Partner NameBuilt Electrical Australia
StateVIC
Date of Visit06/11/2020
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number51755
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICmaribyrnong

Location NameMARIBYRNONG
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-1A 01 Y 28 38 P
DB-1A 02 Y 28 18 P
DB-1A 03 Y 28 38 P
DB-1A 08 Y 11 21 P
DB-1A 10 Y 10 20 P
DB-1A 12 Y 9 19 P
DB-1A 05 Y 25 34 P
DB-1A 07 Y 28 25 P
DB-1A 09 Y 28 25 P
DB-1A 11 Y 23 33 P
DB-1A 17 Y 22 12 P
DB-1A 19 Y 28 18 P
DB-1A 21 Y 19 9 P
DB-1A 27 Y 25 15 P
DB-1A 29 Y 19 12 P
DB-1A 31 Y 65 55 P
DB-1B 01 Y 24 34 P
DB-1B 02 Y 122 34 P
DB-1B 03 Y 28 35 P
DB-1B 04 Y 24 59 P
DB-1B 05 Y 27 20 P
DB-1B 06 Y 23 33 P
DB-1B 07 Y 28 17 P
DB-1B 08 Y 24 35 P
DB-1B 09 Y 29 17 P
DB-1B 10 Y 23 33 P
DB-1B 11 Y 31 22 P
DB-1B 12 Y 23 33 P
DB-1B 13 N F F F FAILED TEST Y
DB-1B 14 Y 23 33 P
DB-1B 15 Y 27 37 P
DB-1B 16 Y 23 33 P
DB-1B 17 Y 27 37 P
DB-1B 18 Y 24 19 P
DB-1B 19 Y 23 33 P
DB-1B 20 Y 27 39 P
DB-1B 21 Y 25 17 P
DB-1B 22 Y 24 20 P
DB-1B 23 Y 25 16 P
DB-1B 24 Y 28 18 P
DB-1B 25 Y 148 18 P
DB-1B 26 Y 28 18 P
DB-1B 27 Y 28 21 P
DB-1B 28 Y 24 21 P
DB-1B 29 Y 26 17 P
DB-1B 30 Y 28 18 P
DB-1B 31 Y 31 20 P
DB-1B 32 Y 149 17 P
DB-1B 33 Y 47 50 P TRIPPING- CAUSED BY FAULTY LIGHT BOXES
DB-1B 34 Y 28 29 P
DB-1B 35 Y 28 30 P
DB-1B 36 Y 28 18 P
DB-1B 37 Y 62 49 P
DB-1B 38 Y 28 39 P
DB-1B 39 Y 38 162 P
DB-1B 40 Y 31 37 P
DB-1B 41 Y 24 15 P
DB-1B 42 Y 28 18 P
DB-1B 44 Y 24 16 P
DB-1B 46 Y 24 18 P
DB-1B 48 Y 23 15 P
DB-2 01 Y 29 19 P
DB-2 02 Y 28 38 P
DB-2 03 Y 29 39 P
DB-2 04 Y 29 19 P
DB-2 05 Y 29 19 P
DB-2 06 Y 24 16 P
DB-2 07 Y 29 39 P
DB-2 08 Y 24 16 P
DB-2 09 Y 29 19 P
DB-2 10 Y 31 42 P
DB-2 11 Y 28 19 P
DB-2 12 Y 27 37 P
DB-2 13 Y 29 19 P
DB-2 14 Y 25 35 P
DB-2 15 Y 29 39 P
DB-2 16 Y 30 21 P
DB-2 17 Y 30 40 P
DB-2 18 Y 23 33 P
DB-2 19 Y 31 41 P
DB-2 20 Y 27 39 P
DB-2 21 Y 29 19 P
DB-2 22 Y 26 18 P
DB-2 23 Y 31 40 P
DB-2 24 Y 165 21 P
DB-2 25 Y 28 38 P
DB-2 26 Y 24 34 P
DB-2 27 Y 30 40 P
DB-2 28 Y 23 33 P
DB-2 29 Y 43 116 P
DB-2 30 Y 28 18 P
DB-2 31 Y 27 37 P
DB-2 32 Y 27 18 P
DB-2 33 Y 28 18 P
DB-2 34 Y 27 33 P
DB-2 35 Y 28 18 P
DB-2 36 Y 23 33 P
DB-2 37 Y 31 81 P
DB-2 38 Y 28 18 P
DB-2 39 Y 23 33 P
DB-2 40 Y 23 33 P
DB-2 41 Y 27 38 P
DB-2 42 Y 29 19 P
DB-2 44 Y 123 18 P
DB-2 46 Y 25 16 P
DB-2 48 Y 24 16 P
DB-2 49 Y 25 15 P
DB-2 50 Y 24 15 P
DB-2 51 Y 28 18 P
DB-2 52 Y 31 36 P
DB-2 53 Y 28 18 P
DB-2 54 Y 27 19 P
DB-2 55 Y 28 18 P
DB-2 56 Y 26 17 P
DB-2 57 Y 28 18 P
DB-2 59 Y 29 19 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-2 2 R Y Y Y P
DB-2 6 S Y Y Y P
DB-2 7 S Y Y Y P
Db-2 9 S Y Y Y P
DB-2 11 S Y Y Y P
DB-2 13 S Y Y Y P
DB-2 14 S Y Y Y P
