| Partner Name | Transit Electrical Pty Ltd |
|---|
| State | WA |
|---|
| Date of Visit | 20/04/2022 |
|---|
| Technician's Name | Bayley Woodroffe |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 62613 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in WA | malaga |
|---|
|
|
|---|
| Location Name | Malaga |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB 01 |
3W |
Y |
P |
|
|
| DB 01 |
3B |
Y |
P |
|
|
| DB 01 |
7R |
Y |
P |
|
|
| DB 01 |
9R |
Y |
P |
|
|
| DB 01 |
9W |
Y |
P |
|
|
| DB 01 |
11R |
Y |
P |
|
|
| DB 01 |
11W |
Y |
P |
|
|
| DB 01 |
11B |
Y |
P |
|
|
| DB 01 |
13R |
Y |
P |
|
|
| DB 01 |
13W |
Y |
P |
|
|
| DB 01 |
15R |
Y |
P |
|
|
| DB 01 |
15W |
Y |
P |
|
|
| DB 01 |
19R |
Y |
P |
|
|
| DB 01 |
19W |
Y |
P |
|
|
| DB 01 |
23R |
Y |
P |
|
|
| DB 01 |
23W |
Y |
P |
|
|
| DB 01 |
27R |
Y |
P |
|
|
| DB 01 |
31R |
Y |
P |
|
|
| DB 01 |
31B |
Y |
P |
|
|
| DB 01 |
33R |
Y |
P |
|
|
| DB 01 |
33W |
Y |
P |
|
|
| DB 01 |
33B |
Y |
P |
|
|
| DB 01 |
6B |
Y |
P |
|
|
| DB 01 |
8B |
Y |
P |
|
|
| DB 01 |
10R |
Y |
P |
|
|
| DB 01 |
10W |
Y |
P |
|
|
| DB 01 |
10B |
Y |
P |
|
|
| DB 01 |
12R |
Y |
P |
|
|
| DB 01 |
12W |
Y |
P |
|
|
| DB 01 |
12B |
Y |
P |
|
|
| DB 01 |
20W |
Y |
P |
|
|
| DB 01 |
20B |
Y |
P |
|
|
| DB 01 |
24W |
Y |
P |
|
|
| DB 01 |
24B |
Y |
P |
|
|
| DB 01 |
28RWB |
Y |
P |
|
|
| DB 01 |
30R |
Y |
P |
|
|
| DB 01 |
30B |
Y |
P |
|
|
| DB 01 |
32R |
Y |
P |
|
|
| DB 01 |
32W |
Y |
P |
|
|
| DB 01 |
32B |
Y |
P |
|
|
| DB 01 |
34R |
Y |
P |
|
|
| DB 01 |
34W |
Y |
P |
|
|
| DB 01 |
34B |
Y |
P |
|
|
| DB 02 |
1R |
Y |
P |
|
|
| DB 02 |
1B |
Y |
P |
|
|
| DB 02 |
3R |
Y |
P |
|
|
| DB 02 |
2R |
Y |
P |
|
|
| DB 02 |
2W |
Y |
P |
|
|
| DB 02 - B |
3W |
Y |
P |
|
|
| DB 02 - B |
3B |
Y |
P |
|
|
| DB 02 - B |
5R |
Y |
P |
|
|
| DB 02 - B |
W5 |
Y |
P |
|
|
| DB 02 - B |
B5 |
Y |
P |
|
|
| DB 02 - B |
R7 |
Y |
P |
|
|
| DB 02 - B |
W7 |
Y |
P |
|
|
| DB 02 - B |
B7 |
Y |
P |
|
|
| DB 02 - B |
R9 |
Y |
P |
|
|
| DB 02 - B |
W9 |
Y |
P |
|
|
| DB 02 - B |
B9 |
Y |
P |
|
|
| DB 02 - B |
6R |
Y |
P |
|
|
| DB 02 - B |
6W |
Y |
P |
|
|
| DB 02 - B |
6B |
Y |
P |
|
|
| DB 02 - B |
8R |
Y |
P |
|
|
| DB 02 - B |
8W |
Y |
P |
|
|
| DB 02 - B |
8B |
Y |
P |
|
|
| DB 02 - B |
10R |
Y |
P |
|
|
| DB 02 - B |
18W |
Y |
P |
|
|
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 01 |
3 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
4 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
5 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
6 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
7 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
8 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
9 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
10 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
11 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
12 |
Twin tubed batten |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
23 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
24 |
S |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 01 |
1 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
16 |
Y |
N |
Y |
F |
Battery failed test |
Y |
N |
| DB 02 |
18 |
Y |
Y |
Y |
P |
|
|
|
| DB 02 |
21 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
22 |
Y |
N |
Y |
F |
Battery failed test |
Y |
N |
| DB 02 |
26 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
27 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
28 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
29 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
30 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
31 |
Y |
Y |
Y |
P |
|
|
|
| DB 01 |
32 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| 40w oyster light |
Y |
| 8w down lights |
Y |
| LED hibay |
Y |
| Jumbo exits |
Y |
| Exit |
Y |
| Emergency spit fire em |
Y |
| Emergency 2 by 36w batten |
Y |
| LED 7w b27 batten globe |
Y |
| LED spot lights |
Y |
| 60w bunker lights |
Y |
| Par 38 twin spots |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Jumbo Exit #22 |
Entry to Warehouse |
1 |
Failed test - Battery |
Y |
N |
N |
|
| Exit #16 |
Fire exit near TVs |
1 |
Failed test - Battery |
Y |
N |
N |
|
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 20/10/2022 |
|---|
| |
|---|
| |