Partner Name | Built Electrical QLD |
---|
State | QLD |
---|
Date of Visit | 04/08/2021 |
---|
Technician's Name | Anthony Molyneux |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 58595 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in QLD | macgregor |
---|
|
|
---|
Location Name | Macgregor |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 Warehouse |
1 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
23 |
Y |
P |
|
|
|
24 |
Y |
P |
|
|
|
25 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
|
27 |
Y |
P |
|
|
|
28 |
Y |
P |
|
|
|
29 |
Y |
P |
|
|
|
30 |
Y |
P |
|
|
|
31 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
40 |
Y |
P |
|
|
|
41 |
Y |
P |
|
|
|
42 |
Y |
P |
|
|
|
43 |
Y |
P |
|
|
|
44 |
Y |
P |
|
|
|
45 |
Y |
P |
|
|
|
46 |
Y |
P |
|
|
|
47 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
|
49 |
Y |
P |
|
|
|
50 |
Y |
P |
|
|
|
51 |
Y |
P |
|
|
|
52 |
Y |
P |
|
|
|
53 |
Y |
P |
|
|
|
54 |
Y |
P |
|
|
|
55 |
Y |
P |
|
|
|
56-61 |
Y |
P |
|
|
|
62 |
Y |
P |
|
|
|
63 |
Y |
P |
|
|
|
64 |
Y |
P |
|
|
|
65 |
Y |
P |
|
|
|
66 |
Y |
P |
|
|
|
67 |
Y |
P |
|
|
|
68 |
Y |
P |
|
|
|
69 |
Y |
P |
|
|
|
70 |
Y |
P |
|
|
|
71 |
Y |
P |
|
|
|
76 |
Y |
P |
|
|
|
77 |
Y |
P |
|
|
|
78 |
Y |
P |
|
|
|
79 |
Y |
P |
|
|
|
80 |
Y |
P |
|
|
|
81 |
Y |
P |
|
|
|
82 |
Y |
P |
|
|
|
83 |
Y |
P |
|
|
|
84 |
Y |
P |
|
|
|
85 |
Y |
P |
|
|
|
86 |
Y |
P |
|
|
|
87 |
Y |
P |
|
|
|
88 |
Y |
P |
|
|
|
89 |
Y |
P |
|
|
|
90 |
Y |
P |
|
|
|
91 |
Y |
P |
|
|
|
92 |
Y |
P |
|
|
|
93 |
Y |
P |
|
|
|
94 |
Y |
P |
|
|
|
95 |
Y |
P |
|
|
|
96 |
Y |
P |
|
|
|
97 |
Y |
P |
|
|
|
98 |
Y |
P |
|
|
|
99 |
Y |
P |
|
|
|
100 |
Y |
P |
|
|
|
101 |
Y |
P |
|
|
|
102 |
Y |
P |
|
|
|
103 |
Y |
P |
|
|
|
104 |
Y |
P |
|
|
|
105 |
Y |
P |
|
|
|
106 |
Y |
P |
|
|
|
107 |
Y |
P |
|
|
|
109 |
Y |
P |
|
|
|
110 |
Y |
P |
|
|
|
111 |
Y |
P |
|
|
|
112 |
Y |
P |
|
|
|
113 |
Y |
P |
|
|
|
114 |
Y |
P |
|
|
|
115 |
Y |
P |
|
|
|
116 |
Y |
P |
|
|
|
117 |
Y |
P |
|
|
|
118 |
Y |
P |
|
|
|
119 |
Y |
P |
|
|
|
120 |
Y |
P |
|
|
|
121 |
Y |
P |
|
|
|
122 |
Y |
P |
|
|
|
123 |
Y |
P |
|
|
|
124 |
Y |
P |
|
|
|
127 |
Y |
P |
|
|
|
128 |
Y |
P |
|
|
|
129 |
Y |
P |
|
|
|
130 |
Y |
P |
|
|
|
131 |
Y |
P |
|
|
|
132 |
Y |
P |
|
|
|
133 |
Y |
P |
|
|
|
134 |
Y |
P |
|
|
|
135 |
Y |
P |
|
|
|
136 |
Y |
P |
|
|
|
137 |
Y |
P |
|
|
|
138 |
Y |
P |
|
|
|
139 |
Y |
P |
|
|
|
140 |
Y |
P |
|
|
|
141 |
Y |
P |
|
|
DB2 Front of store |
1 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
EM1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
Em18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
EX1 |
Y |
Y |
Y |
P |
|
|
|
|
Ex2 |
Y |
Y |
Y |
P |
|
|
|
|
Ex3 |
|
Y |
Y |
P |
|
|
|
|
Ex4 |
Y |
Y |
Y |
P |
|
|
|
|
Ex5 |
Y |
Y |
Y |
P |
|
|
|
|
Ex6 |
Y |
Y |
Y |
P |
|
|
|
|
Ex7 |
Y |
Y |
Y |
P |
|
|
|
|
Ex8 |
Y |
Y |
Y |
P |
|
|
|
|
Ex9 |
Y |
Y |
Y |
P |
|
|
|
|
Ex10 |
Y |
Y |
Y |
P |
|
|
|
|
Ex11 |
Y |
Y |
Y |
P |
|
|
|
|
Ex12 |
Y |
Y |
Y |
P |
|
|
|
|
Ex13 |
Y |
Y |
Y |
P |
|
|
|
|
Ex14 |
Y |
Y |
Y |
P |
|
|
|
|
Ex15 |
Y |
Y |
Y |
P |
|
|
|
|
Ex16 |
Y |
Y |
Y |
P |
|
|
|
|
Ex17 |
Y |
Y |
Y |
P |
|
|
|
|
Ex18 |
Y |
Y |
Y |
P |
|
|
|
|
Ex19 |
Y |
Y |
Y |
P |
|
|
|
|
Ex20 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Suspended LED extrusion |
Y |
LED UFO Hi-bay 150W |
Y |
Surface-mount LED down lights |
Y |
Suspended LED track light spot lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | Yes |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
LED High Bay Lamp |
Warehouse and shop |
4 |
Failing/failed |
Davis |
Unverified |
Y |
Returned to site 17/08/21 to replace. |
|
---|
Geotag photo(s) | - Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
|
---|
Site Status Selector | QLD - Maintenance has been completed in accordance to ASS2293.2 and QD MP6.1. - Store now fully compliant |
---|
Next Test Due in 6 months | 04/02/2021 |
---|
| |
---|
| |