Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 21/04/2021 |
---|
Technician's Name | James Patterson |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 54729 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | osborne_park_warehouse |
---|
|
|
---|
Location Name | Osborne Park Warehouse |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
Warehouse DB |
R1 |
Y |
P |
|
|
|
W3 |
Y |
P |
|
|
|
B5 |
Y |
P |
|
|
|
R7 |
Y |
P |
|
|
|
W9 |
Y |
P |
|
|
|
B11 |
Y |
P |
|
|
|
R13 |
Y |
P |
|
|
|
W15 |
Y |
P |
|
|
|
B17 |
Y |
P |
|
|
|
R19 |
Y |
P |
|
|
|
W21 |
Y |
P |
|
|
|
B23 |
Y |
P |
|
|
|
R2 |
Y |
P |
|
|
|
W4 |
Y |
P |
|
|
|
B6 |
Y |
P |
|
|
|
R8 |
Y |
P |
|
|
|
W10 |
Y |
P |
|
|
|
B12 |
Y |
P |
|
|
|
R14 |
Y |
P |
|
|
|
W16 |
Y |
P |
|
|
|
B18 |
Y |
P |
|
|
|
R20 |
Y |
P |
|
|
|
W22 |
Y |
P |
|
|
|
B24 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
2 |
4ft LED emergency batten |
Y |
Y |
Y |
P |
|
|
|
|
6 |
4ft LED emergency batten |
Y |
Y |
Y |
P |
|
|
|
|
7 |
4ft LED emergency batten |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
N |
Y |
F |
|
Y |
N |
|
5 |
Y |
N |
Y |
F |
|
Y |
Y |
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Report on any faulty luminaries/control gear
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
400w Hi-Bay Lights |
Y |
Exit Lights Jumbo Stanilite |
Y |
DAVIS 4ft LED emergency batten |
Y |
|
---|
Are there any Warranty items needing to be repaired? | Yes |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
Exit #5 |
Warehouse |
1 |
Battery |
ABB |
|
Y |
Battery terminals plugged in failed to engage at start of test |
|
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Exit #4 |
Warehouse |
1 |
Battery |
Y |
N |
N |
Battery terminals plugged in failed to engage at start of test |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 21/10/2021 |
---|
| |
---|
| |