Partner NameSturdie Trade Services
StateVIC
Date of Visit04/05/2022
Technician's NameNathan McBain
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number62817
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICballarat

Location NameBallarat
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB1 09 Y P
DB1 11 Y P
DB1 12 Y P
DB1 15 Y P
DB1 17 Y P
DB1 31 Y P
DB1 32 Y P
DB1 40 Y P
DB1 42 Y P
DB1 44 Y P
DB1 46 Y P
DB1 47 Y P
DB1 48 Y P
DB1 50 Y P
DB1 54 Y P
DB1 57 Y P
DB1A 01 Y P
DB1A 04 Y P
DB1A 05 Y P
DB1A 07 Y P
DB1A 10 Y P
DB1A 13 Y P
DB1A 16 Y P
DB1A 22 Y P
DB1A 27 Y P
DB1A 29 Y P
DB1A 31 Y P
DB1A 32 Y P
DB1A 33 Y P
DB1A 34 Y P
DB1A 35 Y P
DB1A 36 Y P
DB1A 37 Y P
DB1A 38 Y P
DB1A 39 Y P
DB1A 40 Y P
DB1A 41 Y P
DB1A 43 Y P
DB1A 44 Y P
DB1A 45 Y P
DB1A 46 Y P
DB1A 48 Y P
DB2 20 Y P
DB2 24 Y P
DB2 26 Y P
DB2 28 Y P
DB2 40 Y P
DB2 42 Y P
DB2 44 Y P
DB2 46 Y P
DB2 48 Y P
DB2A 04 Y P
DB2A 06 Y P
DB2A 08 Y P
DB2A 10 Y P
DB2A 12 Y P
DB2A 14 Y P
DB2A 16 Y P
DB2A 18 Y P
DB2A 20 Y P
DB2A 22 Y P
DB2A 24 Y P
DB2A 28 Y P
DB2A 29 Y P
DB2A 30 Y P
DB2A 31 Y P
DB2A 32 Y P
DB2A 33 Y P
DB2A 34 Y P
DB2A 35 Y P
DB2A 36 Y P
DB2A 37 Y P
DB2A 38 Y P
DB2A 39 Y P
DB2A 40 Y P
DB2A 41 Y P
DB2A 44 Y P
DB2A 46 Y P
DB2A 48 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y Y Y P
10 Y Y Y P
11 Y Y Y P
12 Y Y Y P
13 Y Y Y P
14 Y Y Y P
15 Y Y Y P
16 Y Y Y P
17 Y Y Y P
18 Y Y Y P
19 Y Y Y P
20 Y Y Y P
21 Y Y Y P
22 Y Y Y P
23 Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
1 Y Y Y P
2 Y Y Y P
3 Y Y Y P
4 Y Y Y P
5 Y Y Y P
6 Y Y Y P
7 Y Y Y P
8 Y Y Y P
9 Y N Y F Battery Y N
10 Y Y Y P
11 Y Y Y P
12 Y Y Y P
13 Y Y Y P
14 Y Y Y P
15 Y Y Y P
16 Y Y Y P
17 Y Y Y P
18 Y Y Y P
19 Y Y Y P
20 Y Y Y P
21 Y Y Y P
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
LED Batten 4K Y
Hi-Bay Y
Twin LED Tubed Bare Batten Y
Recessed Emergency Y
Surface Mounted Emergency Y
Exit Lights Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
TEST AND TAG STORE 80+ TEST AND TAG ARE IN DATE, NEXT TEST DUE 01/03/2023 N N N FOR YOUR INFORMATION
EXIT #9 TOP OF STAIRES NEAR DBS 1 FAILED BATTERY TEST Y N N
LIGHT FITTING FEMALE TOILET 1 FAILED TO ILLUMINATE Y N N
EMERGENCY TEST UNIT ABOVE SUB BOARD 1 1 NOT RESETTING, HAVE TO ISOLATE CONTROL CB TO TURN OFF, OR LET TIME OUT N N N QUOTE RECOMMENDATION LISTED ON FORTNIGHTLY REPORT. NO CIRCUIT THROUGH EMERGENCY TEST UNIT MOUNTED ABOVE SUB BOARD 2A. INVESTIGATED AT PREVIOUS AUDIT
EMERGENCY LIGHT CIRCUITS SUB BOARD 2 2 2 × CIRCUITS NOT THROUGH TEST UNIT CB34, CB36 SUB BOARD 2 N N N QUOTE RECOMMENDATION LISTED ON FORTNIGHTLY REPORT. ALSO INVESTIGATED UPON PREVIOUS AUDIT. REFERS TO REAR DOWNSTAIRS STORE ROOM AND KITCHEN/TOILET/STAFF AREA.
DROPPER LABELS KITCHEN AREA 10 LABELLED WITH DYMO LABELER Y N N
SECURITY CAMERA FRONT ENTRANCE LOOKING AT DISHWASHERS 1 TILE CAMERA THAT IT IS MOUNTED TO HAS HAD WATER DAMAGE, CAMERA HANGING Y N N REPLACED TILE WITH ONE FROM REAR OF STORE (TV AREA). WILL REPLACE TILE UPON NEXT AUDIT
SITE FOLDER OFFICE 1 NO SITE FOLDER Y N N SITE FOLDER TO BE SENT TO THE STORE
EMERGENCY LIGHTING LAYOUT AND NUMBERING SITE FOLDER 1 EMERGENCY LIGHTING LAYOUT NEEDS TO BE UPDATED AND ADDED TO SITE FOLDER N N N UPON NEXT AUDIT, EMERGENCY LIGHTING LAYOUT WILL NEED TO BE UPDATED AND ADDED TO SITE FOLDER. PLANS WERE UPDATED AFTER RENOVATIONS
Site Status SelectorStore now fully compliant
Next Test Due in 6 months04/11/2022