Partner Name | Built Electrical QLD |
---|
State | QLD |
---|
Date of Visit | 23/11/2020 |
---|
Technician's Name | Brodie Robertson |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 51848 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in QLD | tingalpa |
---|
|
|
---|
Location Name | Tingalpa |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Db1-A |
1 |
Y |
24 |
15 |
P |
|
|
|
2 |
Y |
29 |
19 |
P |
|
|
|
5 |
Y |
30 |
23 |
P |
|
|
DB1-B |
1 |
Y |
31 |
21 |
P |
|
|
|
2 |
Y |
23 |
20 |
P |
|
|
|
3 |
Y |
23 |
14 |
p |
|
|
|
4 |
Y |
29 |
19 |
P |
|
|
|
5 |
Y |
29 |
19 |
p |
|
|
|
6 |
Y |
28 |
19 |
P |
|
|
|
7 |
Y |
28 |
19 |
P |
|
|
|
8 |
Y |
24 |
15 |
P |
|
|
|
9 |
Y |
30 |
20 |
P |
|
|
|
10 |
Y |
23 |
15 |
P |
|
|
|
11 |
Y |
29 |
19 |
P |
|
|
|
12 |
Y |
24 |
15 |
P |
|
|
|
13 |
Y |
29 |
13 |
P |
|
|
|
14 |
Y |
23 |
14 |
P |
|
|
|
15 |
Y |
28 |
18 |
P |
|
|
|
16 |
Y |
23 |
14 |
P |
|
|
|
17 |
Y |
28 |
18 |
P |
|
|
|
18 |
Y |
23 |
14 |
P |
|
|
|
19 |
Y |
28 |
18 |
p |
|
|
|
20 |
Y |
28 |
18 |
P |
|
|
|
21 |
Y |
24 |
15 |
P |
|
|
|
22 |
Y |
28 |
18 |
P |
|
|
|
23 |
Y |
23 |
15 |
P |
|
|
|
24 |
Y |
23 |
18 |
P |
|
|
|
25 |
Y |
28 |
18 |
P |
|
|
|
27 |
Y |
23 |
20 |
P |
|
|
|
28 |
Y |
24 |
14 |
P |
|
|
|
29 |
Y |
23 |
15 |
p |
|
|
|
30 |
Y |
28 |
18 |
p |
|
|
|
31 |
Y |
24 |
15 |
p |
|
|
|
32 |
Y |
28 |
18 |
P |
|
|
|
33 |
Y |
23 |
15 |
p |
|
|
|
34 |
Y |
24 |
15 |
p |
|
|
|
35 |
Y |
28 |
18 |
P |
|
|
|
36 |
Y |
24 |
18 |
P |
|
|
|
37 |
Y |
28 |
18 |
P |
|
|
|
38 |
Y |
23 |
15 |
P |
|
|
|
39 |
Y |
28 |
18 |
P |
|
|
|
40 |
Y |
24 |
18 |
P |
|
|
|
41 |
Y |
21 |
18 |
P |
|
|
|
42 |
Y |
24 |
13 |
p |
|
|
|
43 |
Y |
24 |
15 |
P |
|
|
|
44 |
Y |
28 |
18 |
P |
|
|
|
45 |
Y |
23 |
14 |
P |
|
|
|
46 |
Y |
24 |
15 |
P |
|
|
|
47 |
Y |
28 |
18 |
P |
|
|
|
48 |
Y |
24 |
15 |
P |
|
|
|
49 |
Y |
23 |
15 |
P |
|
|
|
50 |
Y |
24 |
16 |
p |
|
|
|
51 |
Y |
24 |
15 |
P |
|
|
|
52 |
Y |
24 |
15 |
P |
|
|
|
53 |
Y |
24 |
15 |
P |
|
|
|
54 |
Y |
28 |
18 |
P |
|
|
|
55 |
Y |
28 |
18 |
P |
|
|
|
56 |
Y |
23 |
14 |
P |
|
|
|
57 |
Y |
23 |
15 |
P |
|
|
|
58 |
Y |
23 |
1 |
P |
|
|
|
59 |
Y |
24 |
18 |
P |
|
|
|
60 |
Y |
28 |
18 |
P |
|
|
|
61 |
Y |
28 |
18 |
P |
|
|
|
63 |
Y |
24 |
15 |
P |
|
|
|
65 |
Y |
23 |
14 |
P |
|
|
|
67 |
Y |
23 |
15 |
P |
|
|
|
69 |
Y |
23 |
14 |
P |
|
|
|
71 |
Y |
23 |
14 |
P |
|
|
Db-2 |
1 |
Y |
9 |
19 |
P |
|
|
|
2 |
Y |
6 |
14 |
P |
|
|
|
3 |
Y |
9 |
18 |
p |
|
|
|
4 |
Y |
9 |
1r |
P |
|
|
|
5 |
Y |
6 |
18 |
P |
|
|
|
6 |
Y |
8 |
23 |
P |
|
|
|
7 |
Y |
8 |
18 |
P |
|
|
|
8 |
Y |
9 |
16 |
p |
|
|
|
9 |
Y |
14 |
19 |
P |
|
|
|
10 |
Y |
15 |
19 |
P |
|
|
|
11 |
Y |
8 |
18 |
P |
|
|
|
12 |
Y |
6 |
13 |
P |
|
|
|
13 |
Y |
8 |
18 |
P |
|
|
|
14 |
y |
6 |
13 |
P |
|
|
|
15 |
y |
7 |
15 |
P |
|
|
|
16 |
Y |
8 |
18 |
P |
|
|
|
17 |
Y |
5 |
13 |
P |
|
|
|
18 |
Y |
7 |
18 |
p |
|
|
|
19 |
Y |
5 |
13 |
P |
|
|
|
20 |
Y |
8 |
18 |
P |
|
|
|
21 |
Y |
6 |
13 |
P |
|
|
|
22 |
Y |
8 |
18 |
P |
|
|
|
23 |
Y |
8 |
18 |
p |
|
|
|
24 |
Y |
7 |
17 |
P |
|
|
|
25 |
Y |
25 |
18 |
P |
|
|
|
26 |
Y |
8 |
18 |
P |
|
|
|
27 |
Y |
8 |
18 |
P |
|
|
|
28 |
Y |
8 |
18 |
P |
|
|
|
29 |
Y |
8 |
18 |
P |
|
|
|
30 |
Y |
9 |
19 |
P |
|
|
|
31 |
Y |
8 |
18 |
P |
|
|
|
32 |
Y |
7 |
17 |
P |
|
|
|
33 |
Y |
8 |
18 |
P |
|
|
|
34 |
Y |
8 |
18 |
P |
|
|
|
35 |
Y |
8 |
18 |
P |
|
|
|
48 |
Y |
