Partner Name | Built Electrical Australia |
---|
State | VIC |
---|
Date of Visit | 23/11/2020 |
---|
Technician's Name | Nathan McBain |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 51768 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | cranbourne |
---|
|
|
---|
Location Name | CRANBOURNE |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
15 |
Y |
29 |
20 |
P |
|
|
DB1 |
16 |
Y |
50 |
368 |
F |
FAILED RCD TEST |
Y |
DB1 |
17 |
Y |
31 |
31 |
P |
|
|
DB1 |
18 |
Y |
37 |
37 |
P |
|
|
DB1 |
19 |
Y |
40 |
240 |
P |
|
|
DB1 |
20 |
Y |
62 |
72 |
P |
|
|
DB1 |
21 |
Y |
42 |
83 |
P |
|
|
DB1 |
22 |
Y |
22 |
32 |
P |
|
|
DB1 |
23 |
Y |
39 |
31 |
P |
|
|
DB1 |
24 |
Y |
31 |
41 |
P |
|
|
DB1 |
25 |
Y |
54 |
48 |
P |
|
|
DB1 |
26 |
Y |
34 |
22 |
P |
|
|
DB1 |
27 |
Y |
56 |
53 |
P |
|
|
DB1 |
28 |
Y |
59 |
37 |
P |
|
|
DB1 |
29 |
Y |
29 |
57 |
P |
|
|
DB1 |
30 |
Y |
37 |
91 |
P |
|
|
DB1 |
31 |
Y |
30 |
29 |
P |
|
|
DB1 |
32 |
Y |
39 |
59 |
P |
|
|
DB1 |
34 |
Y |
51 |
75 |
P |
|
|
DB1 |
36 |
Y |
177 |
104 |
P |
|
|
DB1 |
44 |
Y |
89 |
37 |
P |
|
|
DB1 |
46 |
Y |
37 |
48 |
P |
|
|
DB1 |
48 |
Y |
49 |
38 |
P |
|
|
DB1-1 |
01 |
Y |
38 |
40 |
P |
|
|
DB1-1 |
02 |
Y |
43 |
44 |
P |
|
|
DB1-1 |
03 |
Y |
38 |
45 |
P |
|
|
DB1-1 |
04 |
Y |
41 |
42 |
P |
|
|
DB1-1 |
05 |
Y |
49 |
73 |
P |
|
|
DB1-1 |
06 |
Y |
46 |
47 |
P |
|
|
DB1-1 |
07 |
Y |
43 |
44 |
P |
|
|
DB1-1 |
08 |
Y |
30 |
30 |
P |
|
|
DB1-1 |
09 |
Y |
44 |
40 |
P |
|
|
MSB-24 |
13 |
Y |
28 |
38 |
P |
|
|
MSB-24 |
16 |
Y |
28 |
19 |
P |
|
|
MSB-24 |
19 |
Y |
32 |
29 |
P |
|
|
MSB-24 |
20 |
Y |
51 |
41 |
P |
|
|
MSB-24 |
21 |
Y |
38 |
42 |
P |
|
|
MSB-24 |
22 |
Y |
43 |
44 |
P |
|
|
MSB-24 |
23 |
Y |
31 |
30 |
P |
|
|
MSB-24 |
24 |
Y |
40 |
43 |
P |
|
|
MSB-24 |
25 |
Y |
37 |
37 |
P |
|
|
MSB-24 |
26 |
Y |
41 |
42 |
P |
|
|
MSB-24 |
27 |
Y |
46 |
39 |
P |
|
|
MSB-24 |
28 |
Y |
37 |
37 |
P |
|
|
MSB-24 |
29 |
Y |
49 |
46 |
P |
|
|
MSB-24 |
30 |
Y |
36 |
36 |
P |
|
|
MSB-24 |
31 |
Y |
36 |
36 |
P |
|
|
MSB-24 |
32 |
Y |
43 |
206 |
P |
|
|
MSB-24 |
33 |
Y |
55 |
62 |
P |
|
|
MSB-24 |
34 |
Y |
42 |
266 |
P |
|
|
MSB-24 |
35 |
Y |
29 |
38 |
P |
|
|
MSB-24 |
36 |
Y |
29 |
33 |
P |
|
|
MSB-24 |
44 |
Y |
38 |
39 |
P |
|
|
MSB-24 |
46 |
Y |
105 |
32 |
P |
|
|
MSB-24 |
48 |
Y |
37 |
37 |
P |
|
|
MSB-24 |
49 |
Y |
107 |
31 |
P |
|
|
MSB-24 |
51 |
Y |
41 |
42 |
P |
|
|
MSB-24 |
52 |
Y |
37 |
36 |
P |
|
|
MSB-24 |
53 |
Y |
42 |
43 |
P |
|
|
MSB-24 |
54 |
Y |
53 |
50 |
P |
|
|
MSB-24 |
55 |
Y |
236 |
98 |
P |
|
|
MSB-24 |
56 |
Y |
35 |
34 |
P |
|
|
MSB-24 |
57 |
Y |
41 |
42 |
P |
|
|
MSB-24 |
