Partner NameBuilt Electrical Australia
StateVIC
Date of Visit24/11/2020
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number51769
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICgeelong

Location Namegeelong
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 01 Y 28 18 P
DB1 03 Y 28 18 P
DB1 05 Y 28 18 P
DB1 07 Y 24 16 P
DB1 09 y 24 14 P
DB1 11 Y 27 17 P
DB1 13 Y 25 16 P
DB1 15 Y 24 16 P
DB1 17 Y 28 18 P
DB1 19 Y 24 15 P
DB1 21 Y 25 16 P
DB1 23 Y 24 16 P
DB1 25 Y 27 37 P
DB1 27 Y 24 34 P
DB1 36 Y 25 17 P
DB1 37 Y 28 48 P
DB-1B 01 Y 28 18 P
DB-1B 02 Y 28 18 P
DB-1B 03 Y 28 18 P
DB-1B 04 Y 24 16 P
DB-1B 05 Y 28 18 P
DB-1B 06 Y 28 18 P
DB-1B 07 Y 26 17 P
DB-1B 08 Y 24 15 P
DB-1B 09 Y 26 17 P
DB-1B 10 Y 25 17 P
DB-1B 11 Y 29 19 P
DB-1B 12 Y 28 18 P
DB-1B 13 Y 28 18 P
DB-1B 14 Y 28 18 P
DB-1B 15 Y 26 17 P
DB-1B 16 Y 24 15 P
DB-1B 17 Y 25 16 P
DB-1B 18 Y 24 15 P
DB-1B 19 Y 28 18 P
DB-1B 20 Y 28 18 P
DB-1B 21 Y 28 18 P
DB-1B 22 Y 28 18 P
DB-1B 23 Y 28 18 P
DB-1B 24 Y 23 15 P
DB-1B 25 Y 28 18 P
DB-1B 26 Y 31 22 P
DB-1B 27 Y 25 19 P
DB-1B 29 Y 28 18 P
DB-1B 31 Y 23 15 P
DB-1B 33 Y 28 18 P
DB-1B 35 Y 24 16 P
DB3 01 Y 13 25 P
DB3 03 Y 16 23 P
DB3 05 Y 14 23 P
DB3 14 Y 28 18 P
DB3 23 Y 28 18 P
DB3 24 Y 29 19 P
DB3 25 Y 28 18 P
DB3 26 Y 28 18 P
DB3 27 Y 214 29 P
DB3 28 Y 28 17 P
DB3 29 Y 28 18 P
DB3 30 Y 26 19 P
DB3 31 Y 28 18 P
DB3 32 Y 28 18 P
DB3 33 Y 28 18 P
DB3 34 Y 28 18 P
DB3 35 Y 24 15 P
DB3 37 Y 28 18 P
DB2 03 Y 25 16 P
DB2 05 Y 25 20 P
DB2 07 Y 25 65 P
DB2 09 Y 24 16 P
DB2 11 Y 25 16 P
DB2 13 Y 29 20 P
DB2 15 Y 26 17 P
DB2 17 Y 25 17 P
DB2 19 Y 27 17 P
DB2 21 Y 27 19 p
DB2 23 Y 24 16 P
DB2 25 Y 25 16 P
DB2 27 Y 25 16 P
DB2 29 Y 34 23 P
DB2 31 Y 28 18 P
DB2 32 Y 28 21 P
DB2 33 Y 25 17 P
DB2 34 Y 24 16 P
DB2 35 Y 26 16 P
DB2 36 Y 26 19 P
DB2 37 Y 25 16 P
DB2 39 Y 28 18 P
DB2 41 Y 26 18 P
DB2 43 Y 28 20 P
DB2 45 Y 27 21 P
DB2 47 Y 26 17 P
DB2 49 Y 25 16 P
DB2 51 Y 28 18 P
DB2 53 Y 28 18 P
DB2 55 Y 28 18 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 S Y Y Y P
DB-1 2 R Y Y Y P
DB-1 3 S Y Y Y P
DB-1 4 S Y Y Y P
DB-1 5 S Y Y Y P
DB-1 6 S Y Y Y P
DB-1 7 S Y Y Y P
DB-1 8 S Y Y Y P
DB-1 9 S Y Y Y P
DB-1 10 S Y N Y F FAILED BATTERY TEST Y N
