StateVIC
Date of Visit25/11/2020
Technician's NameAnthony Zammit
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number51771
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICthomastown

Location NameThomastown
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db2 1 Y 25 16 P
Db2 3 Y 24 15 P
Db2 5 Y 28 18 P
Db2 7 Y 24 22 P
Db2 15 Y 24 20 P
Db2 17 Y 25 15 P
Db2 19 Y 27 18 P
Db2 21 Y 25 15 P
Db2 23 Y 25 15 P
Db2 25 Y 28 18 P
Db2 27 Y 28 18 P
Db2 29 Y 28 18 P
Db2 31 Y 24 15 P
Db2 35 Y 24 14 P
Db2 37 Y 90 17 P
Db2 39 Y 24 15 P
Db2 41 Y 26 17 P
Db2 43 Y 25 16 P
Db2 45 Y 24 16 P
Db2 46 Y 29 19 P
Db2 47 Y 26 16 P
Db2 48 Y 25 16 P
Db2 49 Y 24 18 P
Db2 50 Y 26 17 P
Db2 51 Y 24 15 P
Db2 52 Y 28 18 P
Db2 53 Y 28 18 P
Db2 54 Y 25 17 P
Db2 56 Y 24 16 P
Db2 58 Y 28 18 P
db1 DB1 1 Y 23 13 P
DB1 3 Y 21 12 P
DB1 5 Y 20 10 P
DB1 17 Y 28 18 P
DB1 19 Y 25 16 P
DB1 21 Y 28 18 P
DB1 23 Y 26 17 P
DB1 25 Y 28 18 P
DB1 27 Y 28 18 P
DB1 33 Y 28 18 P
DB1 35 Y 26 17 P
DB1 37 Y 28 18 P
DB1 39 Y 23 14 P
DB1 41 Y 29 19 P
DB1 43 Y 28 15 P
DB1 50 Y 9 19 P
DB1 51 Y 24 32 P
DB1 52 Y 11 21 P
DB1 53 Y 29 18 P
DB1 54 Y 12 22 P
DB1 55 Y 28 18 P
DB1 57 Y 28 18 P
DB1 61 Y 24 16 P
DB1 63 Y 25 15 P
DB1 65 Y 37 22 P
DB1 67 Y 10 20 P
DB1 68 Y 29 19 P
DB1 69 Y 23 30 P
DB1 70 Y 28 18 P
DB1 72 Y 25 16 P
DB1 74 Y 27 18 P
DB1 75 Y 29 18 P
DB1 77 Y 24 18 P
DB1 79 Y 30 16 P
DB1 81 Y 24 19 P
DB1 84 Y 24 19 P
DB1 86 Y 29 17 P
DB1 88 Y 25 17 P
DB1 90 Y 28 18 P
DB1 92 Y 28 18 P
DB3 1 Y 24 15 P
DB3 3 Y 34 37 P
DB3 4 Y 28 18 P
DB3 5 Y 31 17 P
DB3 6 Y 28 20 P
DB3 7 Y 25 16 P
DB3 8 Y 28 17 P
DB3 9 Y 24 18 P
DB3 10 Y 25 17 P
DB3 11 Y 28 16 P
DB3 12 Y 25 16 P
DB3 13 Y 24 15 P
DB3 14 Y 28 18 P
DB3 15 Y 23 15 P
DB3 16 Y 29 19 P
DB3 17 Y 28 18 P
DB3 18 Y 28 18 P
DB3 19 Y 25 16 P
DB3 20 Y 27 37 P
DB3 22 Y 25 16 P
DB3 27 Y 30 20 P
DB3 29 Y 60 58 P
DB3 31 Y 28 18 P
DB3 33 Y 24 17 P
DB3 34 Y 30 22 P
DB3 35 Y 27 19 P
DB3 36 Y 24 16 P
DB3 37 Y 26 18 P
DB3 38 Y 28 18 P
DB3 39 Y 25 21 P
DB3 40 Y 27 19 P
DB3 41 Y 28 18 P
DB3 42 Y 25 19 P
DB3 43 Y 28 18 P
DB3 44 Y 28 18 P
DB3 45 Y 28 18 P
DB3 46 Y 28 18 P
DB3 47 Y 28 18 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-2 2 R Y N Y F Failed 90 Min Test Y N
DB-2 4 S Y Y Y P
DB-2 5 S Y Y Y P
DB-2 6 S Y Y Y P
DB-2 7 S Y Y Y P
DB-2 10 S Y Y Y P
DB-2 11 S Y Y Y P
DB-2 12 S Y Y Y P
DB-2 13 S Y Y Y P
DB-2 15 S Y Y Y P
DB-2 18 S Y Y Y P
DB-2 20 S Y Y Y P
DB-2 21 S Y Y Y P
DB-2 22 S Y Y Y P
DB-2 23 S Y Y Y P
DB-2 25 R Y Y Y P
DB-2 28 R Y Y Y P
DB-2 30 R Y Y Y P
DB-2 31 R Y Y Y P
DB-2 33 R Y Y Y P
DB-2 34 R Y Y Y P
DB-2 35 R Y Y Y P
DB-2 36 R Y Y Y P
DB-2 37 R Y Y Y P
DB-2 39 R Y Y Y P
DB-2 40 R Y Y Y P
DB-2 42 R Y Y Y P
DB-2 43 R Y Y Y P
DB-2 44 R Y Y Y P
Unknown 45 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-2 1 Y Y Y P
DB-2 3 Y Y Y P
DB-2 8 Y Y Y P
DB-2 9 Y Y Y P
DB-2 14 Y Y Y P
DB-2 16 Y Y Y P
DB-2 17 Y Y Y P
DB-2 19 Y Y Y P
DB-2 24 Y Y Y P
DB-2 26 Y Y Y P
DB-2 27 Y Y Y P
DB-2 29 Y Y Y P
DB-2 32 Y N Y F Failed 90 Test Y N
DB-2 38 Y Y Y P
DB-2 41 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi-bay LED Lights Y
LED Downlights Y
4ft LED Lights Y
Rectangular LED Shopfitting Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
LED Hi-bay Above Software Gaming 1 Failed to Illuminate Davis N To be completed on warranty job
LED Hi-bay Above Fisher & Paykel Ovens 1 Failed to Illuminate Davis N To be compelted on warranty job
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
70mm LED Downlight TV Zone 6 Failed to Illuminate Y N N Fixed issue with C-Bus
Exit Light 32 - Upstairs Hallway 1 Failed 90 Min Test Y N N Replaced
Recessed Emergency Light 02 - Air Lock 1 Failed 90 Min Test Y N N Replaced
Site Status SelectorStore now fully compliant