58 |
Y |
29 |
30 |
P |
|
|
MSB-24 |
59 |
Y |
31 |
21 |
P |
|
|
MSB-24 |
60 |
Y |
46 |
54 |
P |
|
|
MSB-24 |
61 |
Y |
48 |
38 |
P |
|
|
MSB-24 |
63 |
Y |
26 |
36 |
P |
|
|
MSB-24 |
65 |
Y |
23 |
37 |
P |
|
|
MSB-24 |
67 |
Y |
22 |
19 |
P |
|
|
MSB-24 |
69 |
Y |
25 |
28 |
P |
|
|
MSB-24 |
71 |
Y |
28 |
19 |
P |
|
|
MSB-24 |
73 |
Y |
28 |
20 |
P |
|
|
MSB-24 |
74 |
Y |
29 |
48 |
P |
|
|
MSB-24 |
75 |
Y |
23 |
18 |
P |
|
|
MSB-24 |
76 |
Y |
28 |
38 |
P |
|
|
MSB-24 |
77 |
Y |
28 |
38 |
P |
|
|
MSB-24 |
78 |
Y |
28 |
38 |
P |
|
|
MSB-24 |
79 |
Y |
28 |
38 |
P |
|
|
MSB-24 |
80 |
Y |
29 |
39 |
P |
|
|
TDB1 |
09 |
Y |
10 |
18 |
P |
|
|
TDB1 |
15 |
Y |
35 |
19 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MSB-24 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DB1 |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
TDB.1 |
16 |
R |
Y |
N |
Y |
F |
FAILED BATTERY TEST |
Y |
N |
|
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MSB-24 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
8 |
Y |
Y |
Y |
P |
|
|
|
MSB-24 |
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
TDB.1 |
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | No |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
400W HIGHBAY MERCURY VAPOUR FITTING |
Y |
4FT 36W FLUORESCENT FITTINGS |
Y |
36W FLUORESCENT SINGLE BATTEN EMERGENCY FITTING |
Y |
36W FLUORESCENT DOUBLE BATTEN EMERGENCY FITTING |
Y |
70MM DOWNLIGHTS |
Y |
36W FLUORESCENT SINGLE BATTEN FITTING |
Y |
200W HIGHBAY MERCURY VAPOUR FITTING |
Y |
SINGLE BATTEN 36W FLUORESCENT DIFFUSER |
Y |
RECESSED EMERGENCY LIGHT FITTING |
Y |
90MM LED DOWNLIGHT |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
CB16 |
DB1 BOH |
1 |
FAILED RCD TEST |
Y |
N |
N |
REPLACED WITH SCHNEIDER 20A RCBO |
CB44 |
DB1 BOH |
1 |
TRIPPING |
N |
TBC |
TBC |
TRIPPING DUE TO FAULTY TV BLUE LIGHTS. PLEASE ADVISE IF QUOTE IS REQUIRED. |
DB LEG3NDS |
DB1/DB1-1/MSB-24 |
3 |
NO LEGENDS |
Y |
N |
N |
PRINTED AND INSTALLED ON RETURN VISIT |
EM16 |
STAIRWELL |
1 |
FAILED BATTERY TEST |
Y |
N |
N |
REPLACED WITH NEW |
LED DIFFUSED SINGLE BATTEN |
FRONT ENTRANCE EXTERNAL |
2 |
FAILED TO ILLUMINATE |
Y |
N |
N |
REPLACED WITH NEW 35W FITTING |
FLASHING LAMPS |
FRONT ENTRANCE EXTERNAL |
11 |
FAILED TO ILLUMIMATE |
Y |
N |
N |
REPLACED WITH NEW |
LED FLOOD LIGHT |
EXTERNAL SIDE CAR PARK |
1 |
FAILED TO ILLUMINATE |
Y |
N |
N |
REPLACED WITH NEW - SCISSOR REQUIRED |
LED DIFFUSER |
UPSTAIRES OFFICE |
1 |
DIFFUSER HANGING |
Y |
N |
N |
REFIT FITTING |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 23/05/2021 |
---|
| |
---|
| |