8 |
18 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
EM 1 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 2 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 3 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 4 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 5 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 6 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 7 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 8 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 9 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 10 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 11 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 12 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 13 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 14 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 15 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 16 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 17 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 18 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 19 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 20 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 21 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 22 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 23 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 24 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 25 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 26 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 27 |
|
S |
Y |
Y |
Y |
P |
|
|
|
EM 28 |
|
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
EX 1 |
|
Y |
Y |
Y |
P |
|
|
|
EX 2 |
|
Y |
Y |
Y |
P |
|
|
|
EX 3 |
|
Y |
Y |
Y |
P |
|
|
|
EX 4 |
|
Y |
Y |
Y |
P |
|
|
|
EX 5 |
|
Y |
Y |
Y |
P |
|
|
|
EX 6 |
|
Y |
Y |
Y |
P |
|
|
|
EX 7 |
|
Y |
Y |
Y |
P |
|
|
|
EX 8 |
|
Y |
Y |
Y |
P |
|
|
|
EX 9 |
|
Y |
Y |
Y |
P |
|
|
|
EX 10 |
|
Y |
Y |
Y |
P |
|
|
|
EX 11 |
|
Y |
Y |
Y |
P |
|
|
|
EX 12 |
|
Y |
Y |
Y |
P |
|
|
|
EX 13 |
|
Y |
Y |
Y |
P |
|
|
|
EX 14 |
|
Y |
Y |
Y |
P |
|
|
|
EX 15 |
|
Y |
Y |
Y |
P |
|
|
|
EX 16 |
|
Y |
Y |
Y |
P |
|
|
|
EX 17 |
|
Y |
Y |
Y |
P |
|
|
|
EX 18 |
|
Y |
Y |
Y |
P |
|
|
|
EX 19 |
|
Y |
Y |
Y |
P |
|
|
|
EX 20 |
|
Y |
Y |
Y |
P |
|
|
|
EX 21 |
|
Y |
Y |
Y |
P |
|
|
|
EX 22 |
|
Y |
Y |
Y |
P |
|
|
|
EX 23 |
|
Y |
Y |
Y |
P |
|
|
|
EX 24 |
|
Y |
Y |
Y |
P |
|
|
|
EX 25 |
|
Y |
Y |
Y |
P |
|
|
|
EX 26 |
|
Y |
Y |
Y |
P |
|
|
|
EX 27 |
|
Y |
Y |
Y |
P |
|
|
|
EX 28 |
|
Y |
Y |
Y |
P |
|
|
|
EX 29 |
|
Y |
Y |
Y |
P |
|
|
|
EX 30 |
|
Y |
Y |
Y |
P |
|
|
|
EX 31 |
|
Y |
Y |
Y |
P |
|
|
|
EX 32 |
|
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED UFO High bays |
Y |
LED Panel troffer |
Y |
LED Pelmet boxes |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
LED Pelmet Light Box |
Perimeter |
2 |
Unplugged |
Y |
N |
N |
Repaired on site |
LED Pelmet Light Box |
Perimeter (COOLING) |
1 |
Faulty LED strip |
N |
N |
N |
Back LED strip working. Front LED is faulty . Requires replacement fitting from Manufacturer |
Down Light |
Toilet |
1 |
Not illumianted |
Y |
N |
N |
Replaced with 2x 4pin 18w Philips lamp |
36W Lamp |
Kitchen Display |
1 |
Not illuminated |
Y |
N |
N |
Replaced on site |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 23/05/2021 |
---|
| |
---|
| |