Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 01/11/2021 |
---|
Technician's Name | James Patterson |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 58147 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | malaga |
---|
|
|
---|
Location Name | Malaga |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 1 |
W3 |
Y |
P |
|
|
DB 1 |
B3 |
Y |
P |
|
|
DB 1 |
B6 |
Y |
P |
|
|
DB 1 |
R7 |
Y |
P |
|
|
DB 1 |
B8 |
Y |
P |
|
|
DB 1 |
R9 |
Y |
P |
|
|
DB 1 |
W9 |
Y |
P |
|
|
DB 1 |
R10 |
Y |
p |
|
|
DB 1 |
W10 |
Y |
P |
|
|
DB 1 |
B10 |
Y |
P |
|
|
DB 1 |
R11 |
Y |
P |
|
|
DB 1 |
W11 |
Y |
P |
|
|
DB 1 |
B11 |
Y |
P |
|
|
DB 1 |
R12 |
Y |
P |
|
|
DB 1 |
W12 |
Y |
P |
|
|
DB 1 |
B12 |
Y |
P |
|
|
DB 1 |
R13 |
Y |
P |
|
|
DB 1 |
B13 |
Y |
P |
|
|
DB 1 |
R15 |
Y |
P |
|
|
DB 1 |
W15 |
Y |
P |
|
|
DB 1 |
R19 |
Y |
P |
|
|
DB 1 |
W19 |
Y |
P |
|
|
DB 1 |
W20 |
Y |
P |
|
|
DB 1 |
B20 |
Y |
P |
|
|
DB 1 |
R23 |
Y |
P |
|
|
DB 1 |
W23 |
Y |
P |
|
|
DB 1 |
W24 |
Y |
P |
|
|
DB 1 |
B24 |
Y |
P |
|
|
DB 1 |
R27 |
Y |
P |
|
|
DB 1 |
RWB28 |
Y |
P |
|
|
DB 1 |
R30 |
Y |
P |
|
|
DB 1 |
B30 |
Y |
P |
|
|
DB 1 |
R31 |
Y |
P |
|
|
DB 1 |
B31 |
Y |
P |
|
|
DB 1 |
R32 |
Y |
P |
|
|
DB 1 |
W32 |
Y |
P |
|
|
DB 1 |
B32 |
Y |
P |
|
|
DB 1 |
R33 |
Y |
P |
|
|
DB 1 |
W33 |
Y |
P |
|
|
DB 1 |
B33 |
Y |
P |
|
|
DB 1 |
R34 |
Y |
P |
|
|
DB 1 |
W34 |
Y |
P |
|
|
DB 1 |
B34 |
Y |
P |
|
|
DB 1A CH 1 |
R1 |
Y |
P |
|
|
DB 1A CH 1 |
B1 |
Y |
P |
|
|
DB 1A CH 1 |
R2 |
Y |
P |
|
|
DB 1A CH 1 |
W2 |
Y |
P |
|
|
DB 1A CH 1 |
R3 |
Y |
P |
|
|
DB 1A CH 1 |
RWB11 |
Y |
P |
|
|
DB 1A CH 2 |
W3 |
Y |
P |
|
|
DB 1A CH 2 |
B3 |
Y |
P |
|
|
DB 1A CH 2 |
R5 |
Y |
P |
|
|
DB 1A CH 2 |
W5 |
Y |
P |
|
|
DB 1A CH 2 |
B5 |
Y |
P |
|
|
DB 1A CH 2 |
R6 |
Y |
P |
|
|
DB 1A CH 2 |
W6 |
Y |
P |
|
|
DB 1A CH 2 |
B6 |
Y |
P |
|
|
DB 1A CH 2 |
R7 |
Y |
P |
|
|
DB 1A CH 2 |
W7 |
Y |
P |
|
|
DB 1A CH 2 |
B7 |
Y |
P |
|
|
DB 1A CH 2 |
R8 |
Y |
P |
|
|
DB 1A CH 2 |
W8 |
Y |
P |
|
|
DB 1A CH 2 |
B8 |
Y |
P |
|
|
DB 1A CH 2 |
R9 |
Y |
P |
|
|
DB 1A CH 2 |
W9 |
Y |
P |
|
|
DB 1A CH 2 |
B9 |
Y |
P |
|
|
DB 1A CH 2 |
R10 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 1 |
2 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
10 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
11 |
Twin tubed batten |
Y |
N |
Y |
F |
Failed Battery Test |
Y |
N |
DB 1 |
12 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
22 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
23 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 1A |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 1 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 1 |
16 |
Y |
Y |
Y |
P |
|
|
|
DB 2 |
18 |
Y |
Y |
Y |
P |
|
|
|
DB 2 |
21 |
Y |
Y |
Y |
P |
|
|
|
DB 2 |
22 |
Y |
Y |
Y |
P |
|
|
|
DB 2 |
26 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
400w low bay |
Y |
400w low bay defused |
Y |
1 by 36w defused battens |
Y |
40w oyster light |
Y |
50w 12v down lights |
Y |
DAVIS LED batten |
Y |
400w hibay |
Y |
Exit |
Y |
Emergency spitfire |
Y |
Emergency 2 by 36w |
Y |
40w b27 batten globe |
Y |
LED spot lights |
Y |
60w bunker lights |
Y |
Par 38 twin spots |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Emergency Light # 11 |
Shop floor |
1 |
Failed battery test |
Y |
N |
N |
Replaced with Surface Mount Emergency Light. Scissor Lift was required |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 01/05/2022 |
---|
| |
---|
| |