State | NSW |
---|
Date of Visit | 19/10/2020 |
---|
Technician's Name | Josh Bennison |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 50959 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | port_macquarie |
---|
|
|
---|
Location Name | Port Macquarie |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 01 |
6 |
Y |
26.9 |
37.9 |
P |
|
|
|
7 |
Y |
28.9 |
28.9 |
P |
|
|
|
26 |
Y |
39.8 |
38.8 |
P |
|
|
|
39 |
Y |
38.9 |
38.9 |
P |
|
|
|
40 |
Y |
41.9 |
41.9 |
P |
|
|
|
41 |
Y |
40.9 |
40.9 |
P |
|
|
|
42 |
Y |
41.9 |
41.9 |
P |
|
|
|
43 |
Y |
40..9 |
40.9 |
P |
|
|
|
44 |
Y |
40.9 |
41.9 |
P |
|
|
|
45 |
Y |
51.9 |
44.9 |
P |
|
|
|
46 |
Y |
43.9 |
43.9 |
P |
|
|
|
47 |
Y |
79.9 |
83.9 |
P |
|
|
|
48 |
Y |
38.9 |
38.9 |
P |
|
|
|
49 |
Y |
38.9 |
43.9 |
P |
|
|
|
50 |
Y |
40.9 |
51.9 |
P |
|
|
|
51 |
Y |
85.9 |
82.9 |
P |
|
|
|
52 |
Y |
84.9 |
84.9 |
P |
|
|
|
53 |
Y |
13.9 |
23.9 |
P |
|
|
|
54 |
Y |
14.9 |
25.9 |
P |
|
|
DB 02 |
1 |
Y |
16.9 |
25.9 |
P |
|
|
|
2 |
Y |
13.9 |
23.9 |
P |
|
|
|
3 |
Y |
10.9 |
20.9 |
P |
|
|
|
4 |
Y |
10.9 |
20.9 |
P |
|
|
|
5 |
Y |
10.9 |
20.9 |
P |
|
|
|
6 |
Y |
7.9 |
18.9 |
P |
|
|
|
7 |
Y |
7.9 |
16.9 |
P |
|
|
|
8 |
Y |
7.9 |
17.9 |
P |
|
|
|
9 |
Y |
6.9 |
17.9 |
P |
|
|
|
10 |
Y |
11.9 |
20.9 |
P |
|
|
|
11 |
Y |
10.9 |
20.9 |
P |
|
|
|
12 |
Y |
11.9 |
21.9 |
P |
|
|
|
13 |
Y |
10.9 |
17.9 |
P |
|
|
|
14 |
Y |
11.9 |
17.9 |
P |
|
|
|
15 |
Y |
10.9 |
17.9 |
P |
|
|
|
16 |
Y |
7.9 |
17.9 |
P |
|
|
|
17 |
Y |
6.9 |
14.9 |
P |
|
|
|
18 |
Y |
11.9 |
18.9 |
P |
|
|
|
19 |
Y |
11.9 |
20.9 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB01 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB01 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
200W Square Fluoro |
Y |
200W High Bay Fluoro |
Y |
36W Single Fluoro with LED Tubes |
Y |
2x36W Fluoro Fittings with LED Tubes |
Y |
2x28W Fluoro Fitting |
Y |
18W Fluoro Fitting |
Y |
30W Fluoro Fitting |
Y |
36W Emergency Maintained Fluoro |
Y |
LED Exit Light |
Y |
Twin Halogen Spot Emergency Floodlight |
Y |
LED Spitfire |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
LED lamp |
Upstairs Office |
2 |
Faulty |
Y |
N |
N |
Replaced lamps |
LED lamp |
Lunch Room |
1 |
Faulty |
Y |
N |
N |
Replaced lamps |
Escutcheon panell |
Upstairs Sub Board |
1 |
Not earthed correctly |
Y |
N |
N |
Added equipotential bond |
Sub Board |
Upstairs |
1 |
Excessive metal swarf |
Y |
N |
N |
Vacuumed and removed all debris |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 19/04/2021 |
---|
| |
---|
| |