StateVIC
Date of Visit01/12/2020
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number51775
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICdandenong

Location NameDandenong
HTML Block
Test PeriodBiennial Test (once every two years)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Biennial)
Distribution Board No. Circuit No. Push Button (YorN) 0 Degrees 180 Degrees Pass / Fail (PorF) Fault? Repaired on Site (YorN)
FITOUT DB 01 Y 28 18 P
FITOUT DB 02 Y 28 19 P
FITOUT DB 03 Y 28 18 P
FITOUT DB 04 Y 28 18 P
FITOUT DB 05 Y 28 19 P
FITOUT DB 06 Y 28 18 P
FITOUT DB 07 Y 28 18 P
FITOUT DB 08 Y 28 18 P
FITOUT DB 09 Y 28 18 P
FITOUT DB 10 Y 28 18 P
FITOUT DB 11 Y 28 19 P
FITOUT DB 12 Y 26 19 P
FITOUT DB 13 Y 28 18 P
FITOUT DB 14 Y 28 18 P
FITOUT DB 15 Y 26 20 P
FITOUT DB 16 Y 28 18 P
FITOUT DB 17 Y 28 19 P
FITOUT DB 18 Y 28 22 P
FITOUT DB 19 Y 29 19 P
FITOUT DB 20 Y 28 18 P
LEONARDS 49 Y 28 18 P
LEONARDS 50 Y 29 19 P
LEONARDS 51 Y 28 18 P
LEONARDS 52 Y 29 19 P
LEONARDS 53 Y 28 18 P
LEONARDS 54 Y 29 19 P
LEONARDS 55 Y 28 18 P
LEONARDS 56 Y 29 19 P
LEONARDS 57 Y 28 18 P
LEONARDS 58 Y 29 19 P
LEONARDS 59 Y 28 18 P
LEONARDS 60 Y 29 19 P
LEONARDS 61 Y 95 23 P
LEONARDS 62 Y 29 19 P
LEONARDS 63 Y 28 18 P
LEONARDS 64 Y 29 19 P
LEONARDS 65 Y 24 16 P
LEONARDS 66 Y 29 19 P
LEONARDS 67 Y 31 24 P
LEONARDS 68 Y 29 19 P
LEONARDS 69 Y 25 18 P
LEONARDS 70 Y 29 19 P
LEONARDS 71 Y 210 26 P
LEONARDS 72 Y 28 18 P
LEONARDS 73 Y 24 16 P
LEONARDS 74 Y 28 19 P
LEONARDS 75 Y 24 19 P
LEONARDS 76 Y 29 19 P
LEONARDS 77 Y 129 29 P
LEONARDS 78 Y 28 18 P
LEONARDS 79 Y 28 18 P
LEONARDS 80 Y 28 18 P
LEONARDS 81 Y 28 17 P
LEONARDS 82 Y 28 18 P
LEONARDS 83 Y 24 16 P
LEONARDS 84 Y 28 18 P
LEONARDS 85 Y 29 19 P
LEONARDS 86 Y 28 18 P
LEONARDS 87 Y 24 16 P
LEONARDS 88 Y 28 18 P
LEONARDS 89 Y 24 16 P
LEONARDS 90 Y 28 18 P
LEONARDS 91 Y 25 17 P
LEONARDS 92 Y 25 30 P
LEONARDS 93 Y 29 19 P
LEONARDS 95 Y 30 19 P
LEONARDS 97 Y 28 18 P
LEONARDS 99 Y 28 18 P
LEONARDS 106 Y 30 20 P
LEONARDS 108 Y 29 20 P
DB1 1 Y 28 18 P
DB1 3 Y 28 39 P
DB1 4 Y 26 18 P
DB1 5 Y 28 18 P
DB1 6 Y 28 18 P
DB1 7 Y 28 18 P
DB1 8 Y 28 18 P
DB1 9 Y 29 22 P
DB1 10 Y 25 16 P
DB1 11 Y 27 17 P
DB1 12 Y 28 19 P
DB1 13 Y 23 23 P
DB1 14 Y 28 18 P
DB1 15 Y 36 39 P
DB1 16 Y 28 18 P
DB1 17 Y 39 33 P
DB1 18 Y 28 19 P
DB1 19 Y 26 18 P
DB1 20 Y 28 18 P
DB1 21 Y 25 19 P
DB1 22 Y 24 17 P
DB1 23 Y 28 18 P
DB1 24 Y 24 15 P
DB1 25 Y 25 17 P
DB1 26 Y 29 19 P
DB1 27 Y 28 18 P
DB1 28 Y 25 17 P
DB1 29 Y 24 18 P
DB1 30 Y 29 18 P
DB1 31 Y 24 16 P
DB1 32 Y 27 19 P
DB1 33 Y 25 18 P
DB1 34 Y 46 19 P
DB1 35 Y 25 18 P
DB1 36 Y 24 15 P
DB1 37 Y 24 19 P
DB1 39 Y 25 17 P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 S Y Y Y P
14 S Y Y Y P
15 S Y Y Y P
16 S Y Y Y P
17 S Y Y Y P
18 S Y Y Y P
19 S Y Y Y P
20 S Y Y Y P
21 S Y Y Y P
22 S Y Y Y P
23 S Y Y Y P
24 S Y Y Y P
26 S Y Y Y P
27 S Y Y Y P
28 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
25 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
HI-BAY LIGHTS Y
LED DOWNLIGHT Y
T5 TWIN BATTEN LIGHTS Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
DAVIS BLACK HIGHBAY LED COFFEE ACCESSORIES/TV BRACKETS/BOH AISLE(3)/BOH/TECH PHONES 7 FAILED TO ILLUMINATE DAVIS N To be completed on warranty job
Geotag photo(s)
  • Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
EXTERNAL FRONT FLOODLIGHTS FRONT - GLOBES REPLACEMENT REQUIRED N TBC TEC QUOTE 2050 PREVIOUSLY SUBMITTED. RE-QUOTING REQUIRED IF APPROVAL GRANTED.
EXTERNAL FRONT SIGN FRONT 1 TRIPPING CIRCUIT, ISOLATED AT ISOLATOR ON PREVIOUS AUDIT N TBA TBA QUOTE 190522 PREVIOUSLY SUBMITTED. RE-QUOTING REQUIRED IF APPROVAL GRANTED.
TEST AND TAG STORE 80+ TEST AND TAG EXPIRED 12/FEB/2020 N N N FYI
LED LARGE RECESSED DOWNLIGHT FRONT AIRLOCK 1 FAILED TO ILLUMINATE Y N N FOUND LOOSE CONNECTION , RETERMINATED ELV SIDE OF TRANSFORMER.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months01/06/2021