Partner NameSturdie Trade Services
StateVIC
Date of Visit30/05/2022
Technician's NameMatt Setches
Which Company are you working for?Sturdie Trade Services
Sturdie Job Number62273
EmailEmail hidden; Javascript is required.
The Good Guys Site in VICnarre_warren

Location NameNarre Warren
HTML Block
Test Period6 Monthly (90 minutes)
Push Button Test
  • Carry out push button test for correct operation
Carry out push button test for correct operation
HTML Block
Carry out test with RCD Tester

Carry out push button test and record the results below.

THERMOGRAPHIC TEST RESULTS

THERMOGRAPHIC TEST RESULTS

RCD Details (6 Month)
Distribution Board No. Circuit No. Push Button (YorN) Pass / Fail (PorF) Fault? Repaired on Site (YorN)
DB-13 13 Y P
DB-13 15 Y P
DB-13 17 Y P
DB-13 21 Y P
DB-13 23 Y P
DB-13 30 Y P
DB-13 34 Y P
DB-13 35 Y P
DB-13 44 Y P
DB-13 45 Y P
DB-13 46 Y P
DB-13 47 Y P
DB-13 48 Y P
DB-13A 1 Y P
DB-13A 2 Y P
DB-13A 3 Y P
DB-13A 4 Y P
DB-13A 5 Y P
DB-13A 6 Y P
DB-13A 7 Y P
DB-13A 8 Y P
DB-13A 10 Y P
DB-13A 12 Y P
DB-13A 13 Y P
DB-13A 15 Y P
DB-13A 17 Y P
DB-13A 19 Y P
DB-13A 21 Y P
DB-13A 23 Y P
DB-13A 25 Y P
DB-13A 26 Y P
DB-13A 28 Y P
DB-13A 30 Y P
DB-13A 32 Y P
DB-12 6 Y P
DB-12 18 Y P
DB-12 21 Y P
DB-12 22 Y P
DB-12 23 Y P
DB-12 27 Y P
DB-12 28 Y P
DB-12 29 Y P
DB-12 30 Y P
DB-12 33 Y P
DB-12 34 Y P
DB-12 35 Y P
DB-12 36 Y P
DB-12 38 Y P
DB-12 47 Y P
DB-12 48 Y P
DB-12B 2 Y P
DB-12B 3 Y P
DB-12B 4 Y P
DB-12B 5 Y P
DB-12B 6 Y P
DB-12B 7 Y P
DB-12B 8 Y P
DB-12B 9 Y P
DB-12B 10 Y P
DB-12B 11 Y P
DB-12B 12 Y P
DB-12B 13 Y P
SF43 Exit/Emergency

SF43 EXIT/EMERGENCY LIGHTING

Exit/Emergency Light Checklist
  • Check there has been no power interruption for at least 16 hours prior to test
  • Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
  • Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
  • Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Timers
  • Check timers for correct operation and timing
Switched Socket Outlets
  • Carry out visual check on SSOs for signs of misuse, blackening or deterioration
  • Check and report any outlets with multiple power boards overloading
  • Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No. ID No. Surface mounted or recessed? (SorR) Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-12 2 S Y Y Y P
DB-12 3 S Y Y Y P
DB-12 5 S Y Y Y P
DB-12 6 S Y N Y F Failed discharge test Y N
DB-12 7 R Y Y Y P
DB-12 9 R Y Y Y P
DB-13 11 S Y Y Y P
DB-13 12 S Y Y Y P
DB-13 14 S Y Y Y P
DB-13 15 S Y Y Y P
DB-13 18 R Y Y Y P
DB-13 19 R Y Y Y P
DB-13 20 R Y Y Y P
DB-13 21 R Y Y Y P
DB-13 22 R Y Y Y P
DB-13 23 R Y Y Y P
DB-13 24 R Y Y Y P
DB-13 25 R Y Y Y P
DB-13 26 S Y Y Y P
DB-13 28 R Y Y Y P
DB-13 30 S Y Y Y P
DB-13 31 S Y Y Y P
DB-13 32 S Y Y Y P
DB-13 33 S Y Y Y P
HTML Block
EXIT LIGHTS
Distribution Board No. ID No. Lamp OK? (YorN) Battery OK? (YorN) Condition OK? (YorN) Pass / Fail (PorF) Fault Repaired on Site (YorN) Under Warranty (YorN)
DB-12 1 Y Y Y P
DB-12 4 Y Y Y P
DB-12 8 Y N Y F Failed discharge test Y N
DB-13 10 Y N Y F Failed discharge test Y N
DB-13 13 Y Y Y P
DB-13 16 Y Y Y P
DB-13 17 Y Y Y P
DB-13 27 Y Y Y P
DB-13 29 Y Y Y P
DB-13 34 Y N Y F Failed discharge test Y N
SF44 General Lighting & Works

SF44 GENERAL LIGHTING & WORKS

General Checklist
  • Check correct operation of all luminaries
  • Report on any faulty luminaries/control gear
  • Provide costing to repair/replace
HTML Block
General Operation/Additional items
  • Check with Store Manager to ensure there are no other issues
  • Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.auYes
Lighting Report
Description of all lighting installed in store (eg. 21w bare batten) Existing (YorN)
High bay lights LED Y
Single defused T5 Y
Double bear batten twin T5 Y
LED down lights Y
2ft square defused Y
Are there any Warranty items needing to be repaired?No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item Location of Item (on premises) Quantity Details of fault /problem Repaired on Site? (YorN) Quote to be sent? (YorN) To return to Site Comments
Light display Samsung Fridges 1 Flickering lights N N TBA Flickering lights require replacing with 6 x LED Linkables. Quote recommendation listed on Fortnightly Report
Light box Samsung 1 Failed to luminate N N TBA Lights require replacing with 8 x LED Linkables. Quote recommendation listed on Fortnightly Report
Jumbo Exit light #10 Kitchens 1 Failed discharge test Y N N
Light box Bosch kitchen display 1 Light failed to luminate Y N N Replaced faulty light with 2 x LED Linkable
Light box Smeg kitchen 1 Light failed to luminate Y N N Replaced faulty light with 2 x LED Linkable
Jumbo Exit light #8 TV's 1 Failed discharge test Y N N
Light box TV brackets 1 Flickering lights N N TBA Flickering lights require replacing with 8 x LED Linkables. Quote recommendation listed on Fortnightly Report
Surface Mount Emergency light #6 Laptops 1 Failed discharge test Y N N Scissor Lift was required
LED troffer light LG Washing Machines 1 Failed to luminate Y N N Replaced with 4 x 14w lamps
LED panel light Frypans 1 Failed to luminate N N Y This was found when technician was already on site with Scissor Lift however no materials. To be replaced upon Kitchen Relay Upgrade next month when technician has Scissor Lift to avoid second charge
Jumbo Exit light #34 BOH 1 Failed discharge test Y N N
Downlight Smeg display 1 Failed to luminate Y N N
Circuit breaker #8 Switchboard 1 Tripping N N TBA Washing machine circuit overloaded after new stands attached. 2 x new power circuits required to separate power. Quote recommendation listed on Fortnightly Report. Alternatively, these works can be completed when technician is on site next month for Kitchen Relay Upgrade
Site Status SelectorStore now fully compliant
Next Test Due in 6 months30/11/2022