Partner Name | Sturdie Trade Services |
---|
State | VIC |
---|
Date of Visit | 01/10/2021 |
---|
Technician's Name | Nathan McBain |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 57717 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in VIC | essendon |
---|
|
|
---|
Location Name | ESSENDON |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1-2 |
01 |
Y |
P |
|
|
DB1-2 |
02 |
Y |
P |
|
|
DB1-2 |
03 |
Y |
P |
|
|
DB1-2 |
04 |
Y |
P |
|
|
DB1-2 |
05 |
Y |
P |
|
|
DB1-2 |
06 |
Y |
P |
|
|
DB1-2 |
07 |
Y |
P |
|
|
DB1-2 |
08 |
Y |
P |
|
|
DB1-2 |
09 |
Y |
P |
|
|
DB1-2 |
10 |
Y |
P |
|
|
DB1-2 |
11 |
Y |
P |
|
|
DB1-2 |
12 |
Y |
P |
|
|
DB1-2 |
13 |
Y |
P |
|
|
DB1-2 |
14 |
Y |
P |
|
|
DB1-2 |
17 |
Y |
P |
|
|
DB1-2 |
18 |
Y |
P |
|
|
DB1-2 |
22 |
Y |
P |
|
|
DB1-2 |
23 |
Y |
P |
|
|
DB1-2 |
24 |
Y |
P |
|
|
DB1-2 |
25 |
Y |
P |
|
|
DB1-2 |
27 |
Y |
P |
|
|
DB1-2 |
29 |
Y |
P |
|
|
DB1-2 |
31 |
Y |
P |
|
|
DB1-2 |
32 |
Y |
P |
|
|
DB1-2 |
34 |
Y |
P |
|
|
DB1-2 |
36 |
Y |
P |
|
|
DB1-2 |
38 |
Y |
P |
|
|
DB1-2 |
40 |
Y |
P |
|
|
DB T - 01 |
02 |
Y |
P |
|
|
DB T - 01 |
04 |
Y |
P |
|
|
DB T - 01 |
06 |
Y |
P |
|
|
DB T - 01 |
08 |
Y |
P |
|
|
DB T - 01 |
10 |
Y |
P |
|
|
DB T - 01 |
12 |
Y |
P |
|
|
DB T - 01 |
14 |
Y |
P |
|
|
DB T - 01 |
16 |
Y |
P |
|
|
DB T - 01 |
18 |
Y |
P |
|
|
DB T - 01 |
20 |
Y |
P |
|
|
DB T - 01 |
22 |
Y |
P |
|
|
DB T - 01 |
24 |
Y |
P |
|
|
DB T - 01 |
26 |
Y |
P |
|
|
DB T - 01 |
28 |
Y |
P |
|
|
DB T - 01 |
30 |
Y |
P |
|
|
DB T - 01 |
32 |
Y |
P |
|
|
DB T - 01 |
34 |
Y |
P |
|
|
DB T - 01 |
36 |
Y |
P |
|
|
DB T - 01 |
38 |
Y |
P |
|
|
DB T - 01 |
40 |
Y |
P |
|
|
DB T - 01 |
42 |
Y |
P |
|
|
DB T - 01 |
44 |
Y |
P |
|
|
DB T - 01 |
46 |
Y |
P |
|
|
DB T - 01 |
48 |
Y |
P |
|
|
DB T - 01 |
50 |
Y |
P |
|
|
DB T - 01 |
83 |
Y |
P |
|
|
DB T - 01 |
84 |
Y |
P |
|
|
DB1 - 1 |
01 |
Y |
P |
|
|
DB1 - 1 |
02 |
Y |
P |
|
|
DB1 - 1 |
03 |
Y |
P |
|
|
DB1 - 1 |
04 |
Y |
P |
|
|
DB1 - 1 |
05 |
Y |
P |
|
|
DB1 - 1 |
09 |
Y |
P |
|
|
DB1 - 1 |
10 |
Y |
P |
|
|
DB1 - 1 |
11 |
Y |
P |
|
|
DB1 - 1 |
13 |
Y |
P |
|
|
DB1 - 1 |
14 |
Y |
P |
|
|
DB1 - 1 |
15 |
Y |
P |
|
|
DB1 - 1 |
16 |
Y |
P |
|
|
DB1 - 1 |
17 |
Y |
P |
|
|
DB1 - 1 |
18 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-1/1 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
10 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
12 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
14 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
15 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
16 |
S |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
21 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB-1/1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
2 |
Y |
N |
Y |
F |
FAILED BATTERY TEST |
Y |
N |
DB-1/1 |
3 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
4 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
5 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
6 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
7 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
8 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
9 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
10 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB-1/1 |
12 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
High-Bay Lights |
Y |
Square High-Bay Lights |
Y |
LED Downlights |
Y |
Twin Fluorescent Lights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | Yes |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
DAVIS HIGHBAY |
BOH NEAR DB |
1 |
FAILED TO ILLUMINATE |
DAVIS |
|
Y |
REPLACED WITH NEW |
DAVIS HIGHBAY |
SHOP FLOOR BETWEEN TVS AND DYSON DISPLAY |
1 |
FAILED TO ILLUMINATE |
DAVIS |
|
Y |
REPLACED WITH NEW |
DAVIS HIGHBAY |
FRIDGES ABOVE SAT COUNTER |
1 |
FAILED TO ILLUMINATE |
DAVIS |
|
Y |
REPLACED WITH NEW |
DAVIS HIGHBAY |
KINSMAN DISPLAY |
1 |
FAILED TO ILLUMINATE/DIM |
DAVIS |
|
Y |
REPLACED WITH NEW |
DAVIS HIGHBAY |
MIELE WASHING MACHINES |
1 |
FAILED TO ILLUMINATE/DIM |
DAVIS |
|
Y |
REPLACED WITH NEW |
|
---|
Geotag photo(s) | - Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
|
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
TEST AND TAG |
STORE |
80+ |
TEST AND TAG INDATE, NECT TEST DUE 13 JAN 2022 |
N |
N |
N |
OBSERVATION |
KINSMAN DISPLAY LIGHTING |
PENDANTS |
5 |
FAILED TO ILLUMINATE |
Y |
N |
N |
REPLACED 2 X 10W LAMPS AND 3 X 4W LAMPS |
EX02 |
BOH |
1 |
FAILED BATTERY TEST |
Y |
N |
N |
REPLACED WITH NEW |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 01/04/2022 |
---|
| |
---|
| |