Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 17/02/2021 |
---|
Technician's Name | Bayley Woodroffe |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 54724 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | joondalup |
---|
|
|
---|
Location Name | Joondalup |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 01 |
1R |
Y |
P |
|
|
DB 01 |
1W |
Y |
P |
|
|
DB 01 |
1B |
Y |
P |
|
|
DB 01 |
3R |
Y |
P |
|
|
DB 01 |
3W |
Y |
P |
|
|
DB 01 |
3B |
Y |
P |
|
|
DB 01 |
5R |
Y |
P |
|
|
DB 01 |
5W |
Y |
P |
|
|
DB 01 |
5B |
Y |
P |
|
|
DB 01 |
7R |
Y |
P |
|
|
DB 01 |
7W |
Y |
P |
|
|
DB 01 |
7B |
Y |
P |
|
|
DB 01 |
9R |
Y |
P |
|
|
DB 01 |
9W |
Y |
P |
|
|
DB 01 |
9B |
Y |
P |
|
|
DB 01 |
11R |
Y |
P |
|
|
DB 01 |
11W |
Y |
P |
|
|
DB 01 |
11B |
Y |
P |
|
|
DB 01 |
13R |
Y |
P |
|
|
DB 01 |
13W |
Y |
P |
|
|
DB 01 |
13B |
Y |
P |
|
|
DB 01 |
15R |
Y |
P |
|
|
DB 01 |
15W |
Y |
P |
|
|
DB 01 |
15B |
Y |
P |
|
|
DB 01 |
17R |
Y |
P |
|
|
DB 01 |
17W |
Y |
P |
|
|
DB 01 |
17B |
Y |
P |
|
|
DB 01 |
19R |
Y |
P |
|
|
DB 01 |
21R |
Y |
P |
|
|
DB 01 |
21W |
Y |
P |
|
|
DB 01 |
21B |
Y |
P |
|
|
DB 01 |
23W |
Y |
P |
|
|
DB 01 |
23B |
N |
F |
Faulty RCD |
Y |
DB 01 |
2R |
Y |
P |
|
|
DB 01 |
2W |
Y |
P |
|
|
DB 01 |
2B |
Y |
P |
|
|
DB 01 |
4R |
Y |
P |
|
|
DB 01 |
4W |
Y |
P |
|
|
DB 01 |
4B |
Y |
P |
|
|
DB 01 |
6R |
Y |
P |
|
|
DB 01 |
6W |
Y |
P |
|
|
DB 01 |
6B |
Y |
P |
|
|
DB 01 |
8R |
Y |
P |
|
|
DB 01 |
8W |
Y |
P |
|
|
DB 01 |
8B |
Y |
P |
|
|
DB 01 |
10R |
Y |
P |
|
|
DB 01 |
10W |
Y |
P |
|
|
DB 01 |
10B |
Y |
P |
|
|
DB 01 |
12R |
Y |
P |
|
|
DB 01 |
12W |
Y |
P |
|
|
DB 01 |
12B |
Y |
P |
|
|
DB 01 |
14R |
Y |
P |
|
|
DB 01 |
14W |
Y |
P |
|
|
DB 01 |
14B |
Y |
P |
|
|
DB 01 |
16R |
Y |
P |
|
|
DB 01 |
16W |
Y |
P |
|
|
DB 01 |
16B |
Y |
P |
|
|
DB 01 |
18R |
Y |
P |
|
|
DB 01 |
18W |
Y |
P |
|
|
DB 01 |
18B |
Y |
P |
|
|
DB 01 |
20R |
Y |
P |
|
|
DB 01 |
20W |
Y |
P |
|
|
DB 01 |
20B |
Y |
P |
|
|
DB 01 |
22R |
N |
F |
Faulty RCD |
Y |
DB 01 |
22W |
Y |
P |
|
|
DB 01 |
22B |
Y |
P |
|
|
DB 01 |
24R |
Y |
P |
|
|
DB 01 |
24W |
Y |
P |
|
|
DB 01 |
24B |
Y |
P |
|
|
Mechanical |
11 |
Y |
P |
|
|
Mechanical |
37 |
Y |
P |
|
|
Mechanical |
39 |
Y |
P |
|
|
Mechanical |
41 |
Y |
P |
|
|
Sub board |
1W |
Y |
P |
|
|
Sub board |
1B |
Y |
P |
|
|
Sub board |
3R |
Y |
P |
|
|
Sub board |
3W |
Y |
P |
|
|
Sub board |
3B |
Y |
P |
|
|
Sub board |
5R |
Y |
P |
|
|
Sub board |
5W |
Y |
P |
|
|
Sub board |
5B |
Y |
P |
|
|
Sub board |
7R |
Y |
P |
|
|
Sub board |
7B |
Y |
P |
|
|
Sub board |
9R |
Y |
P |
|
|
Sub board |
2W |
Y |
P |
|
|
Sub board |
2B |
Y |
P |
|
|
Sub board |
4R |
Y |
P |
|
|
Sub board |
4W |
Y |
P |
|
|
Sub board |
4B |
Y |
P |
|
|
Sub board |
6R |
Y |
P |
|
|
Sub board |
6W |
Y |
P |
|
|
Sub board |
6B |
Y |
P |
|
|
Sub board |
8R |
Y |
P |
|
|
Sub board |
8W |
Y |
P |
|
|
Sub board |
8B |
Y |
P |
|
|
Sub board |
10R |
Y |
P |
|
|
Sub board |
10W |
Y |
P |
|
|
Sub board |
10B |
Y |
P |
|
|
Sub board |
12R |
Y |
P |
|
|
Sub board |
12W |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
22 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
27 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Sub board 1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
10 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
21 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
24 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
25 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
30 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
31 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
32 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
33 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
34 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
35 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
36 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
37 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
38 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
39 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
40 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
41 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Jumbo exit |
Y |
LED Hi bay |
Y |
Exit |
Y |
Surface mount spitfire Em |
Y |
Recessed spitfire Em |
Y |
LED battens |
Y |
LED down light |
Y |
LED rectangular shop light |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
RCD #23B & 22R |
DB 01 BOH |
2 |
Faulty RCD |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 17/08/2021 |
---|
| |
---|
| |