DB-2 17 S Y Y Y P
DB-2 18 S Y Y Y P
DB-2 19 S Y N Y F FAILED BATTERY TEST Y N
DB-2 20 R Y Y Y P
DB-2 22 R Y Y Y P
DB-2 24 S Y Y Y P
DB-2 26 S Y Y Y P
DB-2 27 S Y Y Y P
DB-2 28 S Y Y Y P
DB-2 29 S Y Y Y P
DB-3 30 S Y Y Y P
DB-3 31 S Y Y Y P
DB-3 32 S Y Y Y P
DB-3 36 R Y Y Y P
DB-3 39 R Y Y Y P
DB-3 40 S Y Y Y P
DB-3 42 R Y Y Y P
DB-3 43 R Y Y Y P
DB-3 44 R Y Y Y P
DB-2 46 R Y Y Y P
DB-2 47 R Y Y Y P
DB-2 48 R Y Y Y P
DB-2 49 R Y Y Y P
DB-2 50 R Y Y Y P
DB-2 51 R Y Y Y P
DB-2 52 S Y Y Y P
DB-2 53 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-2 1 Y Y Y P
DB-2 3 Y Y Y P
DB-2 4 Y Y Y P
DB-2 5 Y Y Y P
DB-2 8 Y Y Y P
DB-2 10 Y Y Y P
DB-2 12 Y Y Y P
DB-2 15 Y Y Y P
DB-2 16 Y Y Y P
DB-2 21 Y Y Y P
DB-2 23 Y Y Y P
DB-2 25 Y Y Y P
DB-3 33 Y Y Y P
DB-3 34 Y Y Y P
DB-3 35 Y Y Y P
DB-3 36 Y Y Y P
DB-3 37 Y Y Y P
DB-3 41 Y Y Y P
DB-3 45 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED HIBAY Y
LED DOWNLIGHT Y
T5 TWIN BARE BATTEN Y
T5 SINGLE DIFFUSED Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
CA7-12-10 DB2 1 NOISY CONTACTOR Y N N REPLACED WITH NEW
CB13 DB-1B 1 FAILED RCD TEST Y N N REPLACED WITH 20A RCBO
SQUARE HALOGEN FITTING FRONT ENTRANCE FOYER 3 FAILED TO ILLUMINATE N Y TBC QUOTE TO BE SENT FOR APPROVAL
EM19 VACUUMS 1 FAILED BATTERY TEST Y N N REPLACED WITH NEW
LED HIGHBAY IRONS/KITCHEN SMEG/FRIDGES 4 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW - WITH 3 OF REQUIRING 2M BLACK EXTENSION LEADS
CB 33 TRIPPING DB-1B 1 TRIPPING Y N N TRIPPING DUE TO RACK LIGHTS BEING FAULTY. SEE BELOW.
RACK LIGHT BOX SMART SPEAKERS 1 FAULTY N Y TBC QUOTE TO BE SENT FOR APPROVAL
LED DOWNLIGHT MALE TOILET 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW CONVERSION PLATE
TWIN PLC GLOBE FITTING RECESSED MALE TOILET 1 FAILED TO ILLUMINATE N Y TBC QUOTE TO BE SENT FOR APPROVAL
TWIN PLC GLOBE RECESSED FITTING FEMALE TOILET 1 FAILED TO ILLUMINATE N Y TBC QUOTE TO BE SENT FOR APPROVAL
WALL BUNKER LIGHTS FRONT OF STORE WALL LIGHTS EXTERNAL 2 FAILED TO ILLUMINATE Y N N REPLACED WITH 2 X NEW POWERBALL SUPER
TWIN PLC GLOBE RECESSED FITTING DISABLED TOILET 2 FAILED TO ILLUMINATE N Y TBC QUOTE TO BE SENT FOR APPROVAL
BATTEN HOLDER AND GLOBE FRONT FLASHING LIGHTS 1 DAMAGED BATTEN HANGING FROM CABLE Y N TBC REPLACED WITH NEW BATTEN AND 1 LAMP
CARPARK FLOOD LIGHTS CARPARK SIDE 3 FAILED TO ILLUMINATE N Y TBC QUOTE TO BE SENT FOR APPROVAL
CARPARK FLOOD LIGHTS CARPARK FRONT 2 FAILED TO ILLUMINATE N Y TBC QUOTE TO BE SENT FOR APPROVAL
LARGE SQUARE SURFACE MOUNT BULK LIGHT EXTERNAL FRONT ENTRANCE 1 FAILED TO ILLUMINATE N Y TBC QUOTE TO BE SENT FOR APPROVAL
Site Status SelectorStore now fully compliant
Next Test Due in 6 months06/05/2021