Partner NameBuilt Electrical Australia
StateVIC
Date of Visit13/04/2021
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number54188
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICmelton

Location NameMelton
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-1 1 Y P
DB-1 3 Y P
DB-1 5 Y P
DB-1 7 Y P
DB-1 9 Y P
DB-1 10 Y P
DB-1 11 Y P
DB-1 12 Y P
DB-1 13 Y P
DB-1 14 Y P
DB-1 15 Y P
DB-1 16 Y P
DB-1 17 Y P
DB-1 18 Y P
DB-1 19 Y P
DB-1 20 Y P
DB-1 21 Y P
DB-1 22 Y P
DB-1 23 Y P
DB-1 24 Y P
DB-1 25 Y P
DB-1 26 Y P
DB-1 27 Y P
DB-1 28 Y P
DB-1 29 Y P
DB-1 30 Y P
DB-1 32 Y P
DB-1 34 Y P
DB-2 1 Y P
DB-2 2 Y P
DB-2 3 Y P
DB-2 4 Y P
DB-2 5 Y P
DB-2 6 Y P
DB-2 7 Y P
DB-2 8 Y P
DB-2 9 Y P
DB-2 10 Y P
DB-2 11 Y P
DB-2 12 Y P
DB-2 13 Y P
DB-2 14 Y P
DB-2 15 Y P
DB-2 16 Y P
DB-2 17 Y P
DB-2 18 Y P
DB-2 19 Y P
DB-2 20 Y P
DB-2 21 Y P
DB-2 22 Y P
DB-2 23 Y P
DB-2 24 Y P
DB-2 25 Y P
DB-2 27 Y P
DB-2 29 Y P
DB-2 31 Y P
DB-2 32 Y P
DB-2 33 Y P
DB-3 1 Y P
DB-3 2 Y P
DB-3 3 Y P
DB-3 4 Y P
DB-3 5 Y P
DB-3 6 Y P
DB-3 7 Y P
DB-3 8 Y P
DB-3 9 Y P
DB-3 10 Y P
DB-3 11 Y P
DB-3 12 Y P
DB-3 13 Y P
DB-3 14 Y P
DB-3 15 Y P
DB-3 16 Y P
DB-3 17 Y P
DB-3 18 Y P
DB-3 19 Y P
DB-3 20 Y P
DB-3 21 Y P
DB-3 22 Y P
DB-3 23 Y P
DB-3 24 Y P
DB-3 25 Y P
DB-3 26 Y P
DB-3 27 Y P
DB-3 28 Y P
DB-3 29 Y P
DB-3 30 Y P
DB-3 31 Y P
DB-3 32 Y P
DB-3 33 Y P
DB-3 34 Y P
DB-3 35 Y P
DB-3 36 Y P
DB-3 37 Y P
DB-3 38 Y P
DB-3 39 Y P
DB-3 40 Y P
DB-3 41 Y P
DB-3 42 Y P
DB-3 43 Y P
DB-3 44 Y P
DB-3 46 Y P
DB-3 54 Y P
DB-3 56 Y P
DB-3 58 Y P
DB-3 64 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 2 S Y Y Y P
DB-1 3 S Y Y Y P
DB-1 4 S Y Y Y P
DB-1 6 S Y Y Y P
DB-1 8 S Y Y Y P
DB-1 9 R Y Y Y P
DB-1 10 R Y Y Y P
DB-1 11 S Y Y Y P
DB-1 12 S Y Y Y P
DB-1 13 S Y Y Y P
DB-1 15 R Y Y Y P
DB-1 16 R Y Y Y P
DB-1 18 S Y N Y F FAILED BATTERY TEST Y N
DB-1 20 R Y Y Y P
DB-1 21 R Y Y Y P
DB-1 22 R Y Y Y P
DB-1 23 R Y Y Y P
DB-1 25 S Y Y Y P
DB-1 26 S Y Y Y P
DB-1 27 S Y Y Y P
DB-1 29 S Y Y Y P
DB-1 30 S Y Y Y P
DB-1 31 S Y Y Y P
DB-1 33 S Y Y Y P
DB-1 35 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-1 1 Y N Y F FAILED BATTERY TEST Y N
DB-1 5 Y Y Y P
DB-1 7 Y Y Y P
Db-1 14 Y Y N F MSSING DIRECTIONAL ARROWS Y N
DB-1 17 Y Y Y P
DB-1 19 N Y Y P FAILED TO ILLUMINATE Y N
DB-1 24 Y Y Y P
DB-1 28 Y Y Y P
DB-1 32 Y Y Y P
DB-1 34 N Y Y P FAILED TO ILLUMINATE Y N
DB-1 36 Y Y Y P
DB-1 37 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Hi-Bay Lights Y
Square Hi-Bay Lights Y
Halogen 50W Lights Y
36W Diffused Single Lights Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
DAVIS BLACK HI-BAY BOH ENTRANCE AND FRIDGES 2 FAILED TO ILLUMINATE DAVIS Y REPLACED ON SITE WHILE WE HAD SCISSOR LIFT - NO CHARGE FOR REPLACEMENT PARTS OR LABOUR
Geotag photo(s)
  • Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
TEST AND TAG STORE 80+ TEST AND TAG IN-DATE, RETEST REQUIRED 20 NOV 2021 N N N OBSERVATION
FLOODLIGHT RECEIVING BOH 1 FAILED TO ILLUMINATE N TBC TBC SERVICE JOB CAME THROUGH FOR THIS ITEM, AFTER INVESTIGATING IT APPEARS THERE IS NO POWER PRESENT AT THE LIGHT FITTING FROM SWITCHBOARD. OUR ASSUPTION IS THAT IT IS POSSIBLY CONTROLLED BY CENTRE. EMAILED SONNY AND AMBER TO LOOK INTO
RACK LIGHT BOX SMART HOME 1×2.4M FAILED TO ILLUMINATE N N N REPLACE WITH 5 X LED LINKABLE LIGHTS AT NEXT AUDIT
EX19 RECEIVING SINGLE MAN DOOR BOH 1 LAMP FAILED TO ILLUMINATE Y N N REPLACED LAMP WITH NEW 18W
EX34 BOH 1 LAMP FAILED TO ILLUMINATE Y N N REPLACED LAMP WITH NEW 18W
EX14 FOOD PROCESSORS 1 MISSING DIRECTIONAL ARROWS Y N N REPLACED WITH NEW
EM18 BOH 1 FAILED BATTERY TEST Y N N REPLACED WITH NEW
EX01 FRONT ENTRANCE SINGLE MAN DOOR 1 FAILED BATTERY TEST Y N N REPLACED WITH NEW
RACK LIGHT BOX HEATING AND COOLING 1 FAILED TO ILLUMINATE Y N N INVESTIGATED, FOUND DISCONNECTED, RECONNECTED NOW WORKING, NO FURTHER ACTION REQUIRED
Site Status SelectorStore now fully compliant
Next Test Due in 6 months13/10/2021