| Partner Name | Built Electrical QLD |
|---|
| State | QLD |
|---|
| Date of Visit | 12/08/2022 |
|---|
| Technician's Name | Gregory Jones |
|---|
| Which Company are you working for? | Sturdie Trade Services |
|---|
| Sturdie Job Number | 67392 |
|---|
| Email | Email hidden; Javascript is required. |
|---|
| The Good Guys Site in QLD | carseldine |
|---|
|
|
|---|
| Location Name | Carseldine |
|---|
| |
|---|
| HTML Block |
|
|---|
| Test Period | Biennial Test (once every two years) |
|---|
| Push Button Test | - Carry out push button test for correct operation
|
|---|
| Carry out push button test for correct operation | |
|---|
| HTML Block |
|
|---|
| Carry out test with RCD Tester | Carry out push button test and record the results below. |
|---|
| RCD Details (Biennial) | | Distribution Board No. |
Circuit No. |
Push Button (YorN) |
0 Degrees |
180 Degrees |
Pass / Fail (PorF) |
Fault? |
Repaired on Site (YorN) |
| DB1 |
1 |
Y |
14 |
23 |
P |
|
|
|
2 |
Y |
14 |
22 |
P |
|
|
|
3 |
Y |
17 |
28 |
P |
|
|
|
5 |
Y |
20 |
22 |
P |
|
|
|
6 |
Y |
19 |
18 |
P |
|
|
|
9 |
Y |
17 |
19 |
P |
|
|
|
10 |
Y |
7 |
7 |
P |
|
|
|
13 |
Y |
17 |
24 |
P |
|
|
|
14 |
Y |
7 |
16 |
P |
|
|
|
17 |
Y |
18 |
29 |
P |
|
|
|
18 |
Y |
17 |
27 |
P |
|
|
|
19 |
Y |
23 |
17 |
P |
|
|
|
20 |
Y |
14 |
30 |
P |
|
|
|
21 |
Y |
20 |
24 |
P |
|
|
|
22 |
Y |
18 |
28 |
P |
|
|
|
23 |
Y |
19 |
22 |
P |
|
|
|
24 |
Y |
22 |
21 |
P |
|
|
|
25 |
Y |
23 |
24 |
P |
|
|
|
27 |
Y |
21 |
29 |
P |
|
|
|
28 |
Y |
20 |
29 |
P |
|
|
|
29 |
Y |
29 |
19 |
P |
|
|
|
32 |
Y |
19 |
20 |
P |
|
|
|
33 |
Y |
29 |
28 |
P |
|
|
|
35 |
Y |
19 |
22 |
P |
|
|
|
37 |
Y |
29 |
28 |
P |
|
|
|
41 |
Y |
19 |
20 |
P |
|
|
|
52 |
Y |
20 |
19 |
P |
|
|
|
53 |
Y |
16 |
22 |
P |
|
|
| DB2 |
Control |
Y |
7 |
16 |
P |
|
|
|
1 |
Y |
16 |
25 |
P |
|
|
|
3 |
Y |
17 |
25 |
P |
|
|
|
5 |
Y |
22 |
23 |
P |
|
|
|
6 |
Y |
22 |
22 |
P |
|
|
|
7 |
Y |
19 |
23 |
P |
|
|
|
8 |
Y |
19 |
22 |
P |
|
|
|
9 |
Y |
22 |
21 |
P |
|
|
|
13 |
Y |
7 |
17 |
P |
|
|
|
14 |
Y |
21 |
29 |
P |
|
|
|
15 |
Y |
20 |
22 |
P |
|
|
|
16 |
Y |
7 |
18 |
P |
|
|
| DB3 BOH |
19 |
Y |
45 |
45 |
P |
|
|
|
21 |
Y |
36 |
36 |
P |
|
|
|
23 |
Y |
37 |
37 |
P |
|
|
|
25 |
Y |
36 |
36 |
P |
|
|
|
27 |
Y |
26 |
26 |
P |
|
|
|
29 |
Y |
32 |
34 |
P |
|
|
|
30 |
Y |
36 |
36 |
P |
|
|
|
31 |
Y |
64 |
66 |
P |
|
|
|
35 |
Y |
21 |
29 |
P |
|
|
|
44 |
Y |
22 |
24 |
P |
|
|
|
46 |
Y |
130 |
19 |
P |
|
|
|
48 |
Y |
22 |
18 |
P |
|
|
|
50 |
Y |
30 |
29 |
P |
|
|
|
52 |
Y |
36 |
36 |
P |
|
|
|
54 |
Y |
23 |
17 |
P |
|
|
|
56 |
Y |
27 |
18 |
P |
|
|
|
59 |
Y |
66 |
66 |
P |
|
|
|
61 |
Y |
44 |
33 |
P |
|
|
|
62 |
Y |
23 |
24 |
P |
|
|
|
63 |
Y |
37 |
37 |
P |
|
|
|
64 |
Y |
29 |
19 |
P |
|
|
|
65 |
Y |
33 |
22 |
P |
|
|
|
66 |
Y |
32 |
25 |
P |
|
|
|
67 |
Y |
24 |
55 |
P |
|
|
|
68 |
Y |
21 |
23 |
P |
|
|
|
69 |
Y |
22 |
26 |
P |
|
|
|
70 |
