State | NSW |
---|
Date of Visit | 04/07/2022 |
---|
Technician's Name | con karakiozis |
---|
Which Company are you working for? | Sturdie Trade Services |
---|
Sturdie Job Number | 66869 |
---|
Email | Email hidden; Javascript is required. |
---|
The Good Guys Site in NSW | tempe |
---|
|
|
---|
Location Name | Tempe |
---|
| |
---|
HTML Block |
|
---|
Test Period | Biennial Test (once every two years) |
---|
Push Button Test | - Carry out push button test for correct operation
|
---|
Carry out push button test for correct operation | |
---|
HTML Block |
|
---|
Carry out test with RCD Tester | Carry out push button test and record the results below. |
---|
RCD Details (Biennial) | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
DB1 |
1 |
Y |
103 |
111 |
P |
|
|
|
2 |
Y |
12 |
12 |
P |
|
|
|
3 |
Y |
274 |
219 |
P |
|
|
|
4 |
Y |
20 |
20 |
P |
|
|
|
5 |
Y |
6 |
9 |
P |
|
|
|
6 |
Y |
9 |
9 |
P |
|
|
|
7 |
Y |
6 |
7 |
P |
|
|
|
8 |
Y |
60 |
60 |
P |
|
|
|
9 |
Y |
10 |
8 |
P |
|
|
|
10 |
Y |
8 |
8 |
P |
|
|
|
11 |
Y |
32 |
32 |
P |
|
|
|
12 |
Y |
18 |
17 |
P |
|
|
|
13 |
Y |
249 |
415 |
P |
|
|
|
14 |
Y |
10 |
10 |
P |
|
|
|
15 |
Y |
109 |
109 |
P |
|
|
|
16 |
Y |
8 |
8 |
P |
|
|
|
17 |
Y |
11 |
11 |
P |
|
|
|
18 |
Y |
6 |
6 |
P |
|
|
|
19 |
Y |
54 |
11 |
P |
|
|
|
20 |
Y |
169 |
168 |
P |
|
|
|
21 |
Y |
13 |
11 |
P |
|
|
|
22 |
Y |
35 |
30 |
P |
|
|
|
23 |
Y |
101 |
118 |
P |
|
|
|
26 |
Y |
63 |
47 |
P |
|
|
DB2 |
1 |
Y |
39 |
35 |
P |
|
|
|
5 |
Y |
29 |
29 |
P |
|
|
|
6 |
Y |
29 |
29 |
P |
|
|
|
7 |
Y |
19 |
20 |
P |
|
|
|
8 |
Y |
19 |
24 |
P |
|
|
|
31 |
Y |
16 |
17 |
P |
|
|
DB-2A |
17 |
Y |
27 |
26 |
P |
|
|
|
19 |
Y |
29 |
30 |
P |
|
|
|
21 |
Y |
26 |
26 |
P |
|
|
|
23 |
Y |
27 |
28 |
P |
|
|
|
27 |
Y |
14 |
14 |
P |
|
|
|
29 |
Y |
15 |
15 |
P |
|
|
|
31 |
Y |
17 |
18 |
P |
|
|
|
33 |
Y |
17 |
17 |
P |
|
|
|
35 |
Y |
17 |
16 |
P |
|
|
|
37 |
Y |
16 |
15 |
P |
|
|
|
39 |
Y |
19 |
18 |
P |
|
|
|
41 |
Y |
14 |
13 |
P |
|
|
|
43 |
Y |
20 |
18 |
P |
|
|
|
45 |
Y |
18 |
18 |
P |
|
|
|
47 |
Y |
14 |
21 |
P |
|
|
|
49 |
Y |
93 |
29 |
F |
THE CURRENT RCBO WAS INCORRECT TYPE AND WAS SWITCHING ON AND OFF IN THE WRONG DIRECTION |
Y |
|
51 |
Y |
14 |
15 |
P |
|
|
|
53 |
Y |
14 |
14 |
P |
|
|
|
55 |
Y |
19 |
19 |
P |
|
|
|
56 |
Y |
18 |
19 |
P |
|
|
|
54 |
Y |
16 |
16 |
P |
|
|
|
52 |
Y |
16 |
15 |
P |
|
|
|
50 |
Y |
16 |
16 |
P |
|
|
|
48 |
Y |
16 |
16 |
P |
|
|
|
46 |
Y |
18 |
18 |
P |
|
|
|
44 |
Y |
15 |
15 |
P |
|
|
|
42 |
Y |
14 |
17 |
P |
|
|
|
40 |
Y |
18 |
18 |
P |
|
|
|
38 |
Y |
18 |
18 |
P |
|
|
|
36 |
Y |
18 |
18 |
P |
|
|
|
34 |
Y |
21 |
26 |
P |
|
|
|
32 |
Y |
15 |
15 |
P |
|
|
|
30 |
Y |
16 |
15 |
P |
|
|
|
---|
THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
---|
SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
---|
Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
---|
Timers | - Check timers for correct operation and timing
|
---|
Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
---|
HTML Block |
|
---|
EMERGENCY LIGHTS | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB2A |
EM1 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM2 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM3 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM4 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM5 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM6 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM7 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM9 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM10 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM11 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM12 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM13 |
R |
Y |
Y |
Y |
P |
|
|
|
|
EM14 |
S |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM15 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM16 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM17 |
