Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 08/12/2021 |
---|
Technician's Name | Daniel Guler |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 58155 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | busselton |
---|
|
|
---|
Location Name | Busselton |
---|
| |
---|
HTML Block |
|
---|
Test Period | 12 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Initial/12 Months) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 1 A |
1 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
35 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
DB 2 B |
4 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
34 |
Y |
P |
|
|
|
36 |
Y |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 02 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
3 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
4 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
5 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
6 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
7 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
8 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
9 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
10 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 02 |
1 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
11 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
13 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
16 |
Y |
Y |
Y |
P |
|
|
|
DB 02 |
19 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
2 by 26w Troffer |
Y |
2 by 36w WP Batten |
Y |
400w Low Bay |
Y |
LED Oyster Light |
Y |
Exit |
Y |
Emergency Spitfire |
Y |
250w MH Hibay |
Y |
1 by 36w Bare Batten |
Y |
1 by 18w Bare Batten |
Y |
1by 30w Bare Batten |
Y |
50w Downlights |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
1 |
In store |
18 |
Droppers not up to standards |
N |
N |
N |
Quote recommendation listed on fortnightly report |
2 |
TV racks |
5 |
Multiple power boards connected / daisy chained |
N |
N |
N |
Quote recommendation listed on fortnightly report. OH&S - Too many power boards looped |
3 |
Comms Room |
4 |
Need four extra GPO's installed |
Y |
N |
N |
Extra GPO's were required for security panels |
4 |
Shop near fridges |
1 |
TBar LED troffer out |
Y |
N |
N |
Located in a very dark corner of the shop. Replaced with new LED panel |
5 |
Back of house |
1 |
Broken GPO and falling off wall |
Y |
N |
N |
Replaced GPO with a blank plate |
6 |
Switchboard |
8 |
Lights in shop not on RCDs |
N |
N |
N |
Quote recommendation listed on fortnightly report. Replace 8 MCBs with RCDs |
7 |
Comms Room |
1 |
Fan making very loud noise |
Y |
N |
N |
Found UPS that was plugged into security panel had failed. Bypassed UPS to stop noise and reported to Manager |
8 |
Mobile Plans |
8 |
LED linkable battens not illuminated |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 08/06/2022 |
---|
| |
---|
| |