Partner Name | Built Services |
---|
State | WA |
---|
Date of Visit | 29/04/2021 |
---|
Technician's Name | Justin Oliver |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 54726 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | geraldton |
---|
|
|
---|
Location Name | Geraldton |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
MDB |
R26 |
Y |
P |
|
|
|
W26 |
Y |
P |
|
|
|
B26 |
Y |
P |
|
|
|
R28 |
Y |
P |
|
|
|
W28 |
Y |
P |
|
|
|
B28 |
Y |
P |
|
|
|
R30 |
Y |
P |
|
|
|
W30 |
Y |
P |
|
|
|
B30 |
Y |
P |
|
|
|
R32 |
Y |
P |
|
|
|
W32 |
Y |
P |
|
|
|
R1 |
Y |
P |
|
|
|
W1 |
Y |
P |
|
|
|
B1 |
Y |
P |
|
|
|
R3 |
Y |
P |
|
|
|
W3 |
Y |
P |
|
|
|
R5 |
Y |
P |
|
|
|
R25 |
Y |
P |
|
|
|
W25 |
Y |
P |
|
|
|
R27 |
Y |
P |
|
|
|
W27 |
Y |
P |
|
|
|
B27 |
Y |
P |
|
|
|
W25 |
Y |
P |
|
|
|
B25 |
Y |
P |
|
|
DB 1 |
R1 |
Y |
P |
|
|
|
W1 |
Y |
P |
|
|
|
B1 |
Y |
P |
|
|
|
R3 |
Y |
P |
|
|
|
W3 |
Y |
P |
|
|
|
B3 |
Y |
P |
|
|
|
R5 |
Y |
P |
|
|
|
W5 |
Y |
P |
|
|
|
B5 |
Y |
P |
|
|
|
R7 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MDB |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
N |
N |
N |
F |
FAILED TEST |
Y |
N |
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
MDB |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Double Batten Fluoro |
Y |
Single Fluoro |
Y |
LED HiBay |
Y |
Floodlights |
Y |
Sensor Floods |
Y |
Emergency Lights - surface mount |
Y |
Exit Lights |
Y |
Sensor Floodlights |
Y |
Batten Holders |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Surface Mount Emergency #3 |
Office Store |
1 |
Failed Test |
Y |
N |
N |
|
18w lamps |
MSB/Comms |
3 |
Blown lamps |
Y |
N |
N |
|
Fluoro lamp |
Rear Office |
2 |
Faulty starters |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 29/10/2021 |
---|
| |
---|
| |