| Partner Name | Built Electrical Australia |
|---|
| State | NSW |
|---|
| Date of Visit | 14/02/2022 |
|---|
| Technician's Name | Peter Hay |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 62336 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in NSW | blacktown |
|---|
|
|
|---|
| Location Name | Blacktown |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
17 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
20 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
23 |
Y |
P |
|
|
|
24 |
Y |
P |
|
|
|
25 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
|
27 |
Y |
P |
|
|
|
28 |
Y |
P |
|
|
|
29 |
Y |
P |
|
|
|
32 |
Y |
P |
|
|
|
34 |
Y |
P |
|
|
|
36 |
Y |
P |
|
|
| DB1B |
1 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
| DB2 |
3 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
| DB3 |
4 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
22 |
Y |
P |
|
|
|
28 |
Y |
P |
|
|
|
30 |
Y |
P |
|
|
| DB3B |
1 |
Y |
P |
|
|
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
S |
Y |
N |
Y |
F |
Failed 90 Min Test |
Y |
N |
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
S |
Y |
Y |
Y |
P |
|
|
|
|
12 |
S |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
N |
Y |
F |
Failed 90 Min Test |
Y |
N |
|
14 |
S |
Y |
Y |
Y |
P |
|
|
|
|
15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
17 |
S |
Y |
Y |
Y |
P |
|
|
|
|
18 |
S |
Y |
N |
Y |
F |
Failed 90 Min Test |
Y |
N |
|
19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
20 |
S |
Y |
N |
Y |
F |
Failed 90 Min Test |
Y |
N |
|
21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
23 |
S |
Y |
Y |
Y |
P |
|
|
|
|
24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
28 |
R |
Y |
Y |
Y |
P |
|
|
|
|
29 |
R |
Y |
Y |
Y |
P |
|
|
|
|
30 |
R |
Y |
Y |
Y |
P |
|
|
|
|
31 |
R |
Y |
Y |
Y |
P |
|
|
|
|
32 |
R |
Y |
Y |
Y |
P |
|
|
|
|
33 |
R |
Y |
Y |
Y |
P |
|
|
|
|
34 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
|
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
Y |
Y |
Y |
P |
|
|
|
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | No |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| Halo High Bays |
Y |
| Pelmet Lights 21W and 28W T5 Light Boxes |
Y |
| 2 x 28W Plastic Diffused Fluoro Fitting |
Y |
| 2 x 28W Caged Fluoro Fitting |
Y |
| 5W LED Downlight 50mm Fitting |
Y |
| 150mm LED Downlight |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Emergency light plan |
Office |
1 |
Missing |
Y |
N |
N |
New plan marked up and left in site folder. |
| Surface Mount Emergency Light |
18 & 20 |
2 |
Failed 90 Min Test |
Y |
N |
N |
Replaced fittings, scissor required. |
| Emergency Batten Light |
1 & 13 |
2 |
Failed 90 Min Test |
Y |
N |
N |
Replaced fittings, scissor required. |
| DB schedule |
DB3 |
1 |
Missing |
N |
TBA |
TBA |
Added to fortnightly repairs list, please advise if quote is required. |
| Unprotected Cable |
DB3 |
1 |
Non compliant. Must repair.Cable supplying db3a is not protected. The busbar has been extended in 2.5mm. |
Y |
N |
N |
Repaired. OHS issue. |
| Light box |
Hi sense fridge display |
1 |
Flickering light box |
N |
TBA |
TBA |
Added to fortnightly repairs list, please advise if quote is required. |
| Linkable lights |
Smeg kitchen display |
2 |
Not illuminated |
N |
TBA |
TBA |
Added to fortnightly repairs list, please advise if quote is required. |
| Led wall bay Light box |
Monitors/fridges |
12 |
Not illuminated |
N |
TBA |
TBA |
Added to fortnightly repairs list, please advise if quote is required. |
| Downlight gimble |
Tv section |
1 |
Spring missing |
N |
TBA |
TBA |
Added to fortnightly repairs list, please advise if quote is required. |
| RCBO's |
DB1, DB2, DB3 |
Multiple |
Power circuits on mcb. Rcd upgrade required. |
N |
TBA |
TBA |
Added to fortnightly repairs list, please advise if quote is required. |
|
|---|
| Site Status Selector | Completed but with repairs required |
|---|
| Next Test Due in 6 months | 13/08/2022 |
|---|
| |
|---|
| |