Carry out push button test and record the results below.
RCD Details (Initial/12 Months)
Distribution Board No.
Circuit No.
Push Button (YorN)
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DB1 LP
2
Y
P
4
Y
P
6
Y
P
7 & 9
Y
P
10
Y
P
12
Y
P
14
Y
P
16
Y
P
17
Y
P
18
Y
P
19
Y
P
20
Y
P
21
Y
P
22
Y
P
23
Y
P
24
Y
P
25
Y
P
26
Y
P
27
Y
P
28
Y
P
29
Y
P
30
Y
P
31
Y
P
32
Y
P
33
Y
P
34
Y
P
35
Y
P
37
Y
P
39
Y
P
41
Y
P
43
Y
P
45
Y
P
48
Y
P
DB1 T
1
Y
P
3
Y
P
DB2 LP
1
Y
P
2
Y
P
3
Y
P
4
Y
P
5
Y
P
6
Y
P
7
Y
P
8
Y
P
9
Y
P
10
Y
P
11
Y
P
12
Y
P
13
Y
P
14
Y
P
15
Y
P
16
Y
P
17
Y
P
18
Y
P
19
Y
P
20
Y
P
21
Y
P
22
Y
P
23
Y
P
24
Y
P
25
Y
P
26
Y
P
27
Y
P
28
Y
P
29
Y
P
30
Y
P
31
Y
P
32
Y
P
33
Y
P
34
Y
P
36
Y
P
37
Y
P
39
Y
P
40
Y
P
42
Y
P
44
Y
P
46
Y
P
48
Y
P
49
Y
P
50
Y
P
51
Y
P
54
Y
P
56
Y
P
58
Y
P
60
Y
P
DB2 T
1
Y
P
2
Y
P
3
Y
P
4
Y
P
5
Y
P
6
Y
P
7
Y
P
8
Y
P
9
Y
P
10
Y
P
11
Y
P
12
Y
P
13
Y
P
15
Y
P
DB3 LP
1
Y
P
2
Y
P
3
Y
P
4
Y
P
5
Y
P
6
Y
P
7
Y
P
8
Y
P
9
Y
P
10
Y
P
11
Y
P
12
Y
P
13
Y
P
14
Y
P
15
Y
P
16
Y
P
17
Y
P
18
Y
P
19
Y
P
20
Y
P
21
Y
P
22
Y
P
23
Y
P
24
Y
P
25
Y
P
26
Y
P
27
Y
P
28
Y
P
29
Y
P
30
Y
P
31
Y
P
32
Y
P
34
Y
P
34
Y
P
35
Y
P
36
Y
P
37
Y
P
38
Y
P
39
Y
P
40
Y
P
41
Y
P
42
Y
P
43
Y
P
45
Y
P
47
Y
P
49
Y
P
51
Y
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
3
R
Y
Y
Y
P
10
R
Y
Y
Y
P
11
R
Y
Y
Y
P
12
S
Y
Y
Y
P
13
S
Y
Y
Y
P
14
S
Y
Y
Y
P
15
S
Y
Y
Y
P
16
S
Y
Y
Y
P
17
S
Y
Y
Y
P
18
S
Y
Y
Y
P
19
S
Y
Y
Y
P
20
S
Y
Y
Y
P
24
S
Y
Y
Y
P
25
S
Y
Y
Y
P
26
S
Y
Y
Y
P
29
S
Y
Y
Y
P
30
S
Y
Y
Y
P
31
S
Y
Y
Y
P
32
S
Y
Y
Y
P
33
S
Y
Y
Y
P
34
S
Y
Y
Y
P
35
S
Y
Y
Y
P
36
S
Y
Y
Y
P
37
R
Y
Y
Y
P
38
R
Y
Y
Y
P
42
S
Y
Y
Y
P
43
R
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
1
Y
Y
Y
P
2
Y
Y
Y
P
4
Y
Y
Y
P
5
Y
Y
Y
P
6
Y
Y
Y
P
7
Y
Y
Y
P
8
Y
Y
Y
P
9
Y
Y
Y
P
23
Y
Y
Y
P
28
Y
Y
Y
P
40
Y
Y
Y
P
41
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
No
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten)
Existing (YorN)
Hi Bay Halo Globes
Y
50mm LED Downlight
Y
2x36W Cage Fluoro
Y
2x36W Diffused Fluoro
Y
150mm LED Downlight
Y
Are there any Warranty items needing to be repaired?
No
Geotag photo(s)
Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
DB1 Schedule
BOH
2
Missing
N
TBA
TBA
Please advise if quote is required.
LED light boxes
Bar bridges/mobile phones
2
Not illuminated
N
TBA
TBA
Fault finding required, please advise if estimate is required. Do and Charge works may be required.
Fluro 3600mm light boxes
Fridges/home security
6
Not illuminated/partially illuminated
N
TBA
TBA
Please advise if quote is required.
Fridge displays
Westinghouse/electrolux
2
Not illuminated
N
TBA
TBA
Fault finding required, please advise if estimate is required. Do and Charge works may be required
Range hood display
Schweigen
1
Not illuminated
N
TBA
TBA
Fault finding required, please advise if estimate is required. Do and Charge works may be required
Dishwasher display
Fisher & Paykel
1
Not illuminated
N
TBA
TBA
Fault finding required, please advise if estimate is required. Do and Charge works may be required
Miele dishwasher/washing machines
Adj store entrance
2
4 out of 6 miele logos are illuminated
N
TBA
TBA
Fault finding required, please advise if estimate is required. Do and Charge works may be required
Power dropper
Store entrance
2
Weber and pendant tv near store entrance require a power dropper installed. Domestic power lead hanging on a big angle at present.
N
N
N
FYI
Kitchen Aid display
Front/mid trading floor
1
Not illuminated
N
TBA
TBA
Fault finding required, please advise if estimate is required. Do and Charge works may be required
Tv display
Samsung/big screens
2
Partiallly illuminated
N
TBA
TBA
Fault finding required, please advise if estimate is required. Do and Charge works may be required
160mm Downlight
Mens toilet/cleaners room upstairs
4
Not illuminated
N
TBA
TBA
There may also be fault finding as there was a leak recently, switch mech to cleaners room may need to be replaced). Please advise if quote is required.
Site Status Selector
Completed but with repairs required
Next Test Due in 6 months
29/07/2022
The Built Services Group seeks to apply innovation and technology for greater client services, business efficiencies and thinking Green.