StateVIC
Date of Visit11/11/2020
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number51761
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICnorthland

Location NameNorthland
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 01 Y 25 19 P
DB1 02 Y 28 18 P
DB1 03 Y 25 19 P
DB1 04 Y 28 18 P
DB1 05 Y 25 15 P
DB1 06 Y 28 18 P
DB1 07 Y 28 18 P
DB1 08 Y 28 18 P
DB1 09 Y 24 15 P
DB1 10 Y 28 18 P
DB1 11 Y 27 18 P
DB1 12 Y 28 18 P
DB1 13 Y 29 19 P
DB1 14 Y 28 18 P
DB1 15 Y 28 18 P
DB1 16 Y 28 18 P
DB1 17 Y 24 16 P
DB1 18 Y 29 18 P
DB1 19 Y 28 18 P
DB1 20 Y 29 18 P
DB1 21 Y 28 18 P
DB1 22 Y 28 18 P
DB1 23 Y 28 18 P
DB1 24 Y 28 18 P
DB1 25 Y 25 33 P
DB1 26 Y 28 18 P
DB1 27 Y 24 18 P
DB1 28 Y 29 19 P
DB1 29 Y 26 18 P
DB1 30 Y 28 18 P
DB1 31 Y 28 18 P
DB1 32 Y 28 18 P
DB1 33 Y 23 33 P
DB1 34 Y 28 18 P
DB1 35 Y 28 18 P
DB1 37 Y 28 18 P
DB1 38 Y 28 18 P
DB1 39 Y 28 18 P
DB1 40 Y 28 18 P
DB1 41 Y 24 15 P
DB1 42 Y 28 18 P
DB1 43 Y 25 17 P
DB1 45 Y 28 18 P
DB1 47 Y 25 15 P
DB1 49 Y 28 18 P
DB1 50 Y 28 18 P
DB1 51 Y 27 19 P
DB1 52 Y 29 19 P
DB1 53 Y 24 20 P
DB1 54 Y 24 33 P
DB1 55 Y 104 22 P
DB1 57 Y 25 15 P
DB1 59 Y 29 21 P
DB1 61 Y 25 17 P
DB1 63 Y 24 16 P
DB1 65 Y 25 35 P
DB2 01 Y 28 18 P
DB2 02 Y 25 16 P
DB2 03 Y 28 18 P
DB2 04 Y 25 19 P
DB2 05 Y 24 16 P
DB2 06 Y 29 19 P
DB2 07 Y 152 26 P
DB2 08 Y 24 16 P
DB2 09 Y 24 16 P
DB2 10 Y 29 19 P
DB2 11 Y 24 15 P
DB2 12 Y 28 18 P
DB2 13 Y 25 16 P
DB2 14 Y 29 22 P
DB2 15 Y 25 17 P
DB2 16 Y 58 19 P
DB2 17 Y 28 18 P
DB2 18 Y 28 48 P
DB2 19 Y 25 16 P
DB2 20 Y 24 16 P
DB2 21 Y 28 18 P
DB2 22 Y 27 18 P
DB2 23 Y 28 18 P
DB2 24 Y 24 16 P
DB2 25 Y 25 16 P
DB2 26 Y 27 19 P
DB2 27 Y 28 18 P
DB2 28 Y 24 16 P
DB2 29 Y 25 18 P
DB2 30 Y 26 17 P
DB2 31 Y 25 16 P
DB2 32 Y 27 16 P
DB2 33 Y 29 18 P
DB2 34 Y 73 16 P
DB2 35 Y 24 15 P
DB2 36 Y 28 18 P
DB2 37 Y 28 18 P
DB2 38 Y 28 18 P
DB2 39 Y 28 18 P
DB2 40 Y 25 18 P
DB2 41 Y 28 18 P
DB2 42 Y 28 18 P
DB2 43 Y OL 24 F FAILED TEST Y
DB2 45 Y 24 18 P
DB4 01 Y 30 20 P
DB4 03 Y 28 18 P
DB4 05 Y 24 17 P
DB4 07 Y 25 16 P
DB4 09 Y 32 26 P
DB4 11 Y 30 20 P
DB4 13 Y 28 18 P
DB4 15 Y 28 18 P
DB4 17 Y 28 18 P
DB4 19 Y 28 18 P
DB4 21 Y 28 18 P
DB4 23 Y 28 18 P
DB4 24 Y 28 18 P
DB4 25 Y 28 18 P
DB4 26 Y 28 18 P
DB4 27 Y 28 18 P
DB4 28 Y 28 18 P
DB4 29 Y 28 18 P
DB4 30 Y 28 18 P
DB4 31 Y 28 18 P
DB4 32 Y 29 19 P
DB4 34 Y 29 43 P
DB4 36 Y 24 16 P
DB3 01 Y 28 18 P
DB3 02 Y 28 18 P
DB3 03 Y 28 18 P
DB3 04 Y 30 20 P
DB3 05 Y 28 18 P
