Partner Name | Sturdie Trade Services |
---|
State | SA |
---|
Date of Visit | 14/03/2021 |
---|
Technician's Name | Matt Rodda |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 54852 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in SA | marion |
---|
|
|
---|
Location Name | Marion |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB.T2-3 |
R9 |
Y |
P |
|
|
|
W9 |
Y |
P |
|
|
|
B9 |
Y |
P |
|
|
|
R11 |
Y |
P |
|
|
|
W11 |
Y |
P |
|
|
|
B11 |
Y |
P |
|
|
|
R13 |
Y |
P |
|
|
|
W17 |
Y |
P |
|
|
|
B17 |
Y |
P |
|
|
|
R19 |
Y |
P |
|
|
DB.T3-2 |
R8 |
Y |
P |
|
|
|
W8 |
Y |
P |
|
|
|
B8 |
Y |
P |
|
|
|
R10 |
Y |
P |
|
|
|
W10 |
Y |
P |
|
|
|
B10 |
Y |
P |
|
|
|
R11 |
Y |
P |
|
|
|
W11 |
Y |
P |
|
|
|
B11 |
Y |
P |
|
|
|
R12 |
Y |
P |
|
|
|
W12 |
Y |
P |
|
|
|
B12 |
Y |
P |
|
|
|
R14 |
Y |
P |
|
|
|
W14 |
Y |
P |
|
|
|
B14 |
Y |
P |
|
|
|
R16 |
Y |
P |
|
|
|
W16 |
Y |
P |
|
|
|
B16 |
Y |
P |
|
|
|
R18 |
Y |
P |
|
|
|
W18 |
Y |
P |
|
|
DB.T2-2 |
W1 |
Y |
P |
|
|
|
B1 |
Y |
P |
|
|
|
R3 |
Y |
P |
|
|
|
R21 |
Y |
P |
|
|
|
W21 |
Y |
P |
|
|
|
B21 |
Y |
P |
|
|
|
R22 |
Y |
P |
|
|
|
W22 |
Y |
P |
|
|
|
B22 |
Y |
P |
|
|
|
R23 |
Y |
P |
|
|
|
W23 |
Y |
P |
|
|
|
B23 |
Y |
P |
|
|
|
R24 |
Y |
P |
|
|
|
W24 |
Y |
P |
|
|
|
B24 |
Y |
P |
|
|
|
R25 |
Y |
P |
|
|
|
W25 |
Y |
P |
|
|
|
B25 |
Y |
P |
|
|
|
R26 |
Y |
P |
|
|
|
W26 |
Y |
P |
|
|
|
B26 |
Y |
P |
|
|
|
R27 |
Y |
P |
|
|
|
R28 |
Y |
P |
|
|
|
W28 |
Y |
P |
|
|
|
B28 |
Y |
P |
|
|
|
R30 |
Y |
P |
|
|
|
W30 |
Y |
P |
|
|
|
B30 |
Y |
P |
|
|
|
R32 |
Y |
P |
|
|
MDB.T2 |
R5 |
Y |
P |
|
|
|
W5 |
Y |
P |
|
|
|
B5 |
Y |
P |
|
|
|
W6 |
Y |
P |
|
|
|
B6 |
Y |
P |
|
|
|
R7 |
Y |
P |
|
|
|
W7 |
Y |
P |
|
|
|
R8 |
Y |
P |
|
|
|
R19 |
Y |
P |
|
|
|
W19 |
Y |
P |
|
|
|
B19 |
Y |
P |
|
|
|
W20 |
Y |
P |
|
|
|
R21 |
Y |
P |
|
|
|
W21 |
Y |
P |
|
|
|
W23 |
Y |
P |
|
|
|
B23 |
Y |
P |
|
|
|
R25 |
Y |
P |
|
|
|
W25 |
Y |
P |
|
|
|
B25 |
Y |
P |
|
|
|
R27 |
Y |
P |
|
|
|
W27 |
Y |
P |
|
|
MDB.T3 |
W5 |
Y |
P |
|
|
|
B5 |
Y |
P |
|
|
|
R6 |
Y |
P |
|
|
|
B7 |
Y |
P |
|
|
|
W7 |
Y |
P |
|
|
|
B7 |
Y |
P |
|
|
|
W19 |
Y |
P |
|
|
|
B19 |
Y |
P |
|
|
|
R20 |
Y |
P |
|
|
|
W20 |
Y |
P |
|
|
|
B20 |
Y |
P |
|
|
|
R21 |
Y |
P |
|
|
|
W21 |
Y |
P |
|
|
|
B21 |
Y |
P |
|
|
|
R22 |
Y |
P |
|
|
|
W22 |
Y |
P |
|
|
|
B22 |
Y |
P |
|
|
|
R23 |
Y |
P |
|
|
|
W23 |
Y |
P |
|
|
|
B23 |
Y |
P |
|
|
|
R25 |
Y |
P |
|
|
|
R26 |
Y |
P |
|
|
|
W26 |
Y |
P |
|
|
|
B26 |
Y |
P |
|
|
|
R28 |
Y |
P |
|
|
|
W28 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
N |
Y |
F |
Failed 90 Minute test |
Y |
N |
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
18 |
R |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
28w fluoro troffers |
Y |
Highbay lights |
Y |
10w Downlights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Emergency Light #10 |
Southern side of store 3rd from front |
1 |
36w tube flashing |
Y |
N |
N |
Replaced with Surface Mounted emergency light |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 15/09/2021 |
---|
| |
---|
| |