Partner NameTransit Electrical Pty Ltd
StateWA
Date of Visit13/04/2021
Technician's NameBayley Woodroffe
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number54725
EmailEmail hidden; Javascript is required.
The Good Guys Site in WAclarkson

Location NameClarkson
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 01 1 Y P
DB 01 3 Y P
DB 01 5 Y P
DB 01 9 Y P
DB 01 2 Y P
DB 01 4 Y P
DB 01 6 Y P
DB 01 8 Y P
DB 01 10 Y P
DB 01 12 Y P
DB 01 14 Y P
DB 01 16 Y P
DB 01 18 Y P
DB 01 20 Y P
DB 02 13 Y P
DB 02 15 Y P
DB 02 17 Y P
DB 02 19 Y P
DB 02 25 Y P
DB 02 27 Y P
DB 02 2 Y P
DB 02 4 Y P
DB 02 6 Y P
DB 02 8 Y P
DB 02 10 Y P
DB 02 12 Y P
DB 02 14 Y P
DB 02 16 Y P
DB 02 18 Y P
DB 02 20 Y P
DB 02 22 Y P
DB 02 24 Y P
DB 02 26 Y P
DB 02 28 Y P
DB MSB 31 Y P
DB MSB 33 Y P
DB MSB 35 Y P
DB MSB 37 Y P
DB MSB 39 Y P
DB MSB 41 Y P
DB MSB 43 Y P
DB MSB 45 Y P
DB MSB 14 Y P
DB MSB 16 Y P
DB MSB 18 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB MSB 2 S Dual Y Y Y P
DB MSB 3 S Dual Y Y Y P
DB MSB 4 S-2 by 36w batten Y Y Y P
DB MSB 5 S Y Y Y P
DB MSB 6 S-2 by 36w batten Y Y Y P
DB MSB 8 S-2 by 36w batten Y Y Y P
DB MSB 9 S Dual Y Y Y P
DB MSB 10 R Y Y Y P
DB MSB 11 S Y Y Y P
DB MSB 22 R Y Y Y P
DB MSB 23 R Y Y Y P
DB MSB 25 S Dual Y Y Y P
DB MSB 26 S Dual Y Y Y P
DB MSB 27 S Dual Y Y Y P
DB MSB 28 S Dual Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB MSB 1 Y Y Y P
DB MSB 7 Y Y Y P
DB MSB 12 Y Y Y P
DB MSB 13 Y Y Y P
DB MSB 14 Y Y Y P
DB MSB 15 Y Y Y P
DB MSB 16 Y Y Y P
DB MSB 17 Y Y Y P
DB MSB 18 Y Y Y P
DB MSB 19 Y Y Y P
DB MSB 20 Y Y Y P
DB MSB 21 Y Y Y P
DB MSB 24 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED Hibay Y
LED Davis Batten Y
Round Hanco Recessed Lights Y
Weather Proof Batten Y
Vandle light Y
Exits Y
2 x 36w Batten EM lights Y
Dual LED Surface Mount EM Lights Y
LED Surface Mount EM Lights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
DB 02 Legend DB 02 1 Does not exist N N N Switchboard Legend in DB 02 not filled out/doesn't exist. Quote recommendation listed on fortnightly report
Pelmet Lights/Light Boxes Shop Floor 22 Total of 77 x lamps not fully illuminated Y N N Supplied and replaced 37 x 58w lamps, 19 x 36w lamps, 21 x 18w lamps & 49 x starters
Site Status SelectorStore now fully compliant
Next Test Due in 6 months13/10/2021