Carry out push button test and record the results below.
RCD Details (Biennial)
Distribution Board No.
Circuit No.
Push Button (YorN)
0 Degrees
180 Degrees
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB1
01
Y
25
19
P
DB1
02
Y
28
18
P
DB1
03
Y
25
19
P
DB1
04
Y
28
18
P
DB1
05
Y
25
15
P
DB1
06
Y
28
18
P
DB1
07
Y
28
18
P
DB1
08
Y
28
18
P
DB1
09
Y
24
15
P
DB1
10
Y
28
18
P
DB1
11
Y
27
18
P
DB1
12
Y
28
18
P
DB1
13
Y
29
19
P
DB1
14
Y
28
18
P
DB1
15
Y
28
18
P
DB1
16
Y
28
18
P
DB1
17
Y
24
16
P
DB1
18
Y
29
18
P
DB1
19
Y
28
18
P
DB1
20
Y
29
18
P
DB1
21
Y
28
18
P
DB1
22
Y
28
18
P
DB1
23
Y
28
18
P
DB1
24
Y
28
18
P
DB1
25
Y
25
33
P
DB1
26
Y
28
18
P
DB1
27
Y
24
18
P
DB1
28
Y
29
19
P
DB1
29
Y
26
18
P
DB1
30
Y
28
18
P
DB1
31
Y
28
18
P
DB1
32
Y
28
18
P
DB1
33
Y
23
33
P
DB1
34
Y
28
18
P
DB1
35
Y
28
18
P
DB1
37
Y
28
18
P
DB1
38
Y
28
18
P
DB1
39
Y
28
18
P
DB1
40
Y
28
18
P
DB1
41
Y
24
15
P
DB1
42
Y
28
18
P
DB1
43
Y
25
17
P
DB1
45
Y
28
18
P
DB1
47
Y
25
15
P
DB1
49
Y
28
18
P
DB1
50
Y
28
18
P
DB1
51
Y
27
19
P
DB1
52
Y
29
19
P
DB1
53
Y
24
20
P
DB1
54
Y
24
33
P
DB1
55
Y
104
22
P
DB1
57
Y
25
15
P
DB1
59
Y
29
21
P
DB1
61
Y
25
17
P
DB1
63
Y
24
16
P
DB1
65
Y
25
35
P
DB2
01
Y
28
18
P
DB2
02
Y
25
16
P
DB2
03
Y
28
18
P
DB2
04
Y
25
19
P
DB2
05
Y
24
16
P
DB2
06
Y
29
19
P
DB2
07
Y
152
26
P
DB2
08
Y
24
16
P
DB2
09
Y
24
16
P
DB2
10
Y
29
19
P
DB2
11
Y
24
15
P
DB2
12
Y
28
18
P
DB2
13
Y
25
16
P
DB2
14
Y
29
22
P
DB2
15
Y
25
17
P
DB2
16
Y
58
19
P
DB2
17
Y
28
18
P
DB2
18
Y
28
48
P
DB2
19
Y
25
16
P
DB2
20
Y
24
16
P
DB2
21
Y
28
18
P
DB2
22
Y
27
18
P
DB2
23
Y
28
18
P
DB2
24
Y
24
16
P
DB2
25
Y
25
16
P
DB2
26
Y
27
19
P
DB2
27
Y
28
18
P
DB2
28
Y
24
16
P
DB2
29
Y
25
18
P
DB2
30
Y
26
17
P
DB2
31
Y
25
16
P
DB2
32
Y
27
16
P
DB2
33
Y
29
18
P
DB2
34
Y
73
16
P
DB2
35
Y
24
15
P
DB2
36
Y
28
18
P
DB2
37
Y
28
18
P
DB2
38
Y
28
18
P
DB2
39
Y
28
18
P
DB2
40
Y
25
18
P
DB2
41
Y
28
18
P
DB2
42
Y
28
18
P
DB2
43
Y
OL
24
F
FAILED TEST
Y
DB2
45
Y
24
18
P
DB4
01
Y
30
20
P
DB4
03
Y
28
18
P
DB4
05
Y
24
17
P
DB4
07
Y
25
16
P
DB4
09
Y
32
26
P
DB4
11
Y
30
20
P
DB4
13
Y
28
18
P
DB4
15
Y
28
18
P
DB4
17
Y
28
18
P
DB4
19
Y
28
18
P
DB4
21
Y
28
18
P
DB4
23
Y
28
18
P
DB4
24
Y
28
18
P
DB4
25
Y
28
18
P
DB4
26
Y
28
18
P
DB4
27
Y
28
18
P
DB4
28
Y
28
18
P
DB4
29
Y
28
18
P
DB4
30
Y
28
18
P
DB4
31
Y
28
18
P
DB4
32
Y
29
19
P
DB4
34
Y
29
43
P
DB4
36
Y
24
16
P
DB3
01
Y
28
18
P
DB3
02
Y
28
18
P
DB3
03
Y
28
18
P
DB3
04
Y
30
20
P
DB3
05
Y
28
18
P
DB3
06
Y
27
18
P
DB3
07
Y
28
18
P
DB3
08
Y
27
18
P
DB3
09
Y
30
