| Partner Name | Rodda Electrical |
|---|
| State | SA |
|---|
| Date of Visit | 14/04/2021 |
|---|
| Technician's Name | Matt Rodda |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 54856 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in SA | mile_end |
|---|
|
|
|---|
| Location Name | Mile End |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB.T8/9 |
R13 |
Y |
P |
|
|
|
W13 |
Y |
P |
|
|
|
B13 |
Y |
P |
|
|
|
R14 |
Y |
P |
|
|
|
W14 |
Y |
P |
|
|
|
R15 |
Y |
P |
|
|
|
W15 |
Y |
P |
|
|
|
B16 |
Y |
P |
|
|
|
RWB18 |
Y |
P |
|
|
|
B189 |
Y |
P |
|
|
|
R21 |
Y |
P |
|
|
|
W21 |
Y |
P |
|
|
|
B21 |
Y |
P |
|
|
|
W23 |
Y |
P |
|
|
|
B23 |
Y |
P |
|
|
|
R25 |
Y |
P |
|
|
|
R26 |
Y |
P |
|
|
| DB.T8/9A |
W45 |
Y |
P |
|
|
|
B46 |
Y |
P |
|
|
|
R48 |
Y |
P |
|
|
|
W48 |
Y |
P |
|
|
|
B48 |
Y |
P |
|
|
|
R50 |
Y |
P |
|
|
|
W50 |
Y |
P |
|
|
|
B50 |
Y |
P |
|
|
|
R52 |
Y |
P |
|
|
|
W52 |
Y |
P |
|
|
|
B52 |
Y |
P |
|
|
|
R54 |
Y |
P |
|
|
|
W54 |
Y |
P |
|
|
|
B54 |
Y |
P |
|
|
|
R56 |
Y |
P |
|
|
|
W56 |
Y |
P |
|
|
|
B56 |
Y |
P |
|
|
|
R58 |
Y |
P |
|
|
|
B58 |
Y |
P |
|
|
|
W59 |
Y |
P |
|
|
|
B59 |
Y |
P |
|
|
|
R60 |
Y |
P |
|
|
|
R61 |
Y |
P |
|
|
|
W61 |
Y |
P |
|
|
|
B61 |
Y |
P |
|
|
|
R63 |
Y |
P |
|
|
|
W63 |
Y |
P |
|
|
|
B63 |
Y |
P |
|
|
|
R64 |
Y |
P |
|
|
|
W64 |
Y |
P |
|
|
|
B64 |
Y |
P |
|
|
|
R65 |
Y |
P |
|
|
|
W65 |
Y |
P |
|
|
|
B65 |
Y |
P |
|
|
|
R66 |
Y |
P |
|
|
|
W66 |
Y |
P |
|
|
|
B66 |
Y |
P |
|
|
|
R67 |
Y |
P |
|
|
|
W67 |
Y |
P |
|
|
|
B67 |
Y |
P |
|
|
|
R68 |
Y |
P |
|
|
|
W68 |
Y |
P |
|
|
|
B68 |
Y |
P |
|
|
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
22 |
R |
Y |
Y |
Y |
P |
|
|
|
|
23 |
S |
Y |
Y |
Y |
P |
|
|
|
|
24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| Hibay lights |
Y |
| 1 x 36w bare batten |
Y |
| 10w downlights |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Rear DB |
Warehouse |
1 |
Pole fillers missing |
N |
N |
N |
To be replaced on next site visit |
| Front DB |
Store Entry |
1 |
Noisy contactor |
Y |
N |
N |
Replaced with new contactor |
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 15/10/2021 |
|---|
| |
|---|
| |