Partner NameTransit Electrical Pty Ltd
StateWA
Date of Visit19/08/2021
Technician's NameBayley Woodroffe
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number58143
EmailEmail hidden; Javascript is required.
The Good Guys Site in WAcannington

Location NameCannington
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB01 1W Y P
1B Y P
3R Y P
3W Y P
3B Y P
5R Y P
5W Y P
5B Y P
7R Y P
7W Y P
7B Y P
9R Y P
9W Y P
9B Y P
13R Y P
13W Y P
13B Y P
15R Y P
17R Y P
19W Y P
21B Y P
23R Y P
23W Y P
2W Y P
2B Y P
4R Y P
4W Y P
4B Y P
6R Y P
6W Y P
6B Y P
18R Y P
18W Y P
18B Y P
20R Y P
20W Y P
20B Y P
22R Y P
22W Y P
22B Y P
24R Y P
26RWB Y P
DB03 1 Y P
3 Y P
5 Y P
7 Y P
8 Y P
9 Y P
10 Y P
11 Y P
12 Y P
13 Y P
14 Y P
16 Y P
18 Y P
19 Y P
20 Y P
21 Y P
22 Y P
23 Y P
24 Y P
25 Y P
26 Y P
27 Y P
28 Y P
29 Y P
30 Y P
31 Y P
32 Y P
33 Y P
34 Y P
35 Y P
36 Y P
37 Y P
38 Y P
39 Y P
40 Y P
41 Y P
42 Y P
43 Y P
44 Y P
45 Y P
46 Y P
47 Y P
48 Y P
50 Y P
52 Y P
54 Y P
56 Y P
58 Y P
60 Y P
SDB4/1 1 Y P
2 Y P
3 Y P
4 Y P
5 Y P
6 Y P
7 Y P
8 Y P
10 Y P
11 Y P
12 Y P
13 Y P
14 Y P
16 Y P
17 Y P
18 Y P
19 Y P
22 Y P
29 Y P
46 Y P
48 Y P
SDB4/2 1R Y P
1W Y P
1B Y P
3R Y P
3W Y P
3B Y P
5R Y P
5W Y P
5B Y P
7R Y P
7W Y P
7B Y P
9R Y P
9W Y P
9B Y P
11R Y P
2R Y P
2W Y P
2B Y P
4R Y P
4W Y P
4B Y P
6R Y P
6W Y P
6B Y P
8R Y P
8W Y P
8B Y P
10R Y P
10W Y P
10B Y P
12R Y P
12B Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
SDB 04 - 1 2 R Y Y Y P
SDB 04 - 1 5 R Y Y Y P
SDB 04 - 1 6 R Y Y Y P
SDB 04 - 1 7 R Y Y Y P
DB 01 8 S Y Y Y P
SDB 04 - 1 11 R Y Y Y P
DB 01 13 S Y Y Y P
DB 01 19 S Y Y Y P
DB 01 20 S Y Y Y P
DB 01 24 S Y Y Y P
DB 01 25 S Y Y Y P
DB 01 30 R Y Y Y P
DB 01 31 R Y Y Y P
DB 01 32 R Y Y Y P
DB 01 33 R Y Y Y P
DB 01 34 R Y Y Y P
DB 01 36 S Y Y Y P
DB 01 37 S Y Y Y P
DB 01 38 S Y Y Y P
DB 03 41 R Y Y Y P
DB 03 42 R Y Y Y P
DB 03 45 R Y Y Y P
DB 03 46 R Y Y Y P
DB 03 48 R Y Y Y P
DB 03 49 R Y Y Y P
DB 03 50 R Y Y Y P
DB 03 51 R Y Y Y P
DB 03 53 S - led batten em Y Y Y P
DB 03 54 S - led batten em Y Y Y P
DB 03 55 R Y Y Y P
DB 03 57 R Y Y Y P
DB 03 58 S - Single fluoro Y Y Y P
DB03 59 S - led batten em Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
SDB04 - 1 1 Y Y Y P
SDB04 - 1 3 Y Y Y P
SDB04 - 1 4 Y Y Y P
SDB04 - 1 10 Y N Y F Battery failed test Y N
SDB04 - 1 12 Y Y Y P
SDB01 14 Y Y Y P
DB01 15 Y Y Y P
DB01 16 Y Y Y P
DB01 17 Y Y Y P
DB01 18 Y Y Y P
DB01 21 Y Y Y P
DB01 22 Y Y Y P
DB01 23 Y Y Y P
DB01 26 Y Y Y P
DB01 27 Y Y Y P
DB01 28 Y Y Y P
DB01 29 Y Y Y P
DB01 35 Y Y Y P
DB01 39 Y Y Y P
DB01 40 Y Y Y P
DB03 43 Y Y Y P
DB03 44 Y Y Y P
DB03 47 Y Y Y P
DB03 52 Y Y Y P
DB01 59 Y Y Y P
DB03 60 Y Y Y P
DB03 61 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED Flood light Y
LED Hibay Y
LED Downlights Y
LED Emergency Spitfire Y
Dual LED Emergency Surface mount Y
Exits Y
Par 38 Spots Y
Par 38 Recessed lights Y
150w MH Shoplights Y
1 by 36w Defused battens Y
1 by 36w Emergency Defused battens Y
2 by 18w Defused battens Y
LED Battens Y
LED Battens Emergency Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
DB 01 Chassis 2 legend BOH 1 SB Legend from DB01 Chassis 2 is missing N N TBA Quote recommendation listed on fortnightly report
Exit light #10 Front Entry 1 Failed test Y N N
LED Downlight TVs 2 Flashing Y N N
Site Status SelectorStore now fully compliant
Next Test Due in 6 months19/02/2022