StateACT
Date of Visit10/08/2021
Technician's NameWill Andrews
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number58139
EmailEmail hidden; Javascript is required.
The Good Guys Site in ACTfyshwick

Location NameFyshwick
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 1 Y P
2 Y P
3 Y P
4 Y P
5 Y P
6 Y P
7 Y P
8 Y P
9 Y P
10 Y P
11 Y P
12 Y P
16 Y P
17 Y P
18 Y P
19 Y P
20 Y P
21 Y P
22 Y P
23 Y P
24 Y P
25 Y P
26 Y P
27 Y P
28 Y P
29 Y P
30 Y P
31 Y P
32 Y P
33 Y P
34 Y P
35 Y P
36 Y P
37 Y P
38 Y P
39 Y P
40 Y P
41 Y P
42 Y P
43 Y P
44 Y P
45 Y P
46 Y P
47 Y P
48 Y P
50 Y P
51 Y P
52 Y P
53 Y P
54 Y P
55 Y P
56 Y P
57 Y P
58 Y P
59 Y P
60 Y P
61 Y P
62 Y P
63 Y P
64 Y P
65 Y P
66 Y P
67 Y P
68 Y P
69 Y P
70 Y P
71 Y P
72 Y P
MSSB-1 14 Y P
36 N F Failed push button test Y
DB2 2 Y P
4 Y P
6 Y P
7 Y P
8 Y P
9 Y P
10 Y P
12 Y P
14 Y P
16 Y P
18 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 16 R Y Y Y P
17 R Y Y Y P
19 S Y Y Y P
11 R Y Y Y P
12 R Y Y Y P
10 S Y Y Y P
9 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 431600 Y Y Y P
431595 Y Y Y P
431596 Y Y Y P
444067 Y Y Y P
5 Y Y Y P
18 Y Y Y P
431097 N N N F Failed 90 min test Y N
12 Y Y Y P
13 Y Y Y P
1 Y Y Y P
431601 Y Y Y P
14 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auNo
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
3ft 30W Fluro N
Twin 36W Troffer Y
150W Metal Halide Track Light N
LED HIBAY Y
Square LED Shop Light N
Round LED Shop Light N
Single 36W Caged Fluro Y
2 x 28W T5 Fitting N
21W T5 Fitting Bare N
Rectangle Metal Halide Shop Light N
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
CB36 MSSB-1 1 Failed push button test Y N N Replaced RCD
Exit light# 431097 Back Stock Room 1 Failed 90 min test Y N N Replaced exit light
Monitor Light Box Front of store on RHS 1 Trips power N N N To be rectified under LED upgrade
Switchboard legend Switchboard 1 Does not exist N N N Legend to be drawn up upon next audit and placed onsite
EX/EM layout Office 1 Does not exist N N N Layout to be drawn up upon next audit and placed onsite
Site Status SelectorStore now fully compliant
Next Test Due in 6 months10/02/2022