Partner Name | CROWE ELECTRICAL SERVICES PTY LTD |
---|
State | VIC |
---|
Date of Visit | 10/11/2020 |
---|
Technician's Name | Connor Medcalf |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 51759 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | melton |
---|
|
|
---|
Location Name | Melton |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Unit 1 DB |
1 |
Y |
31 |
35 |
P |
|
|
|
3 |
Y |
34 |
36 |
P |
|
|
|
5 |
Y |
32 |
36 |
P |
|
|
|
7 |
Y |
33 |
35 |
P |
|
|
|
9 |
Y |
32 |
35 |
P |
|
|
|
10 |
Y |
34 |
36 |
P |
|
|
|
11 |
Y |
35 |
37 |
P |
|
|
|
12 |
Y |
35 |
38 |
P |
|
|
|
13 |
Y |
36 |
39 |
P |
|
|
|
14 |
Y |
37 |
39 |
P |
|
|
|
15 |
Y |
35 |
38 |
P |
|
|
|
16 |
Y |
33 |
36 |
P |
|
|
|
17 |
Y |
33 |
35 |
P |
|
|
|
18 |
Y |
34 |
34 |
P |
|
|
|
19 |
Y |
35 |
36 |
P |
|
|
|
20 |
Y |
36 |
38 |
P |
|
|
|
21 |
Y |
35 |
37 |
P |
|
|
|
22 |
Y |
33 |
37 |
P |
|
|
|
23 |
Y |
36 |
37 |
P |
|
|
|
24 |
Y |
37 |
39 |
P |
|
|
|
25 |
Y |
35 |
36 |
P |
|
|
|
26 |
Y |
21 |
22 |
P |
|
|
|
27 |
Y |
31 |
35 |
P |
|
|
|
28 |
Y |
20 |
24 |
P |
|
|
|
29 |
Y |
32 |
36 |
P |
|
|
|
30 |
Y |
21 |
24 |
P |
|
|
|
31 |
Y |
33 |
36 |
P |
|
|
|
32 |
Y |
20 |
24 |
P |
|
|
|
33 |
Y |
33 |
36 |
P |
|
|
|
34 |
Y |
22 |
24 |
P |
|
|
DB3 |
1 |
Y |
34 |
30 |
P |
|
|
|
2 |
Y |
31 |
27 |
P |
|
|
|
3 |
Y |
37 |
33 |
P |
|
|
|
4 |
Y |
40 |
40 |
P |
|
|
|
5 |
Y |
42 |
40 |
P |
|
|
|
6 |
Y |
45 |
44 |
P |
|
|
|
7 |
Y |
33 |
40 |
P |
|
|
|
8 |
Y |
31 |
41 |
P |
|
|
|
9 |
Y |
26 |
35 |
P |
|
|
|
10 |
Y |
41 |
29 |
P |
|
|
|
11 |
Y |
86 |
44 |
P |
|
|
|
12 |
Y |
45 |
37 |
P |
|
|
|
13 |
Y |
35 |
37 |
P |
|
|
|
14 |
Y |
34 |
33 |
P |
|
|
|
15 |
Y |
40 |
41 |
P |
|
|
|
16 |
Y |
44 |
41 |
P |
|
|
|
17 |
Y |
37 |
35 |
P |
|
|
|
18 |
Y |
32 |
30 |
P |
|
|
|
19 |
Y |
39 |
33 |
P |
|
|
|
20 |
Y |
39 |
34 |
P |
|
|
|
21 |
Y |
124 |
82 |
P |
|
|
|
22 |
Y |
37 |
29 |
P |
|
|
|
23 |
Y |
39 |
29 |
P |
|
|
|
24 |
Y |
29 |
36 |
P |
|
|
|
25 |
Y |
36 |
31 |
P |
|
|
|
26 |
Y |
49 |
29 |
P |
|
|
|
27 |
Y |
45 |
40 |
P |
|
|
|
28 |
Y |
37 |
43 |
P |
|
|
|
29 |
Y |
44 |
41 |
P |
|
|
|
30 |
Y |
78 |
36 |
P |
|
|
|
31 |
Y |
50 |
45 |
P |
|
|
|
32 |
Y |
31 |
30 |
P |
|
|
|
33 |
Y |
31 |
29 |
P |
|
|
|
34 |
Y |
29 |
29 |
P |
|
|
|
35 |
Y |
27 |
26 |
P |
|
|
|
36 |
Y |
84 |
47 |
P |
|
|
|
37 |
Y |
80 |
56 |
P |
|
|
|
38 |
Y |
32 |
30 |
P |
|
|
|
39 |
Y |
33 |
30 |
P |
|
|
|
40 |
Y |
43 |
29 |
P |
|
|
|
41 |
Y |
36 |
33 |
P |
|
|
|
42 |
Y |
33 |
31 |
P |
|
|
|
43 |
Y |
37 |
41 |
P |
|
|
|
44 |
Y |
30 |
29 |
P |
|
|
|
45 |
Y |
34 |
32 |
P |
|
|
|
46 |
Y |
44 |
29 |
P |
|
|
|
50 |
Y |
16 |
16 |
P |
|
|
|
64 |
Y |
23 |
33 |
P |
|
|
DB2 |
1 |
Y |
34 |
33 |
P |
|
|
|
2 |
Y |
39 |
35 |
P |
|
|
|
3 |
Y |
42 |
39 |
P |
|
|
|
4 |
Y |
45 |
41 |
P |
|
|
|
5 |
Y |
45 |
41 |
P |
|
|
|
6 |
Y |
68 |
84 |
P |
