StateNSW
Date of Visit10/02/2021
Technician's NameMitchell Cutts
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number54273
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWkotara

Location NameKotara
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
T12D 1 Y P
T12D 2 Y P
T12D 3 Y P
T12D 4 Y P
T12D 5 Y P
T12D 6 Y P
T12D 7 Y P
T12D 8 Y P
T12D 9 Y P
T12D 10 Y P
T12D 11 Y P
T12D 12 Y P
T12D 14 Y P
T12D 15 Y P
T12D 16 Y P
T12D 17 Y P
T12D 19 Y P
T12E 1 Y P
T12E 3 Y P
T12E 5 Y P
T12E 7 Y P
T12E 9 Y P
T12E 11 Y P
T12E 15 Y P
T12E 16 Y P
T12E 17 Y P
T12E 19 Y P
T12E 21 Y P
T12E 38 Y P
T12C 1 Y P
T12C 2 Y P
T12C 3 Y P
T12C 4 Y P
T12C 5 Y P
T12C 6 Y P
T12C 7 Y P
T12C 8 Y P
T12C 9 Y P
T12C 10 Y P
T12C 11 Y P
T12C 12 Y P
T12C 13 Y P
T12C 14 Y P
T12C 15 Y P
T12C 16 Y P
T12C 17 Y P
T12C 18 Y P
T12C 19 Y P
T12C 20 Y P
T12C 21 Y P
T12C 22 Y P
T12C 23 Y P
T12C 24 Y P
T12C 25 Y P
T12C 26 Y P
T12C 27 Y P
T12C 28 Y P
T12C 29 Y P
T12C 30 Y P
T12C 31 Y P
T12C 32 Y P
T12C 33 Y P
T12C 34 Y P
T12C 35 Y P
T12C 52 Y P
T12C 53 Y P
T12C 55 Y P
T12C 59 Y P
T12C 60 Y P
T12B 1 Y P
T12B 2 Y P
T12B 4 Y P
T12B 5 Y P
T12B 6 Y P
T12B 7 Y P
T12B 8 Y P
T12B 9 Y P
T12B 10 Y P
T12B 11 Y P
T12B 12 Y P
T12B 13 Y P
T12B 14 Y P
T12B 15 Y P
T12B 16 Y P
T12B 17 Y P
T12B 18 Y P
T12B 19 Y P
T12B 20 Y P
T12B 21 Y P
T12B 22 Y P
T12B 23 Y P
T12B 24 Y P
T12B 25 Y P
T12B 26 Y P
T12B 27 Y P
T12B 28 Y P
T12B 29 Y P
T12B 30 Y P
T12B 31 Y P
T12B 32 Y P
T12B 33 Y P
T12B 34 Y P
T12B 35 Y P
T12B 36 Y P
T12B 37 Y P
T12B 38 Y P
T12B 40 Y P
T12B 42 Y P
T12B 44 Y P
T12B 45 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
T12C 1 S Y Y Y P
T12C 2 S Y Y Y P
T12C 6 R Y N Y F Battery failed 90 minute test Y N
T12C 7 R Y N Y F Battery failed 90 minute test Y N
T12C 8 R Y N Y F Battery failed 90 minute test Y N
T12C 11 S Y Y Y P
T12C 12 R Y N Y F Battery failed 90 minute test Y N
T12C 13 S Y Y Y P
T12C 14 S Y Y Y P
T12C 15 S Y Y Y P
T12C 17 S Y Y Y P
T12C 18 S Y Y Y P
T12C 20 S Y Y Y P
T12C 23 R Y Y Y P
T12C 24 R Y Y Y P
T12C 25 R Y Y Y P
T12C 26 R Y Y Y P
T12C 28 R Y Y Y P
T12C 29 R Y Y Y P
T12C 30 S Y Y Y P
T12C 31 R Y Y Y P
T12C 33 S Y Y Y P
T12C 35 R Y Y Y P
T12C 40 S Y Y Y P
T12C 41 S Y Y Y P
T12C 42 S Y Y Y P
T12C 43 S Y Y Y P
T12C 44 S Y Y Y P
T12C 45 S Y Y Y P
T12C 46 S Y Y Y P
T12C 47 S Y Y Y P
T12C 51 S Y Y Y P
T12C 52 S Y Y Y P
T12C 54 R Y Y Y P
T12C 55 R Y Y Y P
T12C 57 R Y Y Y P
T12C 58 R Y Y Y P
T12C 59 R Y Y Y P
T12C 60 R Y Y Y P
T12C 61 R Y Y Y P
T12C 62 R Y Y Y P
T12C 63 R Y Y Y P
T12C 64 R Y Y Y P
T12C 65 R Y Y Y P
T12C 67 R Y Y Y P
T12C 69 S Y N Y F Battery failed 90 minute test Y N
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
T12C 3 Y Y Y P
T12C 4 Y Y Y P
T12C 5 Y Y Y P
T12C 8 Y Y Y P
T12C 9 Y Y Y P
T12C 10 Y N Y F Battery failed 90 minute test Y N
T12C 16 Y Y Y P
T12C 19 Y Y Y P
T12C 21 Y Y Y P
T12C 22 Y Y Y P
T12C 27 Y Y Y P
T12C 32 Y Y Y P
T12C 34 Y Y Y P
T12C 36 Y Y Y P
T12C 37 Y Y Y P
T12C 38 Y Y Y P
T12C 39 Y Y Y P
T12C 48 Y Y Y P
T12C 49 Y Y Y P
T12C 50 Y Y Y P
T12C 53 Y Y Y P
T12C 56 Y Y Y P
T12C 66 Y Y Y P
T12C 68 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Ci-C Fluoro Y
2x36W Diffused Y
400W Flood Light Y
70mm Downlight Y
1x18 T5 Diffused Y
2x18W T5 Caged Fluoro Y
2x18W Waterproof T5 Y
140mm Downlight Y
18W Compact Fluoro Y
Twin Par 38 Sensor Y
250W Square Diffused Y
36W Lamps Y
Square Recessed Fluoro Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Exit light #10 Entering staff area 1 Battery failed 90 minute test Y N N Replaced exit light
Emergency lights #6, #7, #8 & #12 Shop floor 4 Battery failed 90 minute test Y N N Replaced emergency lights
Emergency batten #69 Front of store 1 Battery failed 90 minute test Y N N Replaced with emergency dual light
Lamps Shop floor 13 Not illuminated Y N N Replaced lamps
Site Status SelectorStore now fully compliant
Next Test Due in 6 months10/08/2021