Partner NameTransit Electrical Pty Ltd
StateWA
Date of Visit04/11/2021
Technician's NameJames Patterson
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number58153
EmailEmail hidden; Javascript is required.
The Good Guys Site in WAmandurah

Location NameMandurah
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB -T2 TGG chassis R45 Y P
DB -T2 TGG chassis W45 Y P
DB -T2 TGG chassis B45 Y P
DB -T2 TGG chassis R46 Y P
DB -T2 TGG chassis W46 Y P
DB -T2 TGG chassis R47 Y P
DB -T2 TGG chassis W47 Y P
DB -T2 TGG chassis B47 Y P
DB -T2 TGG chassis R48 Y P
DB -T2 TGG chassis W48 Y P
DB -T2 TGG chassis B48 Y P
DB -T2 TGG chassis R49 Y P
DB -T2 TGG chassis W49 Y P
DB -T2 TGG chassis B49 Y P
DB -T2 TGG chassis RWB51 Y P
DB-T2 LT & PWR chassis R1 Y P
DB -T2 TGG chassis W1 Y P
DB -T2 TGG chassis B1 Y P
DB -T2 TGG chassis R2 Y P
DB -T2 TGG chassis W2 Y P
DB -T2 TGG chassis B2 Y P
DB -T2 TGG chassis R3 Y P
DB -T2 TGG chassis W3 Y P
DB -T2 TGG chassis B3 Y P
DB -T2 TGG chassis R4 Y P
DB -T2 TGG chassis W4 Y P
DB -T2 TGG chassis B4 Y P
DB -T2 TGG chassis R5 Y P
DB -T2 TGG chassis W5 Y P
DB -T2 TGG chassis B6 Y P
DB -T2 TGG chassis R6 Y P
DB -T2 TGG chassis W6 Y P
DB -T2 TGG chassis B6 Y P
DB -T2 TGG chassis R7 Y P
DB -T2 TGG chassis R8 Y P
DB -T2 TGG chassis R10 Y P
DB -T2 TGG chassis W10 Y P
DB -T2 TGG chassis B10 Y P
DB -T2 TGG chassis R11 Y P
DB -T2 TGG chassis W11 Y P
DB -T2 TGG chassis B11 Y P
DB -T2 TGG chassis R12 Y P
DB -T2 TGG chassis W12 Y P
DB -T2 TGG chassis B12 Y P
DB -T2 TGG chassis R13 Y P
DB -T2 TGG chassis W13 Y P
DB -T2 TGG chassis B13 Y P
DB -T2 TGG chassis R14 Y P
DB -T2 TGG chassis W14 Y P
DB -T2 TGG chassis B14 Y P
DB -T2 TGG chassis R15 Y P
DB -T2 TGG chassis W15 Y P
DB -T2 TGG chassis B15 Y P
DB -T2 TGG chassis R16 Y P
DB -T2 TGG chassis W16 Y P
DB -T2 TGG chassis B16 Y P
DB -T2 TGG chassis R17 Y P
DB -T2 TGG chassis W17 Y P
DB -T2 TGG chassis B17 Y P
DB -T2 TGG chassis R18 Y P
DB -T2 TGG chassis W18 Y P
DB -T2 TGG chassis B18 Y P
DB -T2 TGG chassis B19 Y P
DB -T2 TGG chassis RWB21 Y P
DB -T2/1 1 Y P
DB -T2/1 2 Y P
DB -T2/1 3 Y P
DB -T2/1 4 Y P
DB -T2/1 5 Y P
DB -T2/1 6 Y P
DB -T2/1 8 Y P
DB -T2/1 9 Y P
DB -T2/1 10 Y P
DB -T2/1 11 Y P
DB -T2/1 12 Y P
DB -T2/1 13 Y P
DB -T2/1 14 Y P
DB -T2/1 15 Y P
DB -T2/1 16 Y P
DB -T2/1 17 Y P
DB -T2/1 18 Y P
DB -T2/1 19 Y P
DB -T2/1 21 Y P
DB -T2/1 23 Y P
DB -T2/1 25 Y P
DB -T2/1 26 Y P
DB -T2/1 27 Y P
DB -T2/1 28 Y P
DB -T2/1 29 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 2 R Y Y Y P
DB 01 4 S Y Y Y P
DB 01 6 S Y Y Y P
DB 01 7 S-2 by 36w batten Y Y Y P
DB 01 9 S Y Y Y P
DB 01 10 S-2 by 36w batten Y Y Y P
DB 01 13 S Y Y Y P
DB 01 14 S-2 by 36w batten Y Y Y P
DB 01 16 R Y Y Y P
DB 01 17 R Y Y Y P
DB 01 18 R Y Y Y P
DB 01 19 R Y Y Y P
DB 01 20 R Y Y Y P
DB 01 21 S Y Y Y P
DB 01 22 S Y Y Y P
DB 01 23 S Y Y Y P
DB 01 24 S Y Y Y P
DB 01 26 S Y Y Y P
DB 01 27 S Y Y Y P
DB 01 28 S Y Y Y P
DB 01 31 R Y Y Y P
DB 01 33 R Y Y Y P
DB 01 35 R Y Y Y P
DB 01 36 R Y Y Y P
DB 01 37 R Y Y Y P
DB 01 38 R Y Y Y P
DB 01 39 R Y Y Y P
DB 01 40 R Y Y Y P
DB 01 41 R Y Y Y P
DB 01 42 R Y Y Y P
DB 01 44 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB 01 1 Y Y Y P
DB 01 3 Y Y Y P
DB 01 5 Y Y Y P
DB 01 8 Y Y Y P
DB 01 11 Y Y Y P
DB 01 12 Y Y Y P
DB 01 15 Y Y Y P
DB 01 25 Y Y Y P
DB 01 29 Y Y Y P
DB 01 30 Y Y Y P
DB 01 32 Y Y Y P
DB 01 34 Y Y Y P
DB 01 43 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
400w hibay Y
400w low bay Y
400w low bay defused Y
LED down lights sal Y
Jumbo exit Y
2 by par 38 spot Y
Oyster light Y
LED oyster light Y
150w round mh shop light Y
Exits Y
2 by 36w defused emergency batten Y
Spitfire emergency Y
DAVIS LED batten Y
Are there any Warranty items needing to be repaired?Yes
WARRANTY
Defect Item Location of Item (on premises) Quantity Details of fault/problem Manufacturer Part Number Repaired on Site Comments
Hibays Shop 2 Faulty DAVIS UFO150E5K3B09 Y Scissor Lift was required
Hibay BOH 1 Faulty DAVIS UFO150E5K3B09 Y Scissor Lift was required
Site Status SelectorStore now fully compliant
Next Test Due in 6 months04/05/2021