State | NSW |
---|
Date of Visit | 13/08/2021 |
---|
Technician's Name | Peter Hay |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 58195 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | tuggerah |
---|
|
|
---|
Location Name | Tuggerah |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
3 |
SMSF |
Y |
Y |
Y |
P |
|
|
|
DB1 |
4 |
SMSF |
Y |
Y |
Y |
P |
|
|
|
DB1 |
5 |
SM Twin Fluro |
Y |
Y |
Y |
P |
|
|
|
DB1 |
12 |
RSF |
Y |
Y |
Y |
P |
|
|
|
DB1 |
15 |
RSF |
Y |
Y |
Y |
P |
|
|
|
DB1 |
16 |
RSF |
Y |
Y |
Y |
P |
|
|
|
DB1 |
17 |
RSF |
Y |
Y |
Y |
P |
|
|
|
DB1 |
18 |
RSF |
Y |
Y |
Y |
P |
|
|
|
DB1 |
19 |
SMSF |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
2 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
6 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
7 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
8 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
9 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
10 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
13 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
14 |
Y |
Y |
Y |
P |
|
|
|
DB1 |
20 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
"11 x 90mm cutout |
Y |
22 x 28W T5 Twin Batten |
Y |
2 x 36W T8 Twin batten |
Y |
52 x Circular Induction Hi-bay (200W estimate) |
Y |
12 x Square Surface Mount Hi-bay (250W estimate) |
Y |
1 x 28W T5 Single Batten |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Red emergency stickers |
Switchboard |
All |
Missing |
N |
N |
N |
Will be applied to switchboard upon next visit |
Damaged mounting block |
BOH and fridges |
2 |
Mounting blocks damaged |
N |
N |
N |
Clipsal 238. If repairs are required, please send through work request |
Emergency lights |
Store |
All |
Missing numbering |
N |
N |
N |
Repairs added to the fortnightly summary report |
Strip light |
TV wall |
1 |
Faulty driver |
N |
N |
N |
If repairs are required, please send through work request |
Light boxes |
Wall bays |
50% |
Faulty |
N |
N |
N |
Repairs added to the fortnightly summary report |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 11/02/2022 |
---|
| |
---|
| |