State | WA |
---|
Date of Visit | 19/10/2021 |
---|
Technician's Name | James Patterson |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 58149 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | osborne_park |
---|
|
|
---|
Location Name | Osborne Park |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB-T1 |
R11 |
Y |
P |
|
|
DB-T1 |
W11 |
Y |
P |
|
|
DB-T1 |
B11 |
Y |
P |
|
|
DB-T1 |
R12 |
Y |
P |
|
|
DB-T1 |
W12 |
Y |
P |
|
|
DB-T1 |
B12 |
Y |
P |
|
|
DB-T1 |
R13 |
Y |
P |
|
|
DB-T1 |
W13 |
Y |
P |
|
|
DB-T1 |
B13 |
Y |
P |
|
|
DB-T1 |
R14 |
Y |
P |
|
|
DB-T1 |
W14 |
Y |
P |
|
|
DB-T1 |
B14 |
Y |
P |
|
|
DB-T1 |
R15 |
Y |
P |
|
|
DB-T1 |
W15 |
Y |
P |
|
|
DB-T1 |
B15 |
Y |
P |
|
|
DB-T1 |
R16 |
Y |
P |
|
|
DB-T1 |
W16 |
Y |
P |
|
|
DB-T1 |
B16 |
Y |
P |
|
|
DB-T1 |
R17 |
Y |
P |
|
|
DB-T1 |
W17 |
Y |
P |
|
|
DB-T1 |
B17 |
Y |
P |
|
|
DB-T1 |
R18 |
Y |
P |
|
|
DB-T1 |
W18 |
Y |
P |
|
|
DB-T1 |
B18 |
Y |
P |
|
|
DB-T1 |
R19 |
Y |
P |
|
|
DB-T1 |
W19 |
Y |
P |
|
|
DB-01 |
R1 |
Y |
P |
|
|
DB-01 |
W1 |
Y |
P |
|
|
DB-01 |
B1 |
Y |
P |
|
|
DB-01 |
R2 |
Y |
P |
|
|
DB-01 |
W2 |
Y |
P |
|
|
DB-01 |
B2 |
Y |
P |
|
|
DB-01 |
R4 |
Y |
P |
|
|
DB-01 |
W4 |
Y |
P |
|
|
DB-01 |
B4 |
Y |
P |
|
|
DB-01 |
R5 |
Y |
P |
|
|
DB-01 |
W5 |
Y |
P |
|
|
DB-01 |
B5 |
Y |
P |
|
|
DB-01 |
R6 |
Y |
P |
|
|
DB-01 |
W6 |
Y |
P |
|
|
DB-01 |
B6 |
Y |
P |
|
|
DB-01 |
R7 |
Y |
P |
|
|
DB-01 |
R8 |
Y |
P |
|
|
DB-01 |
W8 |
Y |
P |
|
|
DB-01 |
B8 |
Y |
P |
|
|
DB-01 |
R10 |
Y |
P |
|
|
DB-01 |
W10 |
Y |
P |
|
|
DB-01 |
B10 |
Y |
P |
|
|
DB-01 |
R12 |
Y |
P |
|
|
DB-01 |
W12 |
Y |
P |
|
|
DB-01 |
B12 |
Y |
P |
|
|
DB-02 |
R2 |
Y |
P |
|
|
DB-02 |
W2 |
Y |
P |
|
|
DB-02 |
B2 |
Y |
P |
|
|
DB-02 |
W3 |
Y |
P |
|
|
DB-02 |
B3 |
Y |
P |
|
|
DB-02 |
R4 |
Y |
P |
|
|
DB-02 |
W4 |
Y |
P |
|
|
DB-02 |
B4 |
Y |
P |
|
|
DB-02 |
R5 |
Y |
P |
|
|
DB-02 |
B5 |
Y |
P |
|
|
DB-02 |
R6 |
Y |
P |
|
|
DB-02 |
W6 |
Y |
P |
|
|
DB-02 |
B6 |
Y |
P |
|
|
DB-02 |
R8 |
Y |
P |
|
|
DB-02 |
W8 |
Y |
P |
|
|
DB-02 |
B8 |
Y |
P |
|
|
DB-02 |
W9 |
Y |
P |
|
|
DB-02 |
R10 |
Y |
P |
|
|
DB-02 |
W10 |
Y |
P |
|
|
DB-02 |
B10 |
Y |
P |
|
|
DB-02 |
W13 |
Y |
P |
|
|
DB-02 |
B13 |
Y |
P |
|
|
DB-02 |
R14 |
Y |
P |
|
|
DB-02 |
W14 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DBT1 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
R |
Y |
Y |
Y |
P |
|
|
|
|
15 |
R |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S-2by36w batten |
Y |
Y |
Y |
P |
|
|
|
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
30 |
R |
Y |
Y |
Y |
P |
|
|
|
|
32 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DBT1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
18 |
Y |
Y |
Y |
P |
|
|
|
|
23 |
Y |
Y |
Y |
P |
|
|
|
|
24 |
Y |
Y |
Y |
P |
|
|
|
|
28 |
Y |
Y |
Y |
P |
|
|
|
|
31 |
Y |
Y |
Y |
P |
|
|
|
|
33 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
400W HiBay Lights |
Y |
16by18w Lights |
Y |
Oyster Lights |
Y |
LED DAVISs Batten |
Y |
LED Downlights |
Y |
Exit Stanilite |
Y |
Jumbo Exit Stanilite |
Y |
Recessed Emergency Light - Stanilite |
Y |
Surface Mount Emergency Light - Stanilite |
Y |
LED Weatherproof Batten |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Emergency Light Upgrade Recommended |
Store |
Throughout store |
Not enough emergency lights throughout the store |
N |
N |
N |
Quote recommendation listed on fortnightly report |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 19/04/2022 |
---|
| |
---|
| |