| Partner Name | CROWE ELECTRICAL SERVICES PTY LTD |
|---|
| State | VIC |
|---|
| Date of Visit | 21/04/2022 |
|---|
| Technician's Name | Connor Medcalf |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 62268 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in VIC | mornington |
|---|
|
|
|---|
| Location Name | Mornington |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | 6 Monthly (90 minutes) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| RCD Details (6 Month) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB-B3-B |
7 |
Y |
P |
|
|
| DB-B3-B |
8 |
Y |
P |
|
|
| DB-B3-B |
9 |
Y |
P |
|
|
| DB-B3-B |
10 |
Y |
P |
|
|
| DB-B3-B |
11 |
Y |
P |
|
|
| DB-B3-B |
12 |
Y |
P |
|
|
| DB-B3-B |
13 |
Y |
P |
|
|
| DB-B3-B |
14 |
Y |
P |
|
|
| DB-B3-B |
15 |
Y |
P |
|
|
| DB-B3-B |
16 |
Y |
P |
|
|
| DB-B3-B |
17 |
Y |
P |
|
|
| DB-B3-B |
18 |
Y |
P |
|
|
| DB-B3-B |
19 |
Y |
P |
|
|
| DB-B3-B |
20 |
Y |
P |
|
|
| DB-B3-B |
21 |
Y |
P |
|
|
| DB-B3-B |
22 |
Y |
P |
|
|
| DB-B3-B |
21 |
Y |
P |
|
|
| DB-B3-B |
22 |
Y |
P |
|
|
| DB-B3-B |
23 |
Y |
P |
|
|
| DB-B3-B |
24 |
Y |
P |
|
|
| DB-B3-B |
26 |
Y |
P |
|
|
| DB-B3-B |
28 |
Y |
P |
|
|
| DB-B3-B |
30 |
Y |
P |
|
|
| DB-B3-B |
31 |
Y |
P |
|
|
| DB-B3-B |
32 |
Y |
P |
|
|
| DB-B3-B |
33 |
Y |
P |
|
|
| DB-B3-B |
34 |
Y |
P |
|
|
| DB-B3-B |
35 |
Y |
P |
|
|
| DB-B3-B |
36 |
Y |
P |
|
|
| DB-B3-B |
37 |
Y |
P |
|
|
| DB-B3-B |
38 |
Y |
P |
|
|
| DB-B3-B |
39 |
Y |
P |
|
|
| DB-B3-B |
40 |
Y |
P |
|
|
| DB-B3-B |
41 |
Y |
P |
|
|
| DB-B3-B |
42 |
Y |
P |
|
|
| DB-B3-B |
43 |
Y |
P |
|
|
| DB-B3-B |
44 |
Y |
P |
|
|
| DB-B3-B |
45 |
Y |
P |
|
|
| DB-B3-B |
47 |
Y |
P |
|
|
| DB-B3-B |
48 |
Y |
P |
|
|
| DB-B3-A |
2 |
Y |
P |
|
|
| DB-B3-A |
4 |
Y |
F |
RCBO failed |
Y |
| DB-B3-A |
8 |
Y |
F |
RCBO failed |
Y |
| DB-B3-A |
9 |
Y |
P |
|
|
| DB-B3-A |
10 |
Y |
P |
|
|
| DB-B3-A |
11 |
Y |
P |
|
|
| DB-B3-A |
12 |
Y |
P |
|
|
| DB-B3-A |
13 |
Y |
P |
|
|
| DB-B3-A |
14 |
Y |
P |
|
|
| DB-B3-A |
15 |
Y |
P |
|
|
| DB-B3-A |
16 |
Y |
P |
|
|
| DB-B3-A |
17 |
Y |
P |
|
|
| DB-B3-A |
18 |
Y |
P |
|
|
| DB-B3-A |
19 |
Y |
P |
|
|
| DB-B3-A |
20 |
Y |
P |
|
|
| DB-B3-A |
21 |
Y |
P |
|
|
| DB-B3-A |
22 |
Y |
P |
|
|
| DB-B3-A |
23 |
Y |
P |
|
|
| DB-B3-A |
24 |
Y |
P |
|
|
| DB-B3-A |
25 |
Y |
P |
|
|
| DB-B3-A |
26 |
Y |
P |
|
|
| DB-B3-A |
27 |
Y |
P |
|
|
| DB-B3-A |
28 |
Y |
P |
|
|
| DB-B3-A |
29 |
Y |
P |
|
|
| DB-B3-A |
30 |
Y |
P |
|
|
| DB-B3-A |
31 |
Y |
P |
|
|
| DB-B3-A |
32 |
Y |
P |
|
|
| DB-B3-A |
33 |
Y |
P |
|
|
| DB-B3-A |
35 |
Y |
P |
|
|
| DB-B3-A |
36 |
Y |
F |
RCBO failed |
Y |
| DB-B3-A |
38 |
Y |
P |
|
|
| DB-B3-A |
48 |
Y |
P |
|
|
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB-B3-A |
10 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
11 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
12 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
13 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
14 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
15 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
16 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
17 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
18 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
19 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
20 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
21 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
22 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
23 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
24 |
R |
Y |
N |
N |
F |
Failed Test |
Y |
N |
| DB-B3-B |
25 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
26 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
27 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
28 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
29 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
30 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
31 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
32 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
33 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
34 |
R |
Y |
N |
N |
F |
Failed Test |
Y |
N |
| DB-B3-B |
35 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
36 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
37 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
38 |
R |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
39 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB-B3-A |
1 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
2 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
3 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
4 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
5 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-A |
6 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
7 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
8 |
Y |
Y |
Y |
P |
|
|
|
| DB-B3-B |
9 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| 1200 x 300 TBAR PANEL LIGHTS |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | No |
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| RCBO's #4, #8 & #36 |
DB-3B-A |
3 |
RCBO's failed |
Y |
N |
N |
|
| Recessed Emergeny Lights #24 & #34 |
BOH & above Samsung TVs |
2 |
Failed test - battery |
Y |
N |
N |
|
|
|---|
| Site Status Selector | Store now fully compliant |
|---|
| Next Test Due in 6 months | 20/10/2022 |
|---|
| |
|---|
| |