Y |
72 |
69 |
P |
|
|
|
71 |
Y |
32 |
35 |
P |
|
|
|
72 |
Y |
32 |
33 |
P |
|
|
|
73 |
Y |
55 |
34 |
P |
|
|
|
74 |
Y |
29 |
66 |
P |
|
|
|
75 |
Y |
22 |
23 |
P |
|
|
|
76 |
Y |
51 |
57 |
P |
|
|
|
77 |
Y |
67 |
51 |
P |
|
|
|
78 |
Y |
52 |
72 |
P |
|
|
|
79 |
Y |
29 |
53 |
P |
|
|
|
81 |
Y |
61 |
62 |
P |
|
|
|
82 |
Y |
36 |
36 |
P |
|
|
|
83 |
Y |
30 |
30 |
P |
|
|
| DB4 BOH |
16 |
Y |
24 |
18 |
P |
|
|
|
18 |
Y |
28 |
18 |
P |
|
|
|
|---|
| THERMOGRAPHIC TEST RESULTS |
THERMOGRAPHIC TEST RESULTS
|
|---|
| SF43 Exit/Emergency |
SF43 EXIT/EMERGENCY LIGHTING
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install label with date & fitting number
|
|---|
| Exit/Emergency Light Checklist | - Check there has been no power interruption for at least 16 hours prior to test
- Carry out discharge test to ensure the luminaries remain illuminated for the required in service duration (90 minutes)
- Re-instate power to luminaries and check that the battery charge operation indicator functions correctly
- Report any failures and replace faulty fittings with stock provided by Sturdie Trade Services – install sticker with date & fitting number
- Using a clean cloth, clean reflective surfaces of all exit and emergency luminaires.
|
|---|
| Timers | - Check timers for correct operation and timing
|
|---|
| Switched Socket Outlets | - Carry out visual check on SSOs for signs of misuse, blackening or deterioration
- Check and report any outlets with multiple power boards overloading
- Ensure any power boards used have an integral over-current limiter
|
|---|
| HTML Block |
|
|---|
| EMERGENCY LIGHTS | | Distribution Board No. |
ID No. |
Surface mounted or recessed? (SorR) |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 1 |
1 |
S |
Y |
Y |
Y |
P |
|
|
|
|
2 |
S |
Y |
Y |
Y |
P |
|
|
|
|
3 |
S |
Y |
Y |
Y |
P |
|
|
|
|
4 |
S |
Y |
Y |
Y |
P |
|
|
|
|
5 |
S |
Y |
Y |
Y |
P |
|
|
|
|
6 |
S |
Y |
Y |
Y |
P |
|
|
|
|
7 |
S |
Y |
Y |
Y |
P |
|
|
|
|
8 |
R |
Y |
Y |
Y |
P |
|
|
|
|
9 |
R |
Y |
Y |
Y |
P |
|
|
|
|
10 |
S |
Y |
Y |
Y |
P |
|
|
|
|
11 |
R |
Y |
Y |
Y |
P |
|
|
|
|
12 |
R |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| HTML Block |
|
|---|
| EXIT LIGHTS | | Distribution Board No. |
ID No. |
Lamp OK? (YorN) |
Battery OK? (YorN) |
Condition OK? (YorN) |
Pass / Fail (PorF) |
Fault |
Repaired on Site (YorN) |
Under Warranty (YorN) |
| DB 1 |
1 |
Y |
Y |
Y |
P |
|
|
|
|
2 |
N |
Y |
N |
F |
Failed 90 Min Test |
Y |
N |
|
3 |
Y |
Y |
Y |
P |
|
|
|
|
4 |
Y |
Y |
Y |
P |
|
|
|
|
5 |
Y |
Y |
Y |
P |
|
|
|
|
6 |
Y |
Y |
Y |
P |
|
|
|
|
7 |
Y |
Y |
Y |
P |
|
|
|
|
8 |
Y |
Y |
Y |
P |
|
|
|
|
9 |
N |
Y |
N |
F |
Failed 90 Min Test |
Y |
N |
|
10 |
Y |
Y |
Y |
P |
|
|
|
|
11 |
Y |
Y |
Y |
P |
|
|
|
|
12 |
N |
Y |
Y |
F |
Failed 90 Min Test |
Y |
N |
|
13 |
Y |
Y |
Y |
P |
|
|
|
|
14 |
Y |
Y |
Y |
P |
|
|
|
|
15 |
Y |
Y |
