Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 04/11/2021 |
---|
Technician's Name | James Patterson |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 58153 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | mandurah |
---|
|
|
---|
Location Name | Mandurah |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB -T2 TGG chassis |
R45 |
Y |
P |
|
|
DB -T2 TGG chassis |
W45 |
Y |
P |
|
|
DB -T2 TGG chassis |
B45 |
Y |
P |
|
|
DB -T2 TGG chassis |
R46 |
Y |
P |
|
|
DB -T2 TGG chassis |
W46 |
Y |
P |
|
|
DB -T2 TGG chassis |
R47 |
Y |
P |
|
|
DB -T2 TGG chassis |
W47 |
Y |
P |
|
|
DB -T2 TGG chassis |
B47 |
Y |
P |
|
|
DB -T2 TGG chassis |
R48 |
Y |
P |
|
|
DB -T2 TGG chassis |
W48 |
Y |
P |
|
|
DB -T2 TGG chassis |
B48 |
Y |
P |
|
|
DB -T2 TGG chassis |
R49 |
Y |
P |
|
|
DB -T2 TGG chassis |
W49 |
Y |
P |
|
|
DB -T2 TGG chassis |
B49 |
Y |
P |
|
|
DB -T2 TGG chassis |
RWB51 |
Y |
P |
|
|
DB-T2 LT & PWR chassis |
R1 |
Y |
P |
|
|
DB -T2 TGG chassis |
W1 |
Y |
P |
|
|
DB -T2 TGG chassis |
B1 |
Y |
P |
|
|
DB -T2 TGG chassis |
R2 |
Y |
P |
|
|
DB -T2 TGG chassis |
W2 |
Y |
P |
|
|
DB -T2 TGG chassis |
B2 |
Y |
P |
|
|
DB -T2 TGG chassis |
R3 |
Y |
P |
|
|
DB -T2 TGG chassis |
W3 |
Y |
P |
|
|
DB -T2 TGG chassis |
B3 |
Y |
P |
|
|
DB -T2 TGG chassis |
R4 |
Y |
P |
|
|
DB -T2 TGG chassis |
W4 |
Y |
P |
|
|
DB -T2 TGG chassis |
B4 |
Y |
P |
|
|
DB -T2 TGG chassis |
R5 |
Y |
P |
|
|
DB -T2 TGG chassis |
W5 |
Y |
P |
|
|
DB -T2 TGG chassis |
B6 |
Y |
P |
|
|
DB -T2 TGG chassis |
R6 |
Y |
P |
|
|
DB -T2 TGG chassis |
W6 |
Y |
P |
|
|
DB -T2 TGG chassis |
B6 |
Y |
P |
|
|
DB -T2 TGG chassis |
R7 |
Y |
P |
|
|
DB -T2 TGG chassis |
R8 |
Y |
P |
|
|
DB -T2 TGG chassis |
R10 |
Y |
P |
|
|
DB -T2 TGG chassis |
W10 |
Y |
P |
|
|
DB -T2 TGG chassis |
B10 |
Y |
P |
|
|
DB -T2 TGG chassis |
R11 |
Y |
P |
|
|
DB -T2 TGG chassis |
W11 |
Y |
P |
|
|
DB -T2 TGG chassis |
B11 |
Y |
P |
|
|
DB -T2 TGG chassis |
R12 |
Y |
P |
|
|
DB -T2 TGG chassis |
W12 |
Y |
P |
|
|
DB -T2 TGG chassis |
B12 |
Y |
P |
|
|
DB -T2 TGG chassis |
R13 |
Y |
P |
|
|
DB -T2 TGG chassis |
W13 |
Y |
P |
|
|
DB -T2 TGG chassis |
B13 |
Y |
P |
|
|
DB -T2 TGG chassis |
R14 |
Y |
P |
|
|
DB -T2 TGG chassis |
W14 |
Y |
P |
|
|
DB -T2 TGG chassis |
B14 |
Y |
P |
|
|
DB -T2 TGG chassis |
R15 |
Y |
P |
|
|
DB -T2 TGG chassis |
W15 |
Y |
P |
|
|
DB -T2 TGG chassis |
B15 |
Y |
P |
|
|
DB -T2 TGG chassis |
R16 |
Y |
P |
|
|
DB -T2 TGG chassis |
W16 |
Y |
P |
|
|
DB -T2 TGG chassis |
B16 |
Y |
P |
|
|
DB -T2 TGG chassis |
R17 |
Y |
P |
|
|
DB -T2 TGG chassis |
W17 |
Y |
P |
|
|
DB -T2 TGG chassis |
B17 |
Y |
P |
|
|
DB -T2 TGG chassis |
R18 |
Y |
P |
|
|
DB -T2 TGG chassis |
W18 |
Y |
P |
|
|
DB -T2 TGG chassis |
B18 |
Y |
P |
|
|
DB -T2 TGG chassis |
B19 |
Y |
P |
|
|
DB -T2 TGG chassis |
RWB21 |
Y |
P |
|
|
DB -T2/1 |
1 |
Y |
P |
|
|
DB -T2/1 |
2 |
Y |
P |
|
|
DB -T2/1 |
3 |
Y |
P |
|
|
DB -T2/1 |
4 |
Y |
P |
|
|
DB -T2/1 |
5 |
Y |
P |
|
|
DB -T2/1 |
6 |
Y |
P |
|
|
DB -T2/1 |
8 |
Y |
P |
|
|
DB -T2/1 |