|
|
|
7 |
Y |
37 |
33 |
P |
|
|
|
8 |
Y |
39 |
34 |
P |
|
|
|
9 |
Y |
50 |
40 |
P |
|
|
|
10 |
Y |
39 |
34 |
P |
|
|
|
11 |
Y |
40 |
33 |
P |
|
|
|
12 |
Y |
39 |
34 |
P |
|
|
|
13 |
Y |
27 |
22 |
P |
|
|
|
14 |
Y |
28 |
21 |
P |
|
|
|
15 |
Y |
33 |
26 |
P |
|
|
|
16 |
Y |
28 |
29 |
P |
|
|
|
17 |
Y |
37 |
33 |
P |
|
|
|
18 |
Y |
29 |
28 |
P |
|
|
|
19 |
Y |
30 |
22 |
P |
|
|
|
20 |
Y |
194 |
36 |
P |
|
|
|
21 |
Y |
36 |
28 |
P |
|
|
|
22 |
Y |
34 |
45 |
P |
|
|
|
23 |
Y |
36 |
30 |
P |
|
|
|
24 |
Y |
64 |
64 |
P |
|
|
|
25 |
Y |
39 |
33 |
P |
|
|
|
27 |
Y |
44 |
37 |
P |
|
|
|
29 |
Y |
47 |
39 |
P |
|
|
|
31 |
Y |
44 |
38 |
P |
|
|
|
32 |
Y |
42 |
32 |
P |
|
|
|
33 |
Y |
29 |
25 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-1 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
9 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
10 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
18 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
21 |
R |
Y |
N |
Y |
F |
Failed to Illuminate |
Y |
|
DB-1 |
22 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
25 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
26 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
27 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
29 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
30 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
31 |
S |
Y |
N |
Y |
F |
Failed to Illuminate |
Y |
|
DB-1 |
33 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
35 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
5 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
7 |
Y |
Y |
Y |
P |
|
|
|
Db-1 |
14 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
17 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
19 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
24 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
28 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
32 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
34 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
36 |
Y |
Y |
Y |
P |
|
|
|
DB-1 |
37 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Hi-Bay Lights |
Y |
Square Hi-bay Lights |
Y |
Halogen 50W Lights |
Y |
36W Diffused Single Lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
HiBay Light |
Stock Room |
1 |
Failed to illuminate |
Davis |
|
Y |
Scissor required and charged on separate job (53535) |
|
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Power Boards |
TV Area |
Several |
Numerous power boards plugged into other power boards |
N |
TBC |
TBC |
Emailed head office to advise is quote required |
EM21 |
Male Toilets |
1 |
Failed to Illuminate |
Y |
N |
N |
|
EM31 |
BOH |
1 |
Failed to Illuminate |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 09/05/2020 |
---|
| |
---|
| |