| Partner Name | Transit Electrical Pty Ltd |
|---|
| State | WA |
|---|
| Date of Visit | 08/12/2021 |
|---|
| Technician's Name | Daniel Guler |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 58155 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in WA | busselton |
|---|
|
|
|---|
| Location Name | Busselton |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 12 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Initial/12 Months) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB 1 A |
1 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
35 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
| DB 2 B |
4 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
34 |
Y |
P |
|
|
|
36 |
Y |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 02 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
3 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
4 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
5 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
6 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
7 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
8 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
9 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
10 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 02 |
1 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
11 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
13 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
16 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
19 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| 2 by 26w Troffer |
Y |
| 2 by 36w WP Batten |
Y |
| 400w Low Bay |
Y |
| LED Oyster Light |
Y |
| Exit |
Y |
| Emergency Spitfire |
Y |
| 250w MH Hibay |
Y |
| 1 by 36w Bare Batten |
Y |
| 1 by 18w Bare Batten |
Y |
| 1by 30w Bare Batten |
Y |
| 50w Downlights |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| 1 |
In store |
18 |
Droppers not up to standards |
N |
N |
N |
Quote recommendation listed on fortnightly report |
| 2 |
TV racks |
5 |
Multiple power boards connected / daisy chained |
N |
N |
N |
Quote recommendation listed on fortnightly report. OH&S - Too many power boards looped |
| 3 |
Comms Room |
4 |
Need four extra GPO's installed |
Y |
N |
N |
Extra GPO's were required for security panels |
| 4 |
Shop near fridges |
1 |
TBar LED troffer out |
Y |
N |
N |
Located in a very dark corner of the shop. Replaced with new LED panel |
| 5 |
Back of house |
1 |
Broken GPO and falling off wall |
Y |
N |
N |
Replaced GPO with a blank plate |
| 6 |
Switchboard |
8 |
Lights in shop not on RCDs |
N |
N |
N |
Quote recommendation listed on fortnightly report. Replace 8 MCBs with RCDs |
| 7 |
Comms Room |
1 |
Fan making very loud noise |
Y |
N |
N |
Found UPS that was plugged into security panel had failed. Bypassed UPS to stop noise and reported to Manager |
| 8 |
Mobile Plans |
8 |
LED linkable battens not illuminated |
Y |
N |
N |
|
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 08/06/2022 |
|---|
| |
|---|
| |