DB3 06 Y 27 18 P
DB3 07 Y 28 18 P
DB3 08 Y 27 18 P
DB3 09 Y 30 20 P
DB3 10 Y 28 18 P
DB3 11 Y 28 18 P
DB3 15 Y 21 17 P
DB3 15 Y 20 17 P
DB3 15 Y 24 18 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
50 2 R Y Y Y P
4 R Y Y Y P
5 R Y Y Y P
6 R Y Y Y P
7 R Y Y Y P
8 R Y Y Y P
9 R Y Y Y P
11 R Y Y Y P
14 R Y Y Y P
16 R Y Y Y P
17 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
20 R Y Y Y P
21 R Y Y Y P
22 R Y Y Y P
23 R Y Y Y P
24 R Y Y Y P
25 R Y Y Y P
26 R Y Y Y P
27 R Y Y Y P
28 R Y Y Y P
32 R Y Y Y P
33 R Y Y Y P
34 R Y Y Y P
36 R Y Y Y P
38 R Y Y Y P
39 R Y Y Y P
40 R Y Y Y P
42 R Y Y Y P
42 R Y Y Y P
43 R Y Y Y P
44 R Y Y Y P
45 R Y Y Y P
46 R Y Y Y P
47 R Y Y Y P
48 R Y Y Y P
49 R Y Y Y P
51 R Y Y Y P
54 S Y Y Y P
55 S Y Y Y P
58 S Y Y Y P
60 S Y Y Y P
63 S Y Y Y P
64 S Y Y Y P
65 S Y Y Y P
66 S Y Y Y P
67 R Y Y Y P
69 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB2 EX1 Y Y Y P
EX3 Y Y Y P
EX10 Y Y Y P
EX13 Y Y Y P
EX15 Y Y Y P
EX29 Y Y Y P
EX30 Y Y Y P
EX31 Y Y Y P
EX35 Y Y Y P
EX37 Y Y Y P
EX41 Y N Y F FAILED BATTERY TEST Y N
EX50 Y Y Y P
EX52 Y Y Y P
EX53 Y Y Y P
EX56 Y Y Y P
EX59 Y Y Y P
EX61 Y Y Y P
EX62 Y Y Y P
EX68 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED PANEL LIGHT Y
ROUND LED DOWNLIGHT LARGE Y
EXIT LIGHT Y
RECESSED EMERGENCY Y
DUEL LED SURFACE MOUNT EMERGENCY LIGHT Y
DAVIS LED HIGHBAY Y
TRI LED TUBED TROFFERS BOH Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
CB43 DB2 1 FAILED TEST Y N N REPLACED WITH NEW
EXIT LIGHT 41 - STAFF HALLWAY 1 FAILED BATTERY TEST Y N N REPLACED WITH NEW
PANEL LIGHT SEASONAL 1 FAILED TO ILUMINATE Y N N REPLACED WITH NEW 30W LED PANEL LIGHT
PANEL LIGHT FRIDGES 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW 30W LED PANEL LIGHT
PANEL LIGHT VINTEC WINE 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW 30W LED PANEL LIGHT
LED FABRIC RACK SIGN FLOOR CARE 1 FAILED TO ILLUMINATE Y N N FOUND UNPLUGGED. PLUGGED BACK IN.
LED FABRIC RACK SIGN AIR PURIFIERS 1 FAILED TO ILLUMINATE Y N N FOUND UNPLUGGED. PLUGGED BACK IN.
EXTERNAL TGG SIGN WEST WALL FACING OVAL/PARK AREA 1 MANAGER REPORTED ONLY 2 × STRIP OF LEDS WORKING IN SIGN Y N N INVESTIGATED ON SITE. FOUND GPO'S SWITCHED OFF. TURNED BACK ON AND REQUESTED STORE MANAGER ADVISE IF THE LIGHTS WORK AS IT WAS DIFICULT TO SEE THE LIGHTS DURING DAY. ADAM FROM STORE HAS CONFIRMED LIGHTS ARE OPERATING AS INTENDED.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months12/05/2021