Y |
P |
|
|
|
|
16 |
Y |
Y |
Y |
P |
|
|
|
|
17 |
N |
Y |
Y |
F |
Failed 90 Min Test |
Y |
N |
|
18 |
Y |
Y |
Y |
P |
|
|
|
|
19 |
Y |
Y |
Y |
P |
|
|
|
|
|---|
| SF44 General Lighting & Works |
SF44 GENERAL LIGHTING & WORKS
|
|---|
| General Checklist | - Check correct operation of all luminaries
- Report on any faulty luminaries/control gear
- Provide costing to repair/replace
|
|---|
| HTML Block |
|
|---|
| General Operation/Additional items | - Check with Store Manager to ensure there are no other issues
- Ensure any other electrical work is completed as per Sturdie Trade Services ie, affix label to switchboard
|
|---|
| HTML Block |
|
|---|
| Are there accurate switchboard legends within each switchboard? Please take a photo of legend/s & send with report to maintenance@sturdie.com.au | Yes |
|---|
| Lighting Report | | Description of all lighting installed in store (eg. 21w bare batten) |
Existing (YorN) |
| UFO LED High bay lights |
Y |
| LED Pelmet light boxes |
Y |
| LED Downlights 70mm cutout |
Y |
| 30w LED Panels |
Y |
| 35w LED Battens |
Y |
|
|---|
| Are there any Warranty items needing to be repaired? | Yes |
|---|
| WARRANTY | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault/problem |
Manufacturer |
Part Number |
Repaired on Site |
Comments |
| High bays |
Kinsman & Smart Home |
2 |
Faulty |
Davis |
- |
Y |
Returned to site and replaced with new. under warranty |
|
|---|
| Geotag photo(s) | - Have you sent the Geotag photo(s) to maintenance@sturdie.com.au, referring to the Store Location in the email, e.g. Canberra City?
|
|---|
| LIST OF REPAIRS & ADDITIONAL WORKS REQUIRED - (ALL FIELDS MANDATORY) - Please supply photo's | | Defect Item |
Location of Item (on premises) |
Quantity |
Details of fault /problem |
Repaired on Site? (YorN) |
Quote to be sent? (YorN) |
To return to Site |
Comments |
| Led light box |
Games |
1 |
Not plugged in |
Y |
N |
N |
Plugged in & now working as intended. |
| LED panel |
Warehouse infront of roller door |
2 |
Very dull and discoloured |
Y |
N |
N |
Returned to site and replaced with new. |
| SAT counter |
Kitchen |
1 |
Power & data hanging down |
N |
N |
N |
Sat counter has been disconnected and removed. Power / data cables to be coiled up. Observation only. |
| Exit Light |
#2 |
1 |
Failed 90 Min Test |
Y |
N |
N |
Returned to site and replaced with new. |
| Exit Light |
#9 |
1 |
Failed 90 Min Test |
Y |
N |
N |
Returned to site and replaced with new. |
| Exit Light |
#12 |
1 |
Failed 90 Min Test |
Y |
N |
N |
Returned to site and replaced with new. |
| Exit Light |
#17 |
1 |
Failed 90 Min Test |
Y |
N |
N |
Returned to site and replaced with new. |
|
|---|
| Site Status Selector | QLD - Maintenance has been completed in accordance to ASS2293.2 and QDC MP6.1. - Store now fully compliant |
|---|
| Next Test Due in 6 months | 12/08/2024 |
|---|
| |
|---|
| |