Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 16/02/2021 |
---|
Technician's Name | Bayley Woodroffe |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 54719 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | belmont |
---|
|
|
---|
Location Name | Belmont |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB lighting |
1 |
Y |
P |
|
|
DB lighting |
2 |
Y |
P |
|
|
DB lighting |
4 |
Y |
P |
|
|
DB lighting |
5 |
Y |
P |
|
|
DB lighting |
6 |
Y |
P |
|
|
DB lighting |
7 |
Y |
P |
|
|
DB lighting |
8 |
Y |
P |
|
|
DB lighting |
9 |
Y |
P |
|
|
DB lighting |
10 |
Y |
P |
|
|
DB lighting |
11 |
Y |
P |
|
|
DB lighting |
12 |
Y |
P |
|
|
DB lighting |
16 |
Y |
P |
|
|
DB lighting |
17 |
Y |
P |
|
|
DB lighting |
18 |
Y |
P |
|
|
DB lighting |
18 |
Y |
P |
|
|
DB lighting |
19 |
Y |
P |
|
|
DB lighting |
20 |
Y |
P |
|
|
DB lighting |
21 |
Y |
P |
|
|
DB lighting |
22 |
Y |
P |
|
|
DB lighting |
23 |
Y |
P |
|
|
DB lighting |
24 |
Y |
P |
|
|
DB Power A |
25 |
Y |
P |
|
|
DB Power A |
26 |
Y |
P |
|
|
DB Power A |
27 |
Y |
P |
|
|
DB Power A |
28 |
Y |
P |
|
|
DB Power A |
29 |
Y |
P |
|
|
DB Power A |
34 |
Y |
P |
|
|
DB Power A |
35 |
Y |
P |
|
|
DB Power A |
36 |
Y |
P |
|
|
DB Power A |
37 |
Y |
P |
|
|
DB Power A |
38 |
Y |
P |
|
|
DB Power A |
39 |
Y |
P |
|
|
DB Power A |
40 |
Y |
P |
|
|
DB Power A |
41 |
Y |
P |
|
|
DB Power A |
43 |
Y |
P |
|
|
DB Power A |
44 |
Y |
P |
|
|
DB Power A |
45 |
Y |
P |
|
|
DB Power A |
46 |
Y |
P |
|
|
DB Power A |
47 |
Y |
P |
|
|
DB Power A |
48 |
Y |
P |
|
|
DB Power A |
49 |
Y |
P |
|
|
DB Power A |
52 |
Y |
P |
|
|
DB Power A |
53 |
Y |
P |
|
|
DB Power A |
54 |
Y |
P |
|
|
DB Power A |
55 |
Y |
P |
|
|
DB Power A |
56 |
Y |
P |
|
|
DB Power A |
57 |
Y |
P |
|
|
DB Power B |
61 |
Y |
P |
|
|
DB Power B |
62 |
Y |
P |
|
|
DB Power B |
63 |
Y |
P |
|
|
DB Power B |
64 |
Y |
P |
|
|
DB Power B |
65 |
Y |
P |
|
|
DB Power B |
66 |
Y |
P |
|
|
DB Power B |
67 |
Y |
P |
|
|
DB Power B |
68 |
Y |
P |
|
|
DB Power B |
69 |
Y |
P |
|
|
DB Power B |
70 |
Y |
P |
|
|
DB Power B |
71 |
Y |
P |
|
|
DB Power B |
72 |
Y |
P |
|
|
DB Power B |
73 |
Y |
P |
|
|
DB Power B |
74 |
Y |
P |
|
|
DB Power B |
75 |
Y |
P |
|
|
DB Power B |
82 |
Y |
P |
|
|
DB Power B |
83 |
Y |
P |
|
|
DB Power B |
84 |
Y |
P |
|
|
DB Power B |
85 |
Y |
P |
|
|
DB Power B |
86 |
Y |
P |
|
|
DB Power B |
87 |
Y |
P |
|
|
DB Power B |
88 |
Y |
P |
|
|
DB Power B |
89 |
Y |
P |
|
|
DB Power B |
90 |
Y |
P |
|
|
DB Power B |
91 |
Y |
P |
|
|
DB Power B |
92 |
Y |
P |
|
|
DB Power B |
94 |
Y |
P |
|
|
DB Power B |
95 |
Y |
P |
|
|
DB Power B |
97 |
Y |
P |
|
|
DB Power B |
98 |
Y |
P |
|
|
DB Power B |
99 |
Y |
P |
|
|
DB Power B |
100 |
Y |
P |
|
|
DB Power B |
101 |
Y |
P |
|
|
DB Power B |
102 |
Y |
P |
|
|
DB Power B |
103 |
Y |
P |
|
|
DB Power B |
104 |
Y |
P |
|
|
DB Power B |
105 |
Y |
P |
|
|
DB Power B |
106 |
Y |
P |
|
|
DB Power B |
107 |
Y |
P |
|
|
DB Power B |
108 |
Y |
P |
|
|
DB Power B |
109 |
Y |
P |
|
|
