StateVIC
Date of Visit03/02/2022
Technician's NameCale Johnstone
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number62664
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICshepparton

Location NameShepparton
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
Rear switchboard 2 Y P
switchboard 4 Y P
switchboard 6 Y P
switchboard 8 Y P
switchboard 10 Y P
switchboard 14 Y P
switchboard 18 Y P
switchboard 24 Y P
switchboard 51 Y P
switchboard 59 Y P
switchboard 61 Y P
switchboard 63 Y P
switchboard 65 Y P
switchboard 67 Y P
switchboard 69 Y P
switchboard 71 Y P
switchboard 73 Y P
switchboard 74 Y P
switchboard 75 Y P
switchboard 76 Y P
switchboard 77 Y P
switchboard 78 Y P
switchboard 79 Y P
switchboard 80 Y P
switchboard 81 Y P
switchboard 82 Y P
switchboard 83 Y P
switchboard 84 Y P
switchboard 86 Y P
switchboard 87 Y P
Sub board DB1 2 Y P
Sub board DB1 4 Y P
Sub board DB1 6 Y P
Sub board DB1 7 Y P
Sub board DB1 8 Y P
Sub board DB1 10 Y P
Sub board DB1 11 Y P
Sub board DB1 12 Y P
Sub board DB1 13 Y P
Sub board DB1 14 Y P
Sub board DB1 15 Y P
Sub board DB1 16 Y P
Sub board DB1 17 Y P
Sub board DB1 18 Y P
Sub board DB1 19 Y P
Sub board DB1 20 Y P
Sub board DB1 21 Y P
Sub board DB1 22 Y P
Sub board DB1 23 N N/A Circuit locked out by others
Sub board DB1 24 Y P
Sub board DB1 25 Y P
Sub board DB1 26 Y P
Sub board DB1 27 Y P
Sub board DB1 28 Y P
Sub board DB1 29 Y P
Sub board DB1 30 Y P
Sub board DB1 31 Y P
Sub board DB1 32 Y P
Sub board DB1 33 Y P
Sub board DB1 34 Y P
Sub board DB1 35 Y P
Sub board DB1 36 Y P
Sub board DB1 37 Y P
Sub board DB1 38 Y P
Sub board DB1 39 Y P
Sub board DB1 40 Y P
Sub board DB1 41 Y P
Sub board DB1 42 Y P
Sub board DB1 43 Y P
Sub board DB1 44 Y P
Sub board DB1 45 Y P
Sub board DB1 46 Y P
Sub board DB1 47 Y P
Sub board DB1 48 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Main switchboard 2 S Y Y Y P
Main switchboard 3 S Y Y Y P
Main switchboard 4 S Y Y Y P
Main switchboard 5 S Y Y Y P
Main switchboard 6 S Y Y Y P
Main switchboard 10 S Y Y Y P
Main switchboard 14 R Y Y Y P
Main switchboard 15 R Y Y Y P
Main switchboard 16 R Y Y Y P
Main switchboard 20 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
Main switchboard 1 Y Y Y P
Main switchboard 7 Y Y Y P
Main switchboard 8 Y Y Y P
Main switchboard 9 Y Y Y P
Main switchboard 11 Y Y Y P
Main switchboard 12 Y Y Y P
Main switchboard 13 Y Y Y P
Main switchboard 17 Y Y Y P
Main switchboard 18 Y Y Y P
Main switchboard 19 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Exit Lights LED Y
Exit Lights 10W Fluorescent Y
Surface Emergency Lights Y
Recessed Emergency Lights Y
MH Hi-Bay Lights 400W Y
2 x 36W Fluorescent Lights Y
70mm LED Downlights MR16 Y
18W Fluorescent Lights Y
Are there any Warranty items needing to be repaired?No
Site Status SelectorStore now fully compliant
Next Test Due in 6 months03/08/2022