S |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM18 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM19 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM20 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM21 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM22 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM23 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM24 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM25 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM26 |
S |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM27 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM28 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM29 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM30 |
S |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM31 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM32 |
S |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM33 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM34 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM35 |
S |
Y |
N |
Y |
F |
BATTERY |
Y |
N |
|
EM36 |
S |
Y |
Y |
Y |
P |
|
|
|
|
EM37 |
S |
Y |
Y |
Y |
P |
|
|
|
|
---|
HTML Block |
|
---|
EXIT LIGHTS | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
DB2A-CB42 |
EX1 |
Y |
Y |
Y |
P |
|
|
|
|
EX2 |
Y |
Y |
Y |
P |
|
|
|
|
EX3 |
Y |
Y |
Y |
P |
|
|
|
|
EX4 |
Y |
Y |
Y |
P |
|
|
|
|
EX5 |
Y |
Y |
Y |
P |
|
|
|
|
EX6 |
Y |
Y |
Y |
P |
|
|
|
|
EX7 |
Y |
Y |
Y |
P |
|
|
|
|
EX8 |
Y |
Y |
Y |
P |
|
|
|
|
EX9 |
Y |
Y |
Y |
P |
|
|
|
|
EX10 |
Y |
F |
Y |
F |
BATTERY |
Y |
N |
|
EX11 |
Y |
Y |
Y |
P |
|
|
|
|
EX12 |
Y |
Y |
Y |
P |
|
|
|
|
EX13 |
Y |
Y |
Y |
P |
|
|
|
|
EX14 |
Y |
Y |
Y |
P |
|
|
|
|
EX15 |
Y |
Y |
Y |
P |
|
|
|
|
EX16 |
Y |
Y |
Y |
P |
|
|
|
|
EX17 |
Y |
Y |
Y |
P |
|
|
|
|
EX18 |
Y |
Y |
Y |
P |
|
|
|
|
EX19 |
Y |
Y |
Y |
P |
|
|
|
|
EX20 |
Y |
Y |
Y |
P |
|
|
|
|
EX21 |
Y |
Y |
Y |
P |
|
|
|
|
EX22 |
Y |
Y |
Y |
P |
|
|
|
|
EX23 |
Y |
Y |
Y |
P |
|
|
|
|
EX24 |
Y |
Y |
Y |
P |
|
|
|
|
---|
SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
---|
General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
---|
HTML Block |
|
---|
General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
---|
HTML Block |
|
---|
Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
---|
Lighting Report | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
LED High Bays 150W |
Y |
LED Downlight 210mm 31W S9075DP WH |
Y |
Ledline 4ft 40W SLD4000CW |
Y |
LED Strip Display Signs DC24V |
Y |
LED Downlight 11W S9071CP WH |
Y |
|
---|
Are there any Warranty items needing to be repaired? | No |
---|
LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
SM EMERGENCY FITTINGS |
AROUND STORE |
6 |
EMERGENCY FITTINGS FAILED. |
Y |
N |
N |
RETURNED TO SITE AND REPLACED WITH NEW. |
BAR FRIDGES |
SHOP FLOOR |
2 |
TWO LED SIGNS ARE FAULTY AND NEED REPLACING. |
N/A |
N/A |
N/A |
NEED TO SPEAK TO THE SIGN CONTRACTOR OR REECE. |
EXIT LIGHT |
#10 |
1 |
FAILED 90 MIN TEST |
Y |
N |
N |
RETURNED TO SITE AND REPLACED WITH NEW. |
EXIT LIGHT |
BOH |
1 |
FALLEN FROM CEILING |
Y |
N |
N |
RE-SECURED WITH JACK CHAIN & CABLE TIES |
EMERGENCY LIGHTING PLAN |
SITE FOLDER |
1 |
NOT ACCURATE |
Y |
N |
N |
UPDATED PLAN AND LEFT COPY IN SITE FOLDER |
SWITCHBOARDS |
DB1,DB2 & DB2A |
3 |
WE WILL NEED TO AUDIT SWITCHBOARD LEGENDS AND FLOOR CIRCUITS. AS THEY DO NOT MATCH UP TO CURRENT LABELS |
N |
N |
N |
ADDED TO FORTNIGHTLY REPAIRS LIST |
SONY TV WALL BAY DISPLAY |
DISCONNECTED DUE TO WATER LEAK |
1 |
SONY TV WALL BAY. WATER LEAK. ISOLATED CIRCUIT. |
Y |
N |
N |
RETURNED TO SITE AND RECONNECTED |
RCBO |
BOH MSB |
1 |
INCORRECT TYPE |
Y |
N |
N |
REPLACED WITH CORRECT RCBO |
|
---|
Site Status Selector | Store now fully compliant |
---|
Next Test Due in 6 months | 03/01/2023 |
---|
| |
---|
| |