Partner Name | Built Services |
---|
State | SA |
---|
Date of Visit | 19/05/2021 |
---|
Technician's Name | Allister Green |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 54857 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in SA | noarlunga |
---|
|
|
---|
Location Name | Noarlunga |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
5 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
23 |
Y |
P |
|
|
|
25 |
Y |
P |
|
|
|
27 |
Y |
P |
|
|
|
29 |
Y |
P |
|
|
|
31 |
Y |
P |
|
|
|
33 |
Y |
P |
|
|
|
35 |
Y |
P |
|
|
|
37 |
Y |
P |
|
|
|
39 |
Y |
P |
|
|
|
41 |
Y |
P |
|
|
|
43 |
Y |
P |
|
|
|
47 |
Y |
P |
|
|
|
49 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
24 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
|
30 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
36 |
Y |
P |
|
|
|
38 |
Y |
P |
|
|
|
40 |
Y |
P |
|
|
|
42 |
Y |
P |
|
|
|
44 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
|
50 |
Y |
P |
|
|
|
52 |
Y |
P |
|
|
|
54 |
Y |
P |
|
|
|
56 |
Y |
P |
|
|
|
60 |
Y |
P |
|
|
|
62 |
Y |
P |
|
|
|
64 |
Y |
P |
|
|
|
66 |
Y |
P |
|
|
|
68 |
Y |
P |
|
|
|
70 |
Y |
P |
|
|
DB. A1. |
R3 |
Y |
P |
|
|
|
W3 |
Y |
P |
|
|
|
B3 |
Y |
P |
|
|
|
W2 |
Y |
P |
|
|
|
W3 |
Y |
P |
|
|
|
W4 |
Y |
P |
|
|
|
B3 |
Y |
P |
|
|
|
B4 |
Y |
P |
|
|
|
B16 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB. A1 |
1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB. A1 |
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Surface mounted Battens (L.E.D.) |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 19/11/2021 |
---|
| |
---|
| |