20
P
DB3
10
Y
28
18
P
DB3
11
Y
28
18
P
DB3
15
Y
21
17
P
DB3
15
Y
20
17
P
DB3
15
Y
24
18
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
50
2
R
Y
Y
Y
P
4
R
Y
Y
Y
P
5
R
Y
Y
Y
P
6
R
Y
Y
Y
P
7
R
Y
Y
Y
P
8
R
Y
Y
Y
P
9
R
Y
Y
Y
P
11
R
Y
Y
Y
P
14
R
Y
Y
Y
P
16
R
Y
Y
Y
P
17
R
Y
Y
Y
P
18
R
Y
Y
Y
P
19
R
Y
Y
Y
P
20
R
Y
Y
Y
P
21
R
Y
Y
Y
P
22
R
Y
Y
Y
P
23
R
Y
Y
Y
P
24
R
Y
Y
Y
P
25
R
Y
Y
Y
P
26
R
Y
Y
Y
P
27
R
Y
Y
Y
P
28
R
Y
Y
Y
P
32
R
Y
Y
Y
P
33
R
Y
Y
Y
P
34
R
Y
Y
Y
P
36
R
Y
Y
Y
P
38
R
Y
Y
Y
P
39
R
Y
Y
Y
P
40
R
Y
Y
Y
P
42
R
Y
Y
Y
P
42
R
Y
Y
Y
P
43
R
Y
Y
Y
P
44
R
Y
Y
Y
P
45
R
Y
Y
Y
P
46
R
Y
Y
Y
P
47
R
Y
Y
Y
P
48
R
Y
Y
Y
P
49
R
Y
Y
Y
P
51
R
Y
Y
Y
P
54
S
Y
Y
Y
P
55
S
Y
Y
Y
P
58
S
Y
Y
Y
P
60
S
Y
Y
Y
P
63
S
Y
Y
Y
P
64
S
Y
Y
Y
P
65
S
Y
Y
Y
P
66
S
Y
Y
Y
P
67
R
Y
Y
Y
P
69
R
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DB2
EX1
Y
Y
Y
P
EX3
Y
Y
Y
P
EX10
Y
Y
Y
P
EX13
Y
Y
Y
P
EX15
Y
Y
Y
P
EX29
Y
Y
Y
P
EX30
Y
Y
Y
P
EX31
Y
Y
Y
P
EX35
Y
Y
Y
P
EX37
Y
Y
Y
P
EX41
Y
N
Y
F
FAILED BATTERY TEST
Y
N
EX50
Y
Y
Y
P
EX52
Y
Y
Y
P
EX53
Y
Y
Y
P
EX56
Y
Y
Y
P
EX59
Y
Y
Y
P
EX61
Y
Y
Y
P
EX62
Y
Y
Y
P
EX68
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
LED PANEL LIGHT
Y
ROUND LED DOWNLIGHT LARGE
Y
EXIT LIGHT
Y
RECESSED EMERGENCY
Y
DUEL LED SURFACE MOUNT EMERGENCY LIGHT
Y
DAVIS LED HIGHBAY
Y
TRI LED TUBED TROFFERS BOH
Y
Are there any Warranty items needing to be repaired?
No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
CB43
DB2
1
FAILED TEST
Y
N
N
REPLACED WITH NEW
EXIT LIGHT
41 - STAFF HALLWAY
1
FAILED BATTERY TEST
Y
N
N
REPLACED WITH NEW
PANEL LIGHT
SEASONAL
1
FAILED TO ILUMINATE
Y
N
N
REPLACED WITH NEW 30W LED PANEL LIGHT
PANEL LIGHT
FRIDGES
1
FAILED TO ILLUMINATE
Y
N
N
REPLACED WITH NEW 30W LED PANEL LIGHT
PANEL LIGHT
VINTEC WINE
1
FAILED TO ILLUMINATE
Y
N
N
REPLACED WITH NEW 30W LED PANEL LIGHT
LED FABRIC RACK SIGN
FLOOR CARE
1
FAILED TO ILLUMINATE
Y
N
N
FOUND UNPLUGGED. PLUGGED BACK IN.
LED FABRIC RACK SIGN
AIR PURIFIERS
1
FAILED TO ILLUMINATE
Y
N
N
FOUND UNPLUGGED. PLUGGED BACK IN.
EXTERNAL TGG SIGN
WEST WALL FACING OVAL/PARK AREA
1
MANAGER REPORTED ONLY 2 × STRIP OF LEDS WORKING IN SIGN
Y
N
N
INVESTIGATED ON SITE. FOUND GPO'S SWITCHED OFF. TURNED BACK ON AND REQUESTED STORE MANAGER ADVISE IF THE LIGHTS WORK AS IT WAS DIFICULT TO SEE THE LIGHTS DURING DAY. ADAM FROM STORE HAS CONFIRMED LIGHTS ARE OPERATING AS INTENDED.
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
12/05/2021
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.