Partner Name | Transit Electrical Pty Ltd |
---|
State | WA |
---|
Date of Visit | 19/05/2022 |
---|
Technician's Name | Bayley Woodroffe |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 62615 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in WA | mandurah |
---|
|
|
---|
Location Name | Mandurah |
---|
| |
---|
HTML Block |
|
---|
Test Period | 6 Monthly (90 minutes) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
RCD Details (6 Month) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB 01 - General light and power |
1 |
Y |
P |
|
|
|
1 |
Y |
P |
|
|
|
1 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
7 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
R21-W23 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
DB 01- Power |
45 |
Y |
P |
|
|
|
45 |
Y |
P |
|
|
|
45 |
Y |
P |
|
|
|
47 |
Y |
P |
|
|
|
47 |
Y |
P |
|
|
|
47 |
Y |
P |
|
|
|
49 |
Y |
P |
|
|
|
49 |
Y |
P |
|
|
|
49 |
Y |
P |
|
|
|
51 |
Y |
P |
|
|
|
51 |
Y |
P |
|
|
|
51 |
Y |
P |
|
|
|
53 |
Y |
P |
|
|
|
53 |
Y |
P |
|
|
|
53 |
Y |
P |
|
|
|
46 |
Y |
P |
|
|
|
46 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
|
48 |
Y |
P |
|
|
DB 02 - Front of store |
1 |
Y |
P |
|
|
|
3 |
Y |
P |
|
|
|
5 |
Y |
P |
|
|
|
9 |
Y |
P |
|
|
|
11 |
Y |
P |
|
|
|
13 |
Y |
P |
|
|
|
15 |
Y |
P |
|
|
|
17 |
Y |
P |
|
|
|
19 |
Y |
P |
|
|
|
21 |
Y |
P |
|
|
|
23 |
Y |
P |
|
|
|
25 |
Y |
P |
|
|
|
27 |
Y |
P |
|
|
|
29 |
Y |
P |
|
|
|
2 |
Y |
P |
|
|
|
4 |
Y |
P |
|
|
|
6 |
Y |
P |
|
|
|
8 |
Y |
P |
|
|
|
10 |
Y |
P |
|
|
|
12 |
Y |
P |
|
|
|
14 |
Y |
P |
|
|
|
16 |
Y |
P |
|
|
|
18 |
Y |
P |
|
|
|
26 |
Y |
P |
|
|
|
28 |
Y |
P |
|
|
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
9 |
S |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
13 |
S |
Y |
Y |
Y |
P |
|
|
|
|
14 |
S-2 by 36w batten |
Y |
Y |
Y |
P |
|
|
|
|
16 |
R |
Y |
Y |
Y |
P |
|
|
|
|
17 |
R |
Y |
Y |
Y |
P |
|
|
|
|
18 |
R |
Y |
N |
Y |
F |
Battery |
Y |
N |
|
19 |
R |
Y |
Y |
Y |
P |
|
|
|
|
20 |
R |
Y |
Y |
Y |
P |
|
|
|
|
21 |
S |
Y |
N |
Y |
F |
Battery |
Y |
N |
|
22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
23 |
S |
Y |
Y |
Y |
P |
|
|
|
|
24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
26 |
S |
Y |
Y |
Y |
P |
|
|
|
|
27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
31 |
R |
Y |
Y |
Y |
P |
|
|
|
|
33 |
R |
Y |
Y |
Y |
P |
|
|
|
|
35 |
R |
Y |
Y |
Y |
P |
|
|
|
|
36 |
R |
Y |
Y |
Y |
P |
|
|
|
|
37 |
R |
Y |
Y |
Y |
P |
|
|
|
|
38 |
R |
Y |
Y |
Y |
P |
|
|
|
|
39 |
R |
Y |
Y |
Y |
P |
|
|
|
|
40 |
R |
Y |
Y |
Y |
P |
|
|
|
|
41 |
R |
Y |
Y |
Y |
P |
|
|
|
|
42 |
R |
Y |
Y |
Y |
P |
|
|
|
|
44 |
R |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB 01 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
25 |
Y |
Y |
Y |
P |
|
|
|
|
29 |
Y |
Y |
Y |
P |
|
|
|
|
30 |
Y |
Y |
Y |
P |
|
|
|
|
32 |
N |
N |
Y |
F |
Battery |
Y |
N |
|
34 |
Y |
Y |
Y |
P |
|
|
|
|
43 |
Y |
N |
Y |
F |
Battery |
Y |
N |
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED Hibay UFO |
Y |
400w Low bay |
Y |
400w Low bay defused |
Y |
12v Halogen down lights |
Y |
LED Down lights SAL |
Y |
1 by 36w Defused battens |
Y |
1 by 30w Defused battens |
Y |
Jumbo exit |
Y |
2 by par 38 Spot |
Y |
1 by 30w Defused emergency batten dual opperation |
Y |
Oyster light |
Y |
LED Oyster light |
Y |
150w round MH shop light |
Y |
Exits |
Y |
2 by 36w Defused emergency batten |
Y |
Spit fire emergency |
Y |
|
---|
Are there any Warranty items needing to be repaired? | Yes |
---|
WARRANTY | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
LED HiBay |
Washing machines |
1 |
Not illuminated |
DAVIS |
|
Y |
Scissor Lift was required |
|
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
Recessed Emergency #18 |
TV section |
1 |
Failed Test |
Y |
N |
N |
|
Surface Mount Emergency #21 |
BoH |
1 |
Failed test |
Y |
N |
N |
Scissor Lift was required |
Exit #32 |
Office stairwell |
1 |
Failed test |
Y |
N |
N |
|
Exit #43 |
Store entry |
1 |
Failed test |
Y |
N |
N |
|
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 19/11/2022 |
---|
| |
---|
| |