DB Power B |
110 |
Y |
P |
|
|
DB Power B |
111 |
Y |
P |
|
|
DB Power B |
112 |
Y |
P |
|
|
DB Power B |
113 |
Y |
P |
|
|
DB Power B |
114 |
Y |
P |
|
|
DB Power B |
115 |
Y |
P |
|
|
DB Power B |
116 |
Y |
P |
|
|
DB Power B |
117 |
Y |
P |
|
|
DB Power B |
118 |
Y |
P |
|
|
DB Power B |
119 |
Y |
P |
|
|
DB Power B |
120 |
Y |
P |
|
|
DB Power B |
121 |
Y |
P |
|
|
DB Power B |
122 |
Y |
P |
|
|
DB Power B |
123 |
Y |
P |
|
|
DB Power B |
124 |
Y |
P |
|
|
DB Power B |
125 |
Y |
P |
|
|
DB Power B |
126 |
Y |
P |
|
|
DB Power B |
127 |
Y |
P |
|
|
DB Power B |
128 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB |
EM 01 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 02 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 03 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 06 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 08 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 31 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 33 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 35 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 36 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 37 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 39 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 40 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 41 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 42 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 43 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM 44 |
S |
Y |
Y |
N |
F |
Charge light not coming on when power re-instated |
Y |
|
|
EM 45 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB |
EM 04 |
Y |
Y |
Y |
P |
|
|
|
|
EM 05 |
Y |
Y |
Y |
P |
|
|
|
|
EM 07 |
Y |
Y |
Y |
P |
|
|
|
|
EM 09 |
Y |
Y |
Y |
P |
|
|
|
|
EM 10 |
Y |
Y |
Y |
P |
|
|
|
|
EM 11 |
Y |
Y |
Y |
P |
|
|
|
|
EM 12 |
Y |
Y |
Y |
P |
|
|
|
|
EM 13 |
Y |
Y |
Y |
P |
|
|
|
|
EM 19 |
Y |
Y |
Y |
P |
|
|
|
|
EM 20 |
Y |
Y |
Y |
P |
|
|
|
|
EM 21 |
Y |
Y |
Y |
P |
|
|
|
|
EM 23 |
Y |
Y |
Y |
P |
|
|
|
|
EM 26 |
Y |
Y |
Y |
P |
|
|
|
|
EM 27 |
Y |
Y |
Y |
P |
|
|
|
|
EM 29 |
Y |
Y |
Y |
P |
|
|
|
|
EM 30 |
Y |
Y |
Y |
P |
|
|
|
|
EM 32 |
Y |
Y |
Y |
P |
|
|
|
|
EM 34 |
Y |
Y |
Y |
P |
|
|
|
|
EM 38 |
Y |
Y |
Y |
P |
|
|
|
|
EM 46 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED UFO Hi bay |
Y |
LED batten light |
Y |
LED downlights |
Y |
LED spot lights - track lighting |
Y |
LED strip light - track lighting |
Y |
LED spot light - trunking lighting |
Y |
LED srip light - trunking lighting |
Y |
Exits |
Y |
Emergency spit fires |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Emergency #44 |
BOH (last row) |
1 |
Charge light was not coming on once power was re-instated |
Y |
N |
N |
Returned with Scissor Lift. Found that terminals were loose |
No Sturdie Maintenance folder |
Office |
1 |
No Maintenance Folder |
N |
N |
N |
Maintenance Folder posted to Store |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 16/08/2021 |
---|
| |
---|
| |