StateNSW
Date of Visit14/02/2022
Technician's NameGlenn Robinson
Which Company are you working for?Please Choose...
Sturdie Job Number62528
EmailEmail hidden; Javascript is required.
The Good Guys Site in NSWwarners_bay

Location NameWarners Bay
HTML Block
Test Period12 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

RCD Details (Initial/12 Months)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DBT1 12 Y P
DBT1 13 Y P
DBT1 14 Y P
DBT1 15 Y P
DBT1 16 Y P
DBT1 17 Y P
DBT1 18 Y P
DBT1 19 Y P
DBT1 20 Y P
DBT1 21 Y P
DBT1 22 Y P
DBT1 23 Y P
DBT1 24 Y P
DBT1 25 Y P
DBT1 26 Y P
DBT1 27 Y P
DBT1 28 Y P
DBT1 29 Y P
DBT1 30 Y P
DBT1 31 Y P
DBT1 32 Y P
DBT1 33 Y P
DBT1 34 Y P
DBT1 35 Y P
DBT1 36 Y P
DBT1 37 Y P
DBT1 38 Y P
DBT1 39 Y P
DBT1 40 Y P
DBT1 41 Y P
DBT1 42 Y P
DBT1 43 Y P
DBT1 44 Y P
DBT1 45 Y P
DBT1 46 Y P
DBT1 47 Y P
DBT1 49 Y P
DBT1 51 Y P
DBT1 53 Y P
DBT1 54 Y P
DBT1 55 Y P
DBT1 56 Y P
DBT1 57 Y P
DBT1 58 Y P
DBT1 59 Y P
DBT1 60 Y P
DBT1 61 Y P
DBT1 62 Y P
DBT1 63 Y P
DBT1 64 Y P
DBT1 65 Y P
DBT1 66 Y P
DBT1 67 Y P
DBT1 68 Y P
DBT1 69 Y P
DBT1 70 Y P
DBT1 71 Y P
DBT1 72 Y P
DBT1 73 Y P
DBT1 74 Y P
DBT1 75 Y P
DBT1 76 Y P
DBT1 78 Y P
DBT1 80 Y P
DBT1 82 Y P
DBT1 84 Y P
DBT1A 7 Y P
DBT1A 9 Y P
DB2 3 Y P
DB2 5 Y P
DB2 6 Y P
DB2 7 Y P
DB2 8 Y P
DB2 9 Y P
DB2 10 Y P
DB2 11 Y P
DB2 12 Y P
DB2 13 Y P
DB2 14 Y P
DB2 15 Y P
DB2 16 Y P
DB2 17 Y P
DB2 18 Y P
DB2 19 Y P
DB2 20 Y P
DB2 21 Y P
DB2 22 Y P
DB2 23 Y P
DB2 24 Y P
DB2 26 Y P
DB2 28 Y P
DB2 31 Y P
DB2 27 Y P
THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
  • Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 1 S Y Y Y P
DB1 2 S Y Y Y P
DB1 6 S Y Y Y P
DB1 7 S Y Y Y P
DB1 8 S Y Y Y P
DB1 9 S Y Y Y P
DB1 10 S Y Y Y P
DB1 12 S Y Y Y P
DB1 17 S Y Y Y P
DB1 18 S Y Y Y P
DB1 19 S Y Y Y P
DB1 20 S Y Y Y P
DB1 21 S Y Y Y P
DB1 22 S N N N F Battery failed 90 minute test Y N
DB1 23 S Y Y Y P
DB1 28 S Y Y Y P
DB1 29 R Y Y Y P
DB1 30 R Y Y Y P
DB1 33 R Y Y Y P
DB1 34 R Y Y Y P
DB1 35 R Y Y Y P
DB1 36 R Y Y Y P
DB1 37 R Y Y Y P
DB1 39 R Y Y Y P
DB1 41 R Y Y Y P
DB1 42 R Y Y Y P
DB1 43 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB1 3 Y Y Y P
DB1 4 Y Y Y P
DB1 5 N N N F Battery failed 90 minute test Y N
DB1 11 Y Y Y P
DB1 13 Y Y Y P
DB1 14 Y Y Y P
DB1 15 Y Y Y P
DB1 16 Y Y Y P
DB1 24 Y Y Y P
DB1 25 Y Y Y P
DB1 26 Y Y Y P
DB1 27 Y Y Y P
DB1 31 Y Y Y P
DB1 32 Y Y Y P
DB1 38 Y Y Y P
DB1 40 N N N F Battery failed 90 minute test Y N
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
Circular Hibay Y
36w Twin Fluoro Y
9W LED Downlight Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Fluoro emergency batten #22 Back store area 1 Battery failed 90 minute test Y N N Replaced with surface mount emergency light
Exit light #5 & #40 Shop floor 2 Battery failed 90 minute test Y N N Replaced exit lights
Site Status SelectorStore now fully compliant
Next Test Due in 6 months12/08/2022