Partner NameSturdie Trade Services
StateVIC
Date of Visit21/03/2022
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number62252
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICnunawading

Location NameNunawading
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-7/2 12 Y P
DB-7/2 14 Y P
DB-7/2 16 Y P
DB-7/2 18 Y P
DB-7/2 20 Y P
DB-7/2 22 Y P
DB-7/2 24 Y P
DB-7/2 26 Y P
DB-7/2 28 Y P
DB-7/2 30 Y P
DB-7/2 32 Y P
DB-7/2 34 Y P
DB-7/2 36 Y P
DB-7/2 38 Y P
DB-7/2 40 Y P
DB-7/2 42 Y P
DB-7/2 44 Y P
DB-7/2 46 Y P
DB-7/2 48 Y P
DB-7/2 54 Y P
DB-7/2 56 Y P
DB-7/2 58 Y P
DB-7/2 60 Y P
DB-7/2 62 Y P
DB-7/2 64 Y P
DB-7/2 66 Y P
DB-7/2 68 Y P
DB-7/4 01 Y P
DB-7/4 03 Y P
DB-7/4 05 Y P
DB-7/4 07 Y P
DB-7/4 09 Y P
DB-7/4 10 Y P
DB-7/4 11 Y P
DB-7/4 12 Y P
DB-7/4 13 Y P
DB-7/4 14 Y P
DB-7/4 15 Y P
DB-7/4 16 Y P
DB-7/4 17 Y P
DB-7/4 18 Y P
DB-7/4 19 Y P
DB-7/4 21 Y P
DB-7/4 22 Y P
DB-7/4 23 Y P
DB-7/4 24 Y P
DB-7/4 29 Y P
DB-7/4 32 Y P
DB-7/4 33 Y P
DB-7/4 34 Y P
DB-7/4 35 Y P
DB-7/4 36 Y P
DB-7/4 37 Y P
DB-7/4 38 Y P
DB-7/4 39 Y P
DB-7/4 40 Y P
DB-7/4 41 Y P
DB-7/4 42 Y P
DB-7/4 43 Y P
DB-7/4 44 Y P
DB-7/1 04 Y P
DB-7/1 06 Y P
DB-7/1 08 Y P
DB-7/1 10 Y P
DB-7/1 12 Y P
DB-7/1 14 Y P
DB-7/1 16 Y P
DB-7/1 22 Y P
DB-7/1 24 Y P
DB-7/1 25 Y P
DB-7/1 26 Y P
DB-7/1 28 Y P
DB-7/1 30 Y P
DB-7/1 32 Y P
DB-7/1 34 Y P
DB-7/1 36 Y P
DB-7/1 50 Y P
DB-7/1 52 Y P
DB-7/1 54 Y P
DB-7/1 56 Y P
DB-7/1 58 Y P
DB-7/1 60 Y P
DB-7/1 62 Y P
DB-7/1 64 Y P
DB-7/1 66 Y P
DB-7/1 68 Y P
DB-7/1 70 Y P
DB-7/1 72 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-7/2 2 S Y Y Y P
3 S Y Y Y P
4 S Y Y Y P
7 S Y Y Y P
8 S Y Y Y P
9 S Y Y Y P
11 S Y Y Y P
12 S Y Y Y P
14 S Y Y Y P
DB-7/1 15 S Y Y Y P
16 S Y Y Y P
18 S Y Y Y P
19 S Y Y Y P
21 S Y Y Y P
22 S Y Y Y P
23 S Y Y Y P
25 S Y Y Y P
26 S Y Y Y P
27 S Y Y Y P
DB-7/4 29 R Y Y Y P
30 R Y Y Y P
31 R Y Y Y P
32 R Y Y Y P
34 R Y Y Y P
DB-7/1 38 S Y Y Y P
DB-7/4 41 S Y Y Y P
43 R Y Y Y P
45 R Y Y Y P
46 R Y Y Y P
47 R Y Y Y P
48 R Y Y Y P
DB-7/3 50 S Y Y Y P
51 S Y Y Y P
53 R Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-7/2 1 Y Y Y P
5 Y Y Y P
6 Y Y Y P
10 Y Y Y P
13 Y Y Y P
DB-7/1 17 Y Y Y P
20 Y Y Y P
24 Y Y Y P
DB-7/4 28 Y Y Y P
DB-7/1 33 Y Y Y P
35 Y Y Y P
36 Y Y Y P
37 Y Y Y P
39 Y Y Y P
DB-7/4 40 Y Y Y P
42 Y Y Y P
44 Y Y Y P
DB-7/3 49 Y Y Y P
52 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED Hi-Bay Lights Y
Double Diffused 36W Fluorescent Lights Y
Single Diffused 36W Fluorescent Lights Y
Double Bare 36W Fluorescent Lights Y
Single Bare 36W Fluorescent Lights Y
70mm Downlights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
DB-7/3 BASEMENT STORE ROOM 1 NO RCDS INSTALLED IN DB N N N OBSERVATION. ADDED TO FORTNIGHTLY REPAIRS
TEST AND TAG BASEMENT STORE ROOM 20+ TEST AND TAG EXPIRED N N N OBSERVATION
TEST AND TAG MAIN STORE 80+ TEST AND TAG INDATE, NEXT TEST DUE 07 MARCH 23 N N N OBSERVATION
HIGH BAY DIFFUSED FREE STANDING OVENS 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW LED HIGH BAY
RACK LIGHT BOX HEATING/COOLING 1 FAILED TO ILLUMINATE Y N N REPLACED WITH 8 X NEW LED LINKABLES
RACK LIGHT BOX FRIDGES 1 PARTIALLY ILLUMINATED Y N N REPLACED WITH 4 X NEW LED LINKABLES
RACK LIGHT BOX FRIDGES 1 PARTIALLY ILLUMINATED Y N N REPLACED WITH 8 X NEW LED LINKABLES
70MM DOWNLIGHT FEMALE TOILET 1 FAILED TO ILLUMINATE Y N N REPLACED WITH NEW
Site Status SelectorStore now fully compliant
Next Test Due in 6 months21/09/2022