State | ACT |
---|
Date of Visit | 25/03/2021 |
---|
Technician's Name | Will Andrews |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 54294 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in ACT | belconnen |
---|
|
|
---|
Location Name | Belconnen |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Db1 |
1 |
Y |
P |
|
|
Db1 |
2 |
Y |
P |
|
|
Db1 |
3 |
Y |
P |
|
|
Db1 |
4 |
Y |
P |
|
|
Db1 |
5 |
Y |
P |
|
|
Db1 |
6 |
Y |
P |
|
|
Db1 |
7 |
Y |
P |
|
|
Db1 |
8 |
Y |
P |
|
|
Db1 |
9 |
Y |
P |
|
|
Db1 |
10 |
Y |
P |
|
|
Db1 |
11 |
Y |
P |
|
|
Db1 |
12 |
Y |
P |
|
|
Db1 |
13 |
Y |
P |
|
|
Db1 |
14 |
Y |
P |
|
|
Db1 |
15 |
Y |
P |
|
|
Db1 |
16 |
Y |
P |
|
|
Db1 |
17 |
Y |
P |
|
|
Db1 |
18 |
Y |
P |
|
|
Db1 |
19 |
Y |
P |
|
|
Db1 |
21 |
Y |
P |
|
|
Db1 |
22 |
Y |
P |
|
|
Db1 |
23 |
Y |
P |
|
|
Db1 |
25 |
Y |
P |
|
|
Db1 |
26 |
Y |
P |
|
|
Db1 |
27 |
Y |
P |
|
|
Db1 |
28 |
Y |
P |
|
|
Db1 |
29 |
Y |
P |
|
|
Db1 |
30 |
Y |
P |
|
|
Db1 |
31 |
Y |
P |
|
|
Db1 |
32 |
Y |
P |
|
|
Db1 |
33 |
Y |
P |
|
|
Db1 |
34 |
Y |
P |
|
|
Db1 |
35 |
Y |
P |
|
|
Db1 |
36 |
Y |
P |
|
|
Db1 |
42 |
Y |
P |
|
|
Db1 |
43 |
Y |
P |
|
|
Db1 |
44 |
Y |
P |
|
|
Db1 |
45 |
Y |
P |
|
|
Db1 |
46 |
Y |
P |
|
|
Db1 |
47 |
Y |
P |
|
|
|
|
|
|
|
|
Db2 |
4 |
Y |
P |
|
|
Db2 |
5 |
Y |
P |
|
|
Db2 |
6 |
Y |
P |
|
|
Db2 |
7 |
Y |
P |
|
|
Db2 |
8 |
Y |
P |
|
|
Db2 |
9 |
Y |
P |
|
|
Db2 |
10 |
Y |
P |
|
|
Db2 |
11 |
Y |
P |
|
|
Db2 |
12 |
Y |
P |
|
|
Db2 |
13 |
Y |
P |
|
|
Db2 |
14 |
Y |
P |
|
|
Db2 |
15 |
Y |
P |
|
|
Db2 |
16 |
Y |
P |
|
|
Db2 |
17 |
Y |
P |
|
|
Db2 |
18 |
Y |
P |
|
|
Db2 |
19 |
Y |
P |
|
|
Db2 |
20 |
Y |
P |
|
|
Db2 |
21 |
Y |
P |
|
|
Db2 |
23 |
Y |
P |
|
|
Db2 |
24 |
Y |
P |
|
|
Db3 |
1 |
Y |
P |
|
|
Db3 |
2 |
Y |
P |
|
|
Db3 |
4 |
Y |
P |
|
|
Db3 |
6 |
Y |
P |
|
|
Db3 |
7 |
Y |
P |
|
|
Db3 |
8 |
Y |
P |
|
|
Db3 |
9 |
Y |
P |
|
|
Db3 |
10 |
Y |
P |
|
|
Db3 |
11 |
Y |
P |
|
|
Db3 |
12 |
Y |
P |
|
|
Db3 |
13 |
Y |
P |
|
|
Db3 |
15 |
Y |
P |
|
|
Db3 |
19 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Db1 |
G26 |
R |
Y |
Y |
Y |
P |
|
|
|
Db2 |
G27 |
R |
Y |
Y |
Y |
P |
|
|
|
Db2 |
L1-9 |
R |
Y |
Y |
Y |
P |
|
|
|
Db2 |
L1-10 |
R |
Y |
Y |
Y |
P |
|
|
|
Db2 |
L1-11 |
R |
Y |
Y |
Y |
P |
|
|
|
Db2 |
L1-12 |
R |
Y |
Y |
Y |
P |
|
|
|
Db1 |
15 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G19 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G16 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G9 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G8 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G7 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G12 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G15 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G17 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G18 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G14 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G11 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G7 |
S |
Y |
Y |
Y |
P |
|
|
|
Db1 |
16 |
Four x36w bare |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G21 |
Fluro |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G22 |
Fluro |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G23 |
Fluro |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G27 |
Fluro |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G20 |
Fluro |
Y |
Y |
Y |
P |
|
|
|
Db3 |
L1-7 |
Fluro |
Y |
Y |
Y |
P |
|
|
|
Db3 |
L1-8 |
2x36w troffer |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Db1 |
G5 |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G4 |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G3 |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G2 |
Y |
Y |
Y |
P |
|
|
|
Db3 |
L1-3 |
Y |
Y |
Y |
P |
|
|
|
Db3 |
L1-2 |
Y |
Y |
Y |
P |
|
|
|
Db3 |
L1-1 |
Y |
Y |
Y |
P |
|
|
|
Db1 |
9 |
Y |
Y |
Y |
P |
|
|
|
Db1 |
G1 |
Y |
Y |
Y |
P |
|
|
|
Db1 |
6 |
Y |
Y |
Y |
P |
|
|
|
Db1 |
7 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
1x36 bare battens |
Y |
2 x 36w bare and diffused battens |
Y |
2 x 18w proffer lights |
Y |
2 x36 troffers |
Y |
2x 28w troffers |
Y |
90mm led downlights |
Y |
Rectangular metal halide shop lighters |
Y |
400w external flood lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Lighting boxes |
Shop floor |
20 |
Some are blown and tripping power |
N |
N |
TBA |
Noted on repair list for TGG Head Office |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 25/09/2021 |
---|
| |
---|
| |