Partner NameRodda Electrical
StateSA
Date of Visit14/09/2021
Technician's NameMatt Rodda
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number58471
EmailEmail hidden; Javascript is required.
The Good Guys Site in SAmarion

Location NameMarion
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB.T3-2 R11 Y P
W11 Y P
B11 Y P
R8 Y P
W8 Y P
B8 Y P
R10 Y P
W10 Y P
B10 Y P
R12 Y P
W12 Y P
B12 Y P
R14 Y P
W14 Y P
B14 Y P
W16 Y P
B16 Y P
R18 Y P
W18 Y P
DB.T2-3 R9 Y P
W9 Y P
B9 Y P
R11 Y P
W11 Y P
B11 Y P
R13 Y P
W17 Y P
B17 Y P
R19 Y P
DB.T2-2 R1 Y P
W1 Y P
B1 Y P
R3 Y P
B3 Y P
R21 Y P
W21 Y P
B21 Y P
R22 Y P
W22 Y P
B22 Y P
R23 Y P
W23 Y P
B23 Y P
R24 Y P
W24 Y P
B24 Y P
R25 Y P
R26 Y P
W26 Y P
R27 Y P
W27 Y P
B27 Y P
R28 Y P
W28 Y P
B28 Y P
R29 Y P
R30 Y P
W30 Y P
B30 Y P
RWB31 Y P
R32 Y P
MDB T3 R5 Y P
W5 Y P
B5 Y P
R6 Y P
R19 Y P
W19 Y P
B19 Y P
R20 Y P
W20 Y P
B20 Y P
R21 Y P
W21 Y P
B21 Y P
R22 Y P
W22 Y P
B22 Y P
R23 Y P
W23 Y P
R25 Y P
W25 Y P
R26 Y P
W26 Y P
B26 Y P
R28 Y P
W28 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 S Y Y Y P
2 S Y Y Y P
3 S Y Y Y P
4 S Y Y Y P
5 S Y Y Y P
6 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
10 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
13 S Y Y Y P
14 S Y Y Y P
15 R Y Y Y P
16 R Y Y Y P
17 R Y Y Y P
18 R Y Y Y P
19 R Y Y Y P
20 R Y Y Y P
21 S Y Y Y P
Above dyson S N N N F Not illuminating Y N
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Batten light Office near counter 1 Not Illuminated Y N N Replaced with new fitting.
T28 Lock up room light 2 Lamps Not Illuminated Y N N Replaced with new lamp.
T28 Heating and cooling 2 Lamps Not Illuminated Y N N Replaced with new lamp. Lift Required.
T28 Warehouse office 2 Lamps Not Illuminated Y N N Replaced with new lamp
120w Surface Mounted Canopy Light Warehouse main walkway 1 Not Illuminated Y N N Replaced with new fitting. Vertical lift was required
Emergency light Above dyson 1 Not working Y N N Replaced with surface mount Emergency light. Vertical lift was required.
EM/EXIT lighting plan Office 1 Logbook could not be located Y N N New folder posted to store.
Site Status SelectorStore now fully compliant
Next Test Due in 6 months15/03/2022