Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
EDB-4 02 Y P
EDB-4 04 Y P
EDB-4 06 Y P
EDB-4 08 Y P
EDB-4 10 Y P
EDB-4 12 Y P
EDB-4 14 Y P
EDB-4 16 Y P
EDB-4 18 Y P
EDB-4 19 Y P
EDB-4 20 Y P
EDB-4 21 Y P
EDB-4 22 Y P
EDB-4 23 Y P
EDB-4 24 Y P
EDB-4 25 Y P
EDB-4 26 Y P
EDB-4 27 Y P
EDB-4 28 Y P
EDB-4 29 Y P
EDB-4 30 Y P
EDB-4 31 Y P
EDB-4 32 Y P
EDB-4 33 Y P
EDB-4 34 Y P
EDB-4 35 Y P
EDB-4 36 Y P
EDB-4 37 Y P
EDB-4 38 Y P
EDB-4 39 Y P
EDB-4 40 Y P
EDB-4 41 Y P
EDB-4 42 Y P
EDB-4 43 Y P
EDB-4 44 Y P
EDB-4 45 Y P
EDB-4 46 Y P
EDB-4 47 Y P
EDB-4 48 Y P
EDB-4 50 Y P
EDB-4 51 Y P
EDB-4 52 Y P
EDB-4 53 Y P
EDB-4 55 Y P
EDB-4 56 Y P
EDB-4 57 Y P
EDB-4 58 Y P
EDB-4 59 Y P
EDB-4 60 Y P
EDB-5 02 Y P
EDB-5 04 Y P
EDB-5 07 Y P
EDB-5 08 Y P
EDB-5 09 Y P
EDB-5 10 Y P
EDB-5 11 Y P
EDB-5 12 Y P
EDB-5 13 Y P
EDB-5 14 Y P
EDB-5 16 Y P
EDB-5 17 Y P
EDB-5 19 Y P
EDB-5 22 Y P
EDB-5 24 Y P
EDB-5 26 Y P
EDB-5 28 Y P
DB-1 04 Y P
DB-1 06 Y P
DB-1 08 Y P
DB-1 09 Y P
DB-1 10 Y P
DB-1 11 Y P
DB-1 12 Y P
DB-1 13 Y P
DB-1 14 Y P
DB-1 15 Y P
DB-1 16 Y P
DB-1 17 Y P
DB-1 18 Y P
DB-1 19 Y P
DB-1 20 Y P
DB-1 21 Y P
DB-1 23 Y P
DB-1 25 Y P
DB-1 27 Y P
DB-1 29 Y P
DB-1 31 Y P
DB-1 33 Y P
DB-1 35 Y P
DB-1 37 Y P
MAIN SB 35 Y P
MAIN SB 37 Y P
MAIN SB 40 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 Extension 1 R Y Y Y P
2 R Y Y Y P
3 R Y Y Y P
4 R Y Y Y P
5 R Y Y Y P
6 R Y Y Y P
7 R Y Y Y P
8 R Y Y Y P
9 R Y Y Y P
10 R Y Y Y P
11 R Y Y Y P
12 R Y Y Y P
13 R Y Y Y P
14 R Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
20 S Y N Y F Failed battery test Y N
21 S Y Y Y P
24 R Y Y Y P
26 R Y Y Y P
27 R Y Y Y P
28 S Y Y Y P
99 R Y Y Y P
100 R Y Y Y P
101 R Y Y Y P
102 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 Extension EX03 Y Y Y P
EX17 Y Y Y P
EX22 Y Y Y P
EX23 Y Y Y P
Ex29 Y Y Y P
EX31 Y Y Y P
EX32 Y Y Y P
EX95 Y Y Y P
EX96 Y Y Y P
EX97 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
T5 Double Fluorescent Lights Y
Single 36W Fluorescent Lights Y
70mm Downlights Y
Exit Lights Y
Emergency Lights Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
PANEL LIGHTS SHOP FLOOR 7 PANEL LIGHTS DISCOLOURED 50 % YELLOW DAVIS N Wait for parts to be procured before returning to site
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
SINGLE MAN DOOR TO SHOP FLOOR NORTH/EAST SIDE TOWARDS TVS 1 DOOR NOT OPERATING AS REQUIRED, CURRENTLY CAN BE OPEN FROM BOTH DIRECTIONS WITHOUT USE OF FOB, DOOR SHOULD NOT OPEN FROM HALLWAY ONTO SHOP FLOOR N TBC TBC JOB TO BE LODGED
BUILDING ALARMS EXTENSION 1 AFTER EXTENSION HAS BEEN ARMED AND STAFF LEFT, OTHER BUILDING IS ALARMING N TBC TBC REPORTED BY NICK. JOB REQUEST TO BE SENT TO SECURITY TEAM IF REQUIRED.
DOWNLIGHTS TV AREA 66 MAJORITY OF DOWNLIGHTS FAILED TO ILLUMINATE N N N APPROVED QUOTED WORKS TO TAKE PLACE 03/05/2021
EMERGENCY LIGHTING PLAN BOTH SITES 1 EMERGENCY LIGHTING PLAN TEMPORARILY UPDATED DUE TO NEW LAYOUTS, NEW BUILDING PLANS TO BE PRINTED AND UPDATED AT NEXT AUDIT N N N EMAILED CHANTELLE REQUESTING LAYOUTS
MONITOR WALL POWER MONITORS 1 CIRCUIT TRIPS WHEN ALL MONITORS PLUGGED IN N TBA TBA INFORMED BY MANAGER NICK. INVESTIGATION REQUIRED BEFORE TRADE. PLEASE ADVISE IF THIS IS REQUIRED TO BE QUOTED
EM20 BOH 1 FAILED BATTERY TEST Y N N REPLACED WITH NEW. SCISSOR LIFT WAS REQUIRED
Site Status SelectorStore now fully compliant