DB-1 19 R Y Y Y P
DB-1 11 S Y Y Y P
DB-1 12 S Y Y Y P
DB-1 13 S Y Y Y P
DB-1 14 S Y Y Y P
DB-1 15 S Y Y Y P
DB-1 16 S Y Y Y P
DB-1 17 S Y N Y F FAILED BATTERY TEST Y N
DB-1 18 S Y Y Y P
DB-1 19 S Y Y Y P
DB-1 20 S Y Y Y P
DB-1 21 S Y Y Y P
DB-1 22 R Y Y Y P
DB-1 23 R Y Y Y P
DB-1 24 S Y Y Y P
DB-1 25 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 Y Y Y P
DB-1 2 Y Y Y P
DB-1 3 Y Y Y P
DB-1 4 Y Y Y P
DB-1 5 Y Y Y P
DB-1 6 Y Y Y P
DB-1 7 Y Y Y P
DB-1 8 Y Y Y P
DB-1 9 Y Y Y P
DB-1 10 Y Y Y P
DB-1 11 Y Y Y P
DB-1 12 Y Y Y P
DB-1 13 Y Y Y P
DB-1 14 Y Y Y P
DB-1 15 Y Y Y P
DB-1 16 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
HI-BAY LIGHTS Y
36W TWIN BATTEN LIGHTS Y
50W HALOGEN DOWNLIGHTS Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
DAVIS UFO LED HIGHBAY FRIDGES 1 FAILED TO ILLUMINATE DAVIS N RETURN VISIT REQUIRED - SCISSOR LIFT REQUIRED. SCISSOR TO BE INVOICED SEPARATELY.
Geotag photo(s)
  • Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
CB36 DB3 1 WRONG ORIENTATION OF CB Y N N REPLACED WITH 16A RCBO
DB LEGEND DB3 1 NO LEGEND N N N TO BE INSTALLED AT NEXT EPM
DB LEGEND DB1 SEC B 1 EGEND INSTALLED NOT STURDIE FORMAT N N N TO BE EDITED AND INSTALLED AT NEXT EPM
DB LEGEND DB2 1 LEGEND INSTALLED NOT STURDIE FORMAT N N N TO BE EDITED AND INSTALLED AT NEXT EPM
EM09 MICROWAVES 1 FAILED BATTERY TEST Y N N REPLACED WITH NEW - SCISSOR REQUIRED
EM17 MEZZ FLOOR 1 FAILED BATTERY TEST Y N N REPLACED WITH NEW - SCISSOR REQUIRED
FLASHING LAMP FRONT ENTRANCE 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW
RECESSED ROUND FITTING FRONT AIRLOCK 2 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW LAMPS
RACK LED FABRIC SIGNS BRACKETS/FRIDGES/COOLING/HEATING 4 FAILED TO ILLUMINATE Y N N FOUND UNPLUGGED. REPLUGGED AND NO FURTHER ACTION REQUIRED
RECESSED ROUND PLC LAMP FITTING CLEANERS ROOM 1 FAILED TO ILLUMINATE Y N N REPLACED WITH LED DOWNLIGHT WITH CONVERSION PLATE
TEST AND TAG STORE 80+ TEST AND TAG IN DATE, NEXT TEST DUE 12 FEB 21 N N N FYI
NEW DROPPER REQUIRED FOOD PROCESSER 1 DROPPER, USED WITH EXTENSION LEAD, FED FROM SOCKET 5M AWAY N N N FYI
Site Status SelectorStore now fully compliant
Next Test Due in 6 months24/05/2021