Partner NameTransit Electrical Pty Ltd
StateWA
Date of Visit11/06/2021
Technician's NameBayley Woodroffe
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number54733
EmailEmail hidden; Javascript is required.
The Good Guys Site in WArockingham

Location NameRockingham
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB 01 front of store 1R Y P
DB 01 front of store 1W Y P
DB 01 front of store 1B Y P
DB 01 front of store 3R Y P
DB 01 front of store 3W Y P
DB 01 front of store 3B Y P
DB 01 front of store 5R Y P
DB 01 front of store 5W Y P
DB 01 front of store 5B Y P
DB 01 front of store 7R Y P
DB 01 front of store 7W Y P
DB 01 front of store 7B Y P
DB 01 front of store 9R Y P
DB 01 front of store 9W Y P
DB 01 front of store 9B Y P
DB 01 front of store 2R Y P
DB 01 front of store 2W Y P
DB 01 front of store 2B Y P
DB 01 front of store 4R Y P
DB 01 front of store 4W Y P
DB 01 front of store 4B Y P
DB 01 front of store 6R Y P
DB 01 front of store 6W Y P
DB 01 front of store 6B Y P
DB 01 front of store 8W Y P
DB 02 power chassie 1W Y P
DB 02 power chassie 1B Y P
DB 02 power chassie 3R Y P
DB 02 power chassie 3W Y P
DB 02 power chassie 3B Y P
DB 02 power chassie 5R Y P
DB 02 power chassie 5W Y P
DB 02 power chassie 5B Y P
DB 02 power chassie 7R Y P
DB 02 power chassie 7W Y P
DB 02 power chassie 7B Y P
DB 02 power chassie 9R Y P
DB 02 power chassie 9W Y P
DB 02 power chassie 9B Y P
DB 02 power chassie 11R Y P
DB 02 power chassie 11W Y P
DB 02 power chassie 13RWB Y P
DB 02 power chassie 19RWB Y P
DB 02 power chassie 2R Y P
DB 02 power chassie 2W Y P
DB 02 power chassie 2B Y P
DB 02 power chassie 4R Y P
DB 02 power chassie 4W Y P
DB 02 power chassie 4B Y P
DB 02 power chassie 6W Y P
DB 02 power chassie 6B Y P
DB 02 power chassie 8R Y P
DB 02 power chassie 8W Y P
DB 02 power chassie 8B Y P
DB 02 power chassie 10R Y P
DB 02 power chassie 10W Y P
DB 02 power chassie 10B Y P
DB 02 power chassie 12R Y P
DB 02 power chassie 14RWB Y P
DB 02 power chassie 18RWB Y P
DB 02 power chassie 24RWB Y P
DB 02 - the good guys chassie 1B Y P
DB 02 - the good guys chassie 3R Y P
DB 02 - the good guys chassie 3W Y P
DB 02 - the good guys chassie 3B Y P
DB 02 - the good guys chassie 5R Y P
DB 02 - the good guys chassie 5W Y P
DB 02 - the good guys chassie 7R Y P
DB 02 - the good guys chassie 7W Y P
DB 02 - the good guys chassie 7B Y P
DB 02 - the good guys chassie 9W Y P
DB 02 - the good guys chassie 11R Y P
DB 02 - the good guys chassie 2R Y P
DB 02 - the good guys chassie 2W Y P
DB 02 - the good guys chassie 2B Y P
DB 02 - the good guys chassie 4R Y P
DB 02 - the good guys chassie 4W Y P
DB 02 - the good guys chassie 4B Y P
DB 02 - the good guys chassie 6W Y P
DB 02 - the good guys chassie 6B Y P
DB 03 1R Y P
DB 03 3R Y P
DB 03 5R Y P
DB 03 2R Y P
DB 03 4R Y P
DB 03 6R Y P
DB 03 6W Y P
DB 03 6B Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 02- lighting chassie 8 S Twin LED Y Y Y P
DB 02- lighting chassie 9 S Twin LED Y Y Y P
DB 02- lighting chassie 10 S Twin LED Y Y Y P
DB 02- lighting chassie 11 S Y Y Y P
DB 02- lighting chassie 12 S Y Y Y P
DB 02- lighting chassie 13 S Y Y Y P
DB 02- lighting chassie 14 S Twin LED Y Y Y P
DB 02- lighting chassie 15 S 2 by 36w defused emergency batten Y Y Y P
DB 02- lighting chassie 16 R Y Y Y P
DB 02- lighting chassie 17 R Y Y Y P
DB 02- lighting chassie 19 R Y Y Y P
DB 02- lighting chassie 20 S 2 by 36w defused batten Y Y Y P
DB 02- lighting chassie 21 S Twin LED Y Y Y P
DB 02- lighting chassie 24 R Y Y Y P
DB 02- lighting chassie 26 R Y N Y F Failed test Y N
DB 02- lighting chassie 27 R Y N Y F Failed test Y N
DB 02- lighting chassie 28 R Y Y Y P
DB 02- lighting chassie 29 R Y Y Y P
DB 02- lighting chassie 30 R Y Y Y P
DB 02- lighting chassie 31 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 02- lighting chassie 1 Y Y Y P
DB 02- lighting chassie 2 Y N Y F Failed test Y N
DB 02- lighting chassie 3 Y Y Y P
DB 02- lighting chassie 4 Y Y Y P
DB 02- lighting chassie 5 Y Y Y P
DB 02- lighting chassie 6 Y Y Y P
DB 02- lighting chassie 7 Y Y Y P
DB 02- lighting chassie 18 Y Y Y P
DB 02- lighting chassie 22 Y Y Y P
DB 02- lighting chassie 23 Y Y Y P
DB 02- lighting chassie 25 Y Y Y P
DB 02- lighting chassie 32 Y Y Y P
DB 02- lighting chassie 33 Y Y Y P
DB 02- lighting chassie 34 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
2 x 36w defused battens Y
Davis LED batten Y
4 foot LED slimline batten Y
400w mh hibay Y
LED hibay Y
Exit sign Y
Jumbo exit sign Y
2 by 36w emergency batten Y
50w hallogen down light Y
Emergency spit fire Y
Surface mount emergency Y
Twin LED surface mount emergency Y
Oyster light Y
2 by 28w wp battens Y
LED flood light Y
2 by 36w troffer lights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Exit #2 Store Entry 1 Failed test Y N N OH&S
Recessed Emergency #26 Office 1 Failed test Y N N OH&S
Recessed Emergency #27 Males Toilet 1 Failed test Y N N OH&S
Site Status SelectorStore now fully compliant
Next Test Due in 6 months11/12/2021