Carry out push button test and record the results below.
RCD Details (Biennial)
Distribution Board No.
Circuit No.
Push Button (YorN)
0 Degrees
180 Degrees
Pass / Fail (PorF)
Fault?
Repaired on Site (YorN)
DBT12A
1
Y
19
19
P
2
Y
20
20
P
3
Y
20
20
P
4
Y
19
19
P
5
Y
31
32
P
6
Y
23
30
P
7
Y
19
19
P
8
Y
19
21
P
9
Y
19
19
P
10
Y
19
19
P
11
Y
19
19
P
12
Y
17
17
P
13
Y
20
19
P
15
Y
19
19
P
17
Y
19
19
P
19
Y
19
19
P
21
Y
19
18
P
22
Y
15
15
P
23
Y
20
20
P
24
Y
19
19
P
25
Y
14
14
P
27
Y
18
19
P
29
Y
19
21
P
31
Y
20
20
P
37
Y
21
21
P
51
Y
21
20
P
53
Y
17
17
P
55
Y
20
19
P
DBT12B
1
Y
15
15
P
2
Y
20
19
P
3
Y
21
19
P
4
Y
19
19
P
5
Y
20
19
P
6
Y
22
21
P
7
Y
19
20
P
8
Y
30
29
P
9
Y
17
17
P
10
Y
22
22
P
11
Y
20
23
P
12
Y
16
16
P
13
Y
25
21
P
14
Y
19
19
P
15
Y
19
19
P
16
Y
17
17
P
17
Y
16
15
P
18
Y
19
19
P
19
Y
16
16
P
20
Y
19
19
P
21
Y
19
19
P
25
Y
19
20
P
27
Y
18
19
P
28
Y
19
20
P
29
Y
17
17
P
30
Y
19
19
P
31
Y
24
24
P
32
Y
19
19
P
33
Y
15
15
P
34
Y
14
19
P
36
Y
19
19
P
DBT12B-SUBBOARD
22
Y
18
18
P
24
Y
33
33
P
26
Y
34
34
P
44
Y
32
32
P
55
Y
19
19
P
THERMOGRAPHIC TEST RESULTS
THERMOGRAPHIC TEST RESULTS
SF43 Exit/Emergency
SF43 EXIT/EMERGENCY LIGHTING
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
Exit/Emergency Light Checklist
Check there has been no power interruption for at least 16 hours prior to test
Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
Timers
Check timers for correct operation and timing
Switched Socket Outlets
Carry out visual check on SSOs for signs of misuse, blackening or deterioration
Check and report any outlets with multiple power boards overloading
Ensure any power boards used have an integral over-current limiter
HTML Block
EMERGENCY LIGHTS
Distribution Board No.
ID No.
Surface mounted or recessed? (SorR)
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DBT12A
EM1
S
Y
Y
Y
P
EM2
S
Y
Y
Y
P
EM3
S
Y
Y
Y
P
EM4
S
Y
Y
Y
P
EM5
S
Y
Y
Y
P
EM6
S
Y
Y
Y
P
EM7
S
Y
Y
Y
P
EM8
S
Y
Y
Y
P
EM9
R
Y
Y
Y
P
EM10
R
Y
Y
Y
P
EM11
R
Y
Y
Y
P
EM12
R
Y
Y
Y
P
EM13
R
Y
Y
Y
P
EM14
R
Y
Y
Y
P
EM15
R
Y
Y
Y
P
EM16
R
Y
Y
Y
P
EM17
R
Y
Y
Y
P
HTML Block
EXIT LIGHTS
Distribution Board No.
ID No.
Lamp OK? (YorN)
Battery OK? (YorN)
Condition OK? (YorN)
Pass / Fail (PorF)
Fault
Repaired on Site (YorN)
Under Warranty (YorN)
DBT12A
EX1
Y
Y
Y
P
EX2
Y
Y
Y
P
EX3
Y
Y
Y
P
EX4
Y
Y
Y
P
EX5
Y
F
Y
P
FAULTY BATTERY
Y
N
EX6
Y
Y
Y
P
EX7
Y
Y
Y
P
EX8
Y
Y
Y
P
EX9
Y
Y
Y
P
EX10
Y
Y
Y
P
SF44 General Lighting & Works
SF44 GENERAL LIGHTING & WORKS
General Checklist
Check correct operation of all luminaries
Report on any faulty luminaries/control gear
Provide costing to repair/replace
HTML Block
General Operation/Additional items
Check with Store Manager to ensure there are no other issues
Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
HTML Block
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au
Yes
Are there any Warranty items needing to be repaired?
No
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's
Defect Item
Location of Item (on premises)
Quantity
Details of fault /problem
Repaired on Site? (YorN)
Quote to be sent? (YorN)
To return to Site
Comments
1
KITCHENS
1
LED DOWNLIGHT NO POWER.
Y
N
N
OPENED DISPLAY AND INSTALLED A NEW POWER BOARD ABOVE RANGE HOODS TO SUPPLY DOWN LIGHT.
2
05 - BOH
1
FAULTY EXIT
Y
N
N
REPLACED FITTING
3
STAFF KITCHEN
1
FAULTY ELECTRONIC BALLAST
Y
N
N
REPLACED ELECTRONIC BALLAST AND 2 X 28W TUBES
4
TV SECTION
2
THE TCL TV RACK HAS TWO OF THE FOUR SIGNS NOT WORKING.
N/A
N/A
N/A
SUPPLIER TO ORGANISE TO REPAIR.
5
DRYER SECTION
1
FISHER AND PAYKEL SIGN NOT LIT
N/A
N/A
N/A
SUPPLIER TO SEND CONTRACTOR TO REPAIR.
6
BOH
1
DOOR BELL
Y
N
N
INSTALLED NEW WEATHER PROOF DOOR BELL.
7
STORE SWITCH BOARD SCHEDULES
1
SWITCHBOARD LEGENDS NOT CORRECT
Y
N
N
SWITCHBOARD TB12B SCHEDULE WAS NOT CORRECT. WE COMPLETED FRONT OF STORE AUDIT AND COMPLETED NEW ASBUILTS AND SWITCHBOARD LEGEND.
8
THROUGHOUT STORE
1
EMERGENCY LIGHT PLAN
Y
N
N
COMPLETED FULL STORE AUDIT ON EMERGENCY LIGHTS AND COMPLETED A NEW MARKED UP DRAWING OF ALL EMERGENCY LIGHTS. THE ORIGINAL DRAWING HAD MISSING FITTINGS.
9
FRONT MAIN COUNTER
1
THE POWER CIRCUIT THAT SUPPLIES THE MAIN COUNTER ALSO SUPPLIES LAPTOP TABLE. THIS MAY CAUSE A RISK OF THE MAIN COUNTER BEING SHUT OFF BY ACCIDENT OR BY A FAULT TO THE LAPTOP TABLE. WE WILL NEED TO INSTALL NEW POWER CIRCUIT TO LAPTOP TABLE AND JUNCTION THE MAIN COUNTER CABLE (TB12B - CB29)
N
N
N
ADDED TO FORTNIGHTLY REPAIRS LIST
10
THROUGHOUT STORE
1
THERE ARE MANY CIRCUITS THAT ARE OVER LOADED. CIRCUITS REQUIRE SPLITTING
N
N
N
ADDED TO FORTNIGHTLY REPAIRS LIST
Site Status Selector
Store now fully compliant
Next Test Due in 6 months
06/01/2023