CB30 |
Y |
- |
- |
P |
|
|
|
CB31 |
Y |
.010 |
.019 |
P |
|
|
|
CB32 |
Y |
.030 |
.030 |
P |
|
|
|
CB33 |
Y |
- |
- |
P |
|
|
|
CB34 |
Y |
- |
- |
P |
|
|
|
CB35 |
Y |
.007 |
.017 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DBA |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DBA |
4 |
Y |
Y |
Y |
P |
|
|
|
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Are there any Warranty items needing to be repaired? | No |
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 15/04/2021 |
---|
| |
---|
| |