9 |
Y |
P |
|
|
DB -T2/1 |
10 |
Y |
P |
|
|
DB -T2/1 |
11 |
Y |
P |
|
|
DB -T2/1 |
12 |
Y |
P |
|
|
DB -T2/1 |
13 |
Y |
P |
|
|
DB -T2/1 |
14 |
Y |
P |
|
|
DB -T2/1 |
15 |
Y |
P |
|
|
DB -T2/1 |
16 |
Y |
P |
|
|
DB -T2/1 |
17 |
Y |
P |
|
|
DB -T2/1 |
18 |
Y |
P |
|
|
DB -T2/1 |
19 |
Y |
P |
|
|
DB -T2/1 |
21 |
Y |
P |
|
|
DB -T2/1 |
23 |
Y |
P |
|
|
DB -T2/1 |
25 |
Y |
P |
|
|
DB -T2/1 |
26 |
Y |
P |
|
|
DB -T2/1 |
27 |
Y |
P |
|
|
DB -T2/1 |
28 |
Y |
P |
|
|
DB -T2/1 |
29 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
7 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
10 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
13 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
14 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
21 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
22 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
23 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
26 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
27 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
28 |
S |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
31 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
33 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
35 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
36 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
37 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
38 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
39 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
40 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
41 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
42 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
44 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
3 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
5 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
8 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
12 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
15 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
25 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
29 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
30 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
32 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
34 |
Y |
Y |
Y |
P |
|
|
|
DB 01 |
43 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
400w hibay |
Y |
400w low bay |
Y |
400w low bay defused |
Y |
LED down lights sal |
Y |
Jumbo exit |
Y |
2 by par 38 spot |
Y |
Oyster light |
Y |
LED oyster light |
Y |
150w round mh shop light |
Y |
Exits |
Y |
2 by 36w defused emergency batten |
Y |
Spitfire emergency |
Y |
DAVIS LED batten |
Y |
|
---|
Are there any Warranty items needing to be repaired? | Yes |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
Hibays |
Shop |
2 |
Faulty |
DAVIS |
UFO150E5K3B09 |
Y |
Scissor Lift was required |
Hibay |
BOH |
1 |
Faulty |
DAVIS |
UFO150E5K3B09 |
Y |
Scissor Lift was required |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 04/05/2021 |
---|
| |
---|
| |