Partner NameSturdie Trade Services
StateQLD
Date of Visit25/08/2021
Technician's NameBen McDowell
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number58711
EmailEmail hidden; Javascript is required.
The Good Guys Site in QLDcairns

Location NameCairns
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Db-1 1 Y P
Db-1 2 Y P
D-1 3 Y P
DB-1 4 Y P
Db-1 5 Y P
Db-1 6 Y P
Db-1 7 Y P
Db-1 22 Y P
Db-1 23 Y P
Db-1 24 Y P
DB-1 25 Y P
Db-1 26 Y P
Db-1 27 Y P
Db-1 28 Y P
Db-1 34 Y P
Db-1 35 Y P
Db-1 58 Y P
Db-1 59 Y P
Db-1 63 Y P
Db-1 64 Y P
Db-1 65 Y P
Db-sr2 2 Y P
Db-sr2 4 Y P
Db-sr2 6 Y P
Db-sr2 8 Y P
Db-sr2 10 Y P
Db-sr2 11 Y P
Db-sr2 12 Y P
Db-sr2 13 Y P
Db-sr2 14 Y P
Db-sr2 15 Y P
Db-sr2 17 Y P
Db-sr2 17 Y P
Db-sr2 20 Y P
DBx 1 Y P
DBx 2 Y P
DBx 3 Y P
DBx 4 Y P
DBx 5 Y P
DBx 6 Y P
DBx 7 Y P
DBx 8 Y P
DBx 9 Y P
DBx 10 Y P
DBx 11 Y P
DBx 12 Y P
DBx 13 Y P
DBx 14 Y P
DBx 15 Y P
DBx 16 Y P
DBx 17 Y P
DBx 18 Y P
DBx 19 Y P
DBx 20 Y P
DBx 21 Y P
DBx 22 Y P
DBx 23 Y P
DBx 24 Y P
DBx 25 Y P
DBx 26 Y P
DBx 27 Y P
DBx 28 Y P
DBx 29 Y P
DBx 30 Y P
DBx 31 Y P
DBx 32 Y P
DBx 33 Y P
DBx 34 Y F Faulty RCBO Y
DBx-2 1 Y P
DBx-2 2 Y P
DBx-2 3 Y P
DBx-2 4 Y P
DBx-2 5 Y P
DBx-2 6 Y P
DBx-2 7 Y P
DBx-2 8 Y P
DBx-2 9 Y P
DBx-2 10 Y P
DBx-2 11 Y P
DBx-2 12 Y P
DBx-2 13 Y P
DBx-2 14 Y P
DBx-2 15 Y P
DBx-2 16 Y P
DBx-2 17 Y P
DBx-2 18 Y P
DBx-2 19 Y P
DBx-2 20 Y P
DBx-2 21 Y P
DBx-2 22 Y P
DBx-2 23 Y P
DBx-2 24 Y P
Db-5 4 Y P
Db-5 5 Y P
Db-5 6 Y P
Db-5 7 Y P
Db-5 8 Y P
Db-5 13 Y P
Db-5 14 Y P
Db-5 15 Y P
Db-5 16 Y P
Db-5 17 Y P
Db-5 18 Y P
Db-5 19 Y P
Db-5 20 Y P
Db-5 21 Y P
Db-5 22 Y P
Db-5 23 Y P
Db-5 24 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 R Y Y Y P
2 R Y Y Y P
3 R Y Y Y P
4 S Y Y Y P
5 R Y Y Y P
6 R Y Y Y P
7 R Y Y Y P
8 R Y Y Y P
9 R Y Y Y P
10 R Y Y Y P
11 R Y Y Y P
12 R Y Y Y P
13 R Y Y Y P
14 R Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
17 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
20 R Y Y Y P
21 S Y Y Y P
22 R Y Y Y P
23 R Y Y Y P
24 R Y Y Y P
25 S Y Y Y P
26 S Y Y Y P
27 S Y Y Y P
28 S Y Y Y P
29 S Y Y Y P
30 S Y Y Y P
31 R Y Y Y P
32 R Y Y Y P
33 R Y Y Y P
34 R Y Y Y P
35 R Y Y Y P
36 R Y Y Y P
37 R Y Y Y P
38 R Y Y Y P
60 R Y Y Y P
61 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 40 Y Y Y P
41 Y Y Y P
42 Y Y Y P
43 Y Y Y P
44 Y Y Y P
45 Y Y Y P
46 Y Y Y P
47 Y Y Y P
48 Y N N F Damaged Fitting Y N
49 Y Y Y P
50 Y Y Y P
51 Y Y Y P
52 Y Y Y P
53 Y Y Y P
54 Y Y Y P
55 Y Y Y P
56 Y Y Y P
57 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Double 2ft Fluro Y
Down lights LED & Diachronic Y
Down lights - small display Y
Panel lights - LED Y
Square lights (Showroom trading lights) Y
4ft Fluro Y
Metal Halide Y
LED strip lighting - displays CFL's Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
RCD DBX 1 Faulty RCBO Y N N Replaced with new
Exit Light TV Area 1 Damaged Y N N Replaced with new
Site Status SelectorQLD - Maintenance has been completed in accordance to ASS2293.2 and QD MP6.1. - Store now fully compliant
Next Test Due in 6 months25/02/2022