Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 17/08/2021 |
---|
Technician's Name | Bayley Woodroffe |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 58144 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | joondalup |
---|
|
|
---|
Location Name | Joondalup |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 01 |
1R |
Y |
P |
|
|
|
1W |
Y |
P |
|
|
|
1B |
Y |
P |
|
|
|
3R |
Y |
P |
|
|
|
3W |
Y |
P |
|
|
|
3B |
Y |
P |
|
|
|
5R |
Y |
P |
|
|
|
5W |
Y |
P |
|
|
|
5B |
Y |
P |
|
|
|
7R |
Y |
P |
|
|
|
7W |
Y |
P |
|
|
|
7B |
Y |
P |
|
|
|
9R |
Y |
P |
|
|
|
9W |
Y |
P |
|
|
|
9B |
Y |
P |
|
|
|
11R |
Y |
P |
|
|
|
11W |
Y |
P |
|
|
|
11B |
Y |
P |
|
|
|
13R |
Y |
P |
|
|
|
13W |
Y |
P |
|
|
|
13B |
Y |
P |
|
|
|
15R |
Y |
P |
|
|
|
15W |
Y |
P |
|
|
|
15B |
Y |
P |
|
|
|
17R |
Y |
P |
|
|
|
17W |
Y |
P |
|
|
|
17B |
Y |
P |
|
|
|
19R |
Y |
P |
|
|
|
19W |
Y |
P |
|
|
|
19B |
Y |
P |
|
|
|
21R |
Y |
P |
|
|
|
21W |
Y |
P |
|
|
|
21B |
Y |
P |
|
|
|
23W |
Y |
P |
|
|
|
23B |
Y |
P |
|
|
|
R2 |
Y |
P |
|
|
|
W2 |
Y |
P |
|
|
|
B2 |
Y |
P |
|
|
|
4R |
Y |
P |
|
|
|
4W |
Y |
P |
|
|
|
4B |
Y |
P |
|
|
|
6R |
Y |
P |
|
|
|
6W |
Y |
P |
|
|
|
6B |
Y |
P |
|
|
|
8R |
Y |
P |
|
|
|
8W |
Y |
P |
|
|
|
8B |
Y |
P |
|
|
|
10R |
Y |
P |
|
|
|
10W |
Y |
P |
|
|
|
10B |
Y |
P |
|
|
|
12R |
Y |
P |
|
|
|
12W |
Y |
P |
|
|
|
12B |
Y |
P |
|
|
|
14R |
Y |
P |
|
|
|
14W |
Y |
P |
|
|
|
14B |
Y |
P |
|
|
|
16R |
Y |
P |
|
|
|
16W |
Y |
P |
|
|
|
16B |
Y |
P |
|
|
|
18R |
Y |
P |
|
|
|
18W |
Y |
P |
|
|
|
18B |
Y |
P |
|
|
|
20R |
Y |
P |
|
|
|
20W |
Y |
P |
|
|
|
20B |
Y |
P |
|
|
|
22R |
Y |
P |
|
|
|
22W |
Y |
P |
|
|
|
24RWB |
Y |
P |
|
|
|
26W |
Y |
P |
|
|
|
26B |
Y |
P |
|
|
MECH DB |
11 |
Y |
P |
|
|
|
37 |
Y |
P |
|
|
|
39 |
Y |
P |
|
|
|
41 |
Y |
P |
|
|
SUB DB |
1R |
Y |
P |
|
|
|
1W |
Y |
P |
|
|
|
1B |
Y |
P |
|
|
|
3R |
Y |
P |
|
|
|
3W |
Y |
P |
|
|
|
3B |
Y |
P |
|
|
|
5R |
Y |
P |
|
|
|
5W |
Y |
P |
|
|
|
5B |
Y |
P |
|
|
|
7R |
Y |
P |
|
|
|
7W |
Y |
P |
|
|
|
7B |
Y |
P |
|
|
|
9R |
Y |
P |
|
|
|
2W |
Y |
P |
|
|
|
2B |
Y |
P |
|
|
|
4R |
Y |
P |
|
|
|
4W |
Y |
P |
|
|
|
4B |
Y |
P |
|
|
|
6R |
Y |
P |
|
|
|
6W |
Y |
P |
|
|
|
6B |
Y |
P |
|
|
|
8R |
Y |
P |
|
|
|
8W |
Y |
P |
|
|
|
8B |
Y |
P |
|
|
|
10R |
Y |
P |
|
|
|
10W |
Y |
P |
|
|
|
10B |
Y |
P |
|
|
|
12R |
Y |
P |
|
|
|
12W |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
22 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
27 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
Sub board 1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
10 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
21 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
24 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
25 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
30 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
31 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
32 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
33 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
34 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
35 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
36 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
37 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
38 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
39 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
40 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
41 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
Jumbo exit |
Y |
400w defused low bay |
Y |
Exit |
Y |
2 by 28w defused emergency batten |
Y |
1 by 28w defused batten |
Y |
2 by 28w defused batten |
Y |
LED down light |
Y |
LED rectangular shop light |
Y |
LED strip lights - track lighting |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 17/02/2022 |
